Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20211J9861999-09-0101 September 1999 Application for Amends to Licenses DPR-53 & DPR-69,changing Definition of Azimuthal Power Tilt in TS 1.1,correcting Peak Linear Heat Rate Safety Limit in TS 2.1.1.2 & Correcting Dc Voltage Range Listed in Surveillance Requirement 3.3.6.2 ML20211G7591999-08-27027 August 1999 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 3.7.13 to Allow Placement of One or More Fuel Assemblies on SFP Rack Spacers to Support Fuel Reconstruction Activities During Continuing Fuel Assembly Movement ML20196E2101998-11-30030 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,allowing Repair of Defective SG Tubes with leak-limiting Alloy 800 sleeves.Non-proprietary Rev 03-P to CEN-633-NP & Proprietary Rev 03-P to CEN-633-P,encl.Proprietary Info Withheld ML20195K3711998-11-20020 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,removing TS Originally Developed from Reg Guide 1.35 & Implementing Requirements of 1992 Edition Through 1992 Addenda of ASME B&PV Code Section Xi,Subsections IWE & Iwl,Per 10CFR50.55a ML20196A6001998-11-20020 November 1998 Application for Amends to Licenses DPR-53 & DPR-69, Requesting Indirect Transfer of Control,Pursuant to 10CFR72.50,of Matls License SNM-2505 for Plant ISFSI ML20195J7131998-11-19019 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 3.7.6, SWS, by Adding One SWS Heat Exchanger Inoperable as New Condition for LCO 3.7.6 ML20154N1861998-10-16016 October 1998 Application for Amends to Licenses DPR-53 & DPR-69 to Incorporate Revised TS 3.3.1 & 3.3.2 to Clarify Inconsistency Between TS Wording & Design Bases as Described in TS Bases & UFSAR ML20236S1341998-07-20020 July 1998 Application for Amend to License DPR-59,implementing Mod That Involves Replacing SW Heat Exchangers W/New Plate & Frame Heat Exchangers Having Increased Thermal Performance Capability ML20236S5591998-07-20020 July 1998 Application for Amend to Licenses DPR-53 & DPR-69,providing Alternate Cooling Water Supply to Maintain EDGs Operability During 1999 Refueling Outage ML20198K9591998-01-12012 January 1998 Rev 11 to 961204 Application for Amends to Licenses DPR-53 & DPR-69,converting to Improved Sts,Per NUREG-1432 ML20217K6591997-10-22022 October 1997 Application for Amends to Licenses DPR-53 & DPR-69, Incorporating Both Steady State & Transient Degraded Voltage Setpoints Into Tss,As Opposed to Current Single Degraded Voltage Setpoint ML20211J2691997-10-0202 October 1997 Application for Amend to License DPR-53,revising TS to Reflect New Electrical Capacity for 1B Edg.Significant Hazards Considerations Associated W/Change Have Been Evaluated ML20141F9181997-05-16016 May 1997 Application for Amend to License DPR-53,implementing Mod Involves Replacing Service Water Heat Exchangers W/New Plate & Frame Heat Exchangers Having Increased Thermal Performance Capability ML20136A9751997-03-0606 March 1997 Application for Amend to License DPR-69,allowing Mod to Unit 2 SW Sys Which Constitutes Unreviewed Safety Question in 10CFR50.59 ML20134D2871997-01-31031 January 1997 Application for Amends to Licenses DPR-53 & DPR-69,changing to Support Larger Number of Plugged SG Tubes for Future Operating Cycles ML20149M0801996-12-0404 December 1996 Application for Amends to Licenses DPR-53 & DPR-69,revising TSs to Be Generally Consistent w/NUREG-1432,Rev 1,thus Replacing 2 Current Sets of TSs W/Single Set Applicable to Both Units ML20135A5171996-11-26026 November 1996 Application for Amends to Licenses DPR-53 & DPR-69,adopting Option B of 10CFR50,App J,To Require Types B & C Containment Leakage Rate Testing to Be Performed on performance-based Testing Schedule ML20128H5971996-10-0303 October 1996 Application for Amend to License DPR-53,changing Provisions for Receiving,Possessing & Using Byproduct,Source & Special Nuclear Matl at Plant ML20117L7801996-09-10010 September 1996 Application for Amends to Licenses