Forwards Public Version of Rev 2 to Emergency Plan Implementing Procedure GO-EIP-131, Emergency Operations Ctr - Flintridge,Emergency Equipment & Supplies
ML20073H800
Person / Time
Site: Farley  
Issue date: 03/30/1983
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
Shared Package
ML20073H791 List:
References
NUDOCS 8304190050
Download: ML20073H800 (3)


Text

_

Melling Address Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 y

1 j

F. L Clayton, Jr.

g g e g ; g "'

AlabamaPower the soahem electnc system March 30, 1983 s

Docket No. 50-348 Docket No. 50-364 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

s Enclosed in accordance with 10CFR50, Appendix E requirements are two copies of Emergency Implementing Procedure GO-EIP-131, Rev. 2.

Also en-closed is a Document Transmittal Acknowledgement Form which we request that you sign and return so that we may verify your receipt of these documents in accordance with our document control procedures.

On August 12 and October 4, 1982 ten (10) copies each of seventeen (17) General Office Emergency Implementing Procedures (G0-EIPs) were trans-mitted from the Alabama Power Company Corporate Office to the Director of Nuclear Reactor Regulation. On December 21, 1982 ten (10) copies each of three (3) revised GO-EIPs were transmitted to the Director Nuclear Reactor Regulation, Attention Mr. Steve A. Varga, Chief Operating Reactors Branch.

Each of these transmittals was accompanied by a Document Transmittal Acknowledgement Form and to date we have not received any of these forms from the addressees.

Enclosed are duplicates of the transmittal forms.

Document Transmittal Forms are also outstanding for copies of Emergency Implementing Procedures and Emergency Plan copies transmitted from Farley Nuclear Plant Document Control. Duplicates of those transmittals are also enclosed. We respectfully request that if the NRC is not in a position to sign and return Transmittal Acknowledgement Forms that we be notified of this in writing so that this deviation from our document control procedures can be noted.

In such case, future submittals will be sent without the Document Transmittal Forms.

b 0

K0 8304190050 830413 PDR ADOCK 05000348

.. PDR

'l e

<s Document Control Desk - NRC March 30, 1983 Page Two Please note that G0-EIP copy numbers 35 through 42 of the previous transmittals will no longer be maintained current as controlled copies due to the change in regulation requirements.

If you are~ either not currently in possession of the previously transmitted procedures, or are unable to obtain possession of those procedures, please notify us and we will retransmit copies as necessary.

Yours very'truly, el_

b L.

layton,p.

FLCJr/KWM:nac Enclosures xc: Mr. E. A. Reeves Mr. S. A. Varga s

, W I

I l

1 k

l e

e-

~-

.,-,m

,-m---

-~

..--..~...-:.--_-..----.----.......-..._

e.

((

ALABAMA POWER COMPANY -

s NUCLEAR GENERATION DEPARTMENT GENERAL OFFICE NUCLEAR GENERATION PROCEDURES DOCUMENT TRANSMITiAL ACKNOWLEDGEMENT To: Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Al 35291 Attention:

Nuclear Generation DepartmeHt~

B300 Flintridge Building Acknowledge the receipt of procedure / revision G0-EIP-131 Rev. 2 The superceded procedure was destroyed.

Comments:

33,34 Copy Number Date Signature

( 0 6

Gis.

J..

-