DPR-53 & DPR-69 Requesting Extension of ESFAS Automatic Actuation Logic Surveillance from Monthly to Quarterly ML20116F8231996-08-0101 August 1996 Application for Amends to Licenses DPR-53 & DPR-69,allowing Use of Blind Flanges During Modes 1-4 in Plant Containment Purge Sys ML20116E3571996-07-26026 July 1996 Application for Amends to Licenses DPR-53 & DPR-69,to Repair Defective SG Tubes by Electrosleeving ML20117J1911996-05-28028 May 1996 Application for Amend to License DPR-53 & DPR-69,requesting Exigent Amends to Allow Installation of Proposed Modification of Unit 1 & 2 Service Water (SRW) Systems ML20101K5911996-03-28028 March 1996 Application for Amends to Licenses DPR-53 & DPR-69, Requesting to Reduce Moderator Temp Coefficient Limit Shown on TS Figure 3.1.1-1 ML20101D8211996-03-15015 March 1996 Suppl to LAR Re Sleeving Option for SG Tube Repair.Proposes Rev to TS Wording in Attachments (A-3) & (A-4) by Removing Generic Ref to Technical Repts & Replace W/Ref to Specfic Approved Repts ML20096D4291996-01-16016 January 1996 Application for Amends to Licenses DPR-53 & DPR-69,adopting Option B of 10CFR50,App J to Require Type a Containment Lrt to Be Performed on performance-based Testing Schedule ML20095K2701995-12-21021 December 1995 Application for Amends to Licenses DPR-53 & DPR-59, Requesting Temporary Exemption & TS Change to Allow Placement of Four Lead Test Fuel Assemblies in Unit 1 Reactor Core During Cycles 13,14 & 15 ML20095C7421995-12-0707 December 1995 Application for Amends to Licenses DPR-53 & DPR-69 to Add Analysis Technique to List of Approved Core Operating Limits Analytical Methods in TS for Plant ML20094S1481995-11-30030 November 1995 Application for Amends to Licenses DPR-53 & DPR-59,allowing Installation of Tube Sleeves as Alternative to Plugging to Repair Defective SG Tubes ML20094D6131995-11-0101 November 1995 Application for Amends to Licenses DPR-53 & DPR-69,upgrading ESF Electrical Sys at Plant to Provide Addl Protection from Loss of Electrical Power ML20093M4141995-10-20020 October 1995 Application for Amend to License DPR-53,extending 18-month Surveillances to 960331 ML20098C0661995-10-0202 October 1995 Application for Amend to License DPR-69,requesting Extension of Unit 2 TS Action Statements 3.7.6.1.a & B from 7 Days to 30 Days for Loss of Emergency Power to Support 1996 Refueling Outage ML20086N2341995-07-13013 July 1995 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 5.2.1 to Allow Use of Lead Fuel Assemblies & Requests Temporary Exemption from Requirements of 10CFR50.46, 10CFR50.44 & 10CFR50,App K for Ccnpp Unit 1 ML20085D4901995-06-0909 June 1995 Application for Amends to Licenses DPR-53 & DPR-69, Implementing Changes to Radiological Effluent TS Per GL 89-01 ML20084R0111995-06-0606 June 1995 Application for Amends to Licenses DPR-53 & DPR-69.Amends Would Revise TSs to Extend Certain 18-month Frequency Surveillances to Refueling Interval ML20084P9681995-06-0202 June 1995 Application for Amends to Licenses DPR-53 & DPR-69,proposing TS Re Pressurizer Safety Valves Lift Tolerance ML20087H9141995-04-28028 April 1995 Application for Emergency Amend to License DPR-53.Amend Would Revise CREVS TSs to Provide an Extension of Allowed Outage Time ML20081D0411995-03-15015 March 1995 Application for Amends to Licenses DPR-53 & DPR-69 to Reformat Current Administrative Controls Section & Relocate Several Requirements to Other Documents & Programs ML20079A5771995-02-24024 February 1995 Application for Amend to License DPR-69,allowing Extension of Interval Between First & Second Type a Test During Second Service Period & Extension of Second Service Period to 12 Years to Coincide w/1999 Plant Inservice Insp ML20078G8161995-01-31031 January 1995 Application for Amends to Licenses DPR-53 & DPR-69,revising TS to Increase Min Amount of Trisodium Phosphate Dodecahydrate Verified in TS Surveillance ML20073G2401994-09-23023 September 1994 Application for Amends to Licenses DPR-53 & DPR-69,allowing one-time Extension from 7 to 14 Days of AOT for Dedicated Class 1E Emergency Power Source During 1995 Refueling Outage ML20071P4421994-08-0404 August 1994 Application for Amend to License DPR-53 & DPR-69,eliminating TS 3/4.3.3.3 for Seismic Monitoring Instrumentation, Relocating Requirements for Operation & Testing of Seismic Monitoring Instrumentation to Plant Updated FSAR ML20149E8321994-08-0202 August 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising Surveillances Associated W/Edgs to Add High Crankcase Pressure to EDG Trips Which Are Verified to Be Automatically Bypassed on Safety Injection Actuation Signal ML20071N2961994-08-0202 August 1994 Application for Amends to Licenses DPR-53 & DPR-69, Incorporating TS 3.9.1, Refueling Operations,Boron Concentration ML20069H6471994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.6.2.2.d,extending Surveillance Interval from 18 to 24 Months ML20069H6191994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.8.1.1.1.b,extending Alternate Offsite Power Circuit Surveillance Frequency from 18 to 24 Months ML20069H6311994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.7.1.2.c,extending Interval for Three Auxiliary Feedwater Surveillance Requirements from 18 to 24 Months ML20069C3921994-05-27027 May 1994 Application for Amend to License DPR-69,revising Heatup & Cooldown Curves & LTOP Controls for Unit 2 to Support Mods to LTOP Sys Scheduled for Spring 1995 Refueling Outage ML20069C2801994-05-27027 May 1994 Application for Amends to Licenses DPR-53 & DPR-69, Revising TS Surveillance Test Interval from Monthly to Quarterly for Several Channel Functional Tests for RPS & ESFAS ML20058K2831993-12-0808 December 1993 Application for Amends to Licenses DPR-53 & DPR-69,revising TS Associated W/Content of Design Features ML20059L4051993-11-11011 November 1993 Application for Amends to Licenses DPR-53 & DPR-69,revising TSs by Relocating Tables of Response Time Limits for Reactor Protection Sys & ESFAS Instruments from TSs to Updated FSAR 1999-09-01
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20211J9861999-09-0101 September 1999 Application for Amends to Licenses DPR-53 & DPR-69,changing Definition of Azimuthal Power Tilt in TS 1.1,correcting Peak Linear Heat Rate Safety Limit in TS 2.1.1.2 & Correcting Dc Voltage Range Listed in Surveillance Requirement 3.3.6.2 ML20211G7591999-08-27027 August 1999 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 3.7.13 to Allow Placement of One or More Fuel Assemblies on SFP Rack Spacers to Support Fuel Reconstruction Activities During Continuing Fuel Assembly Movement ML20196E2101998-11-30030 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,allowing Repair of Defective SG Tubes with leak-limiting Alloy 800 sleeves.Non-proprietary Rev 03-P to CEN-633-NP & Proprietary Rev 03-P to CEN-633-P,encl.Proprietary Info Withheld ML20195K3711998-11-20020 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,removing TS Originally Developed from Reg Guide 1.35 & Implementing Requirements of 1992 Edition Through 1992 Addenda of ASME B&PV Code Section Xi,Subsections IWE & Iwl,Per 10CFR50.55a ML20196A6001998-11-20020 November 1998 Application for Amends to Licenses DPR-53 & DPR-69, Requesting Indirect Transfer of Control,Pursuant to 10CFR72.50,of Matls License SNM-2505 for Plant ISFSI ML20195J7131998-11-19019 November 1998 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 3.7.6, SWS, by Adding One SWS Heat Exchanger Inoperable as New Condition for LCO 3.7.6 ML20154N1861998-10-16016 October 1998 Application for Amends to Licenses DPR-53 & DPR-69 to Incorporate Revised TS 3.3.1 & 3.3.2 to Clarify Inconsistency Between TS Wording & Design Bases as Described in TS Bases & UFSAR ML20236S1341998-07-20020 July 1998 Application for Amend to License DPR-59,implementing Mod That Involves Replacing SW Heat Exchangers W/New Plate & Frame Heat Exchangers Having Increased Thermal Performance Capability ML20236S5591998-07-20020 July 1998 Application for Amend to Licenses DPR-53 & DPR-69,providing Alternate Cooling Water Supply to Maintain EDGs Operability During 1999 Refueling Outage ML20198K9591998-01-12012 January 1998 Rev 11 to 961204 Application for Amends to Licenses DPR-53 & DPR-69,converting to Improved Sts,Per NUREG-1432 ML20217K6591997-10-22022 October 1997 Application for Amends to Licenses DPR-53 & DPR-69, Incorporating Both Steady State & Transient Degraded Voltage Setpoints Into Tss,As Opposed to Current Single Degraded Voltage Setpoint ML20211J2691997-10-0202 October 1997 Application for Amend to License DPR-53,revising TS to Reflect New Electrical Capacity for 1B Edg.Significant Hazards Considerations Associated W/Change Have Been Evaluated ML20141F9181997-05-16016 May 1997 Application for Amend to License DPR-53,implementing Mod Involves Replacing Service Water Heat Exchangers W/New Plate & Frame Heat Exchangers Having Increased Thermal Performance Capability ML20136A9751997-03-0606 March 1997 Application for Amend to License DPR-69,allowing Mod to Unit 2 SW Sys Which Constitutes Unreviewed Safety Question in 10CFR50.59 ML20134D2871997-01-31031 January 1997 Application for Amends to Licenses DPR-53 & DPR-69,changing to Support Larger Number of Plugged SG Tubes for Future Operating Cycles ML20149M0801996-12-0404 December 1996 Application for Amends to Licenses DPR-53 & DPR-69,revising TSs to Be Generally Consistent w/NUREG-1432,Rev 1,thus Replacing 2 Current Sets of TSs W/Single Set Applicable to Both Units ML20135A5171996-11-26026 November 1996 Application for Amends to Licenses DPR-53 & DPR-69,adopting Option B of 10CFR50,App J,To Require Types B & C Containment Leakage Rate Testing to Be Performed on performance-based Testing Schedule ML20128H5971996-10-0303 October 1996 Application for Amend to License DPR-53,changing Provisions for Receiving,Possessing & Using Byproduct,Source & Special Nuclear Matl at Plant ML20117L7801996-09-10010 September 1996 Application for Amends to Licenses DPR-53 & DPR-69 Requesting Extension of ESFAS Automatic Actuation Logic Surveillance from Monthly to Quarterly ML20116F8231996-08-0101 August 1996 Application for Amends to Licenses DPR-53 & DPR-69,allowing Use of Blind Flanges During Modes 1-4 in Plant Containment Purge Sys ML20116E3571996-07-26026 July 1996 Application for Amends to Licenses DPR-53 & DPR-69,to Repair Defective SG Tubes by Electrosleeving ML20117J1911996-05-28028 May 1996 Application for Amend to License DPR-53 & DPR-69,requesting Exigent Amends to Allow Installation of Proposed Modification of Unit 1 & 2 Service Water (SRW) Systems ML20101K5911996-03-28028 March 1996 Application for Amends to Licenses DPR-53 & DPR-69, Requesting to Reduce Moderator Temp Coefficient Limit Shown on TS Figure 3.1.1-1 ML20101D8211996-03-15015 March 1996 Suppl to LAR Re Sleeving Option for SG Tube Repair.Proposes Rev to TS Wording in Attachments (A-3) & (A-4) by Removing Generic Ref to Technical Repts & Replace W/Ref to Specfic Approved Repts ML20096D4291996-01-16016 January 1996 Application for Amends to Licenses DPR-53 & DPR-69,adopting Option B of 10CFR50,App J to Require Type a Containment Lrt to Be Performed on performance-based Testing Schedule ML20095K2701995-12-21021 December 1995 Application for Amends to Licenses DPR-53 & DPR-59, Requesting Temporary Exemption & TS Change to Allow Placement of Four Lead Test Fuel Assemblies in Unit 1 Reactor Core During Cycles 13,14 & 15 ML20095C7421995-12-0707 December 1995 Application for Amends to Licenses DPR-53 & DPR-69 to Add Analysis Technique to List of Approved Core Operating Limits Analytical Methods in TS for Plant ML20094S1481995-11-30030 November 1995 Application for Amends to Licenses DPR-53 & DPR-59,allowing Installation of Tube Sleeves as Alternative to Plugging to Repair Defective SG Tubes ML20094D6131995-11-0101 November 1995 Application for Amends to Licenses DPR-53 & DPR-69,upgrading ESF Electrical Sys at Plant to Provide Addl Protection from Loss of Electrical Power ML20093M4141995-10-20020 October 1995 Application for Amend to License DPR-53,extending 18-month Surveillances to 960331 ML20098C0661995-10-0202 October 1995 Application for Amend to License DPR-69,requesting Extension of Unit 2 TS Action Statements 3.7.6.1.a & B from 7 Days to 30 Days for Loss of Emergency Power to Support 1996 Refueling Outage ML20086N2341995-07-13013 July 1995 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 5.2.1 to Allow Use of Lead Fuel Assemblies & Requests Temporary Exemption from Requirements of 10CFR50.46, 10CFR50.44 & 10CFR50,App K for Ccnpp Unit 1 ML20085D4901995-06-0909 June 1995 Application for Amends to Licenses DPR-53 & DPR-69, Implementing Changes to Radiological Effluent TS Per GL 89-01 ML20084R0111995-06-0606 June 1995 Application for Amends to Licenses DPR-53 & DPR-69.Amends Would Revise TSs to Extend Certain 18-month Frequency Surveillances to Refueling Interval ML20084P9681995-06-0202 June 1995 Application for Amends to Licenses DPR-53 & DPR-69,proposing TS Re Pressurizer Safety Valves Lift Tolerance ML20087H9141995-04-28028 April 1995 Application for Emergency Amend to License DPR-53.Amend Would Revise CREVS TSs to Provide an Extension of Allowed Outage Time ML20081D0411995-03-15015 March 1995 Application for Amends to Licenses DPR-53 & DPR-69 to Reformat Current Administrative Controls Section & Relocate Several Requirements to Other Documents & Programs ML20079A5771995-02-24024 February 1995 Application for Amend to License DPR-69,allowing Extension of Interval Between First & Second Type a Test During Second Service Period & Extension of Second Service Period to 12 Years to Coincide w/1999 Plant Inservice Insp ML20078G8161995-01-31031 January 1995 Application for Amends to Licenses DPR-53 & DPR-69,revising TS to Increase Min Amount of Trisodium Phosphate Dodecahydrate Verified in TS Surveillance ML20073G2401994-09-23023 September 1994 Application for Amends to Licenses DPR-53 & DPR-69,allowing one-time Extension from 7 to 14 Days of AOT for Dedicated Class 1E Emergency Power Source During 1995 Refueling Outage ML20071P4421994-08-0404 August 1994 Application for Amend to License DPR-53 & DPR-69,eliminating TS 3/4.3.3.3 for Seismic Monitoring Instrumentation, Relocating Requirements for Operation & Testing of Seismic Monitoring Instrumentation to Plant Updated FSAR ML20149E8321994-08-0202 August 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising Surveillances Associated W/Edgs to Add High Crankcase Pressure to EDG Trips Which Are Verified to Be Automatically Bypassed on Safety Injection Actuation Signal ML20071N2961994-08-0202 August 1994 Application for Amends to Licenses DPR-53 & DPR-69, Incorporating TS 3.9.1, Refueling Operations,Boron Concentration ML20069H6471994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.6.2.2.d,extending Surveillance Interval from 18 to 24 Months ML20069H6191994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.8.1.1.1.b,extending Alternate Offsite Power Circuit Surveillance Frequency from 18 to 24 Months ML20069H6311994-06-0808 June 1994 Application for Amends to Licenses DPR-53 & DPR-69,revising TS 4.7.1.2.c,extending Interval for Three Auxiliary Feedwater Surveillance Requirements from 18 to 24 Months ML20069C3921994-05-27027 May 1994 Application for Amend to License DPR-69,revising Heatup & Cooldown Curves & LTOP Controls for Unit 2 to Support Mods to LTOP Sys Scheduled for Spring 1995 Refueling Outage ML20069C2801994-05-27027 May 1994 Application for Amends to Licenses DPR-53 & DPR-69, Revising TS Surveillance Test Interval from Monthly to Quarterly for Several Channel Functional Tests for RPS & ESFAS ML20058K2831993-12-0808 December 1993 Application for Amends to Licenses DPR-53 & DPR-69,revising TS Associated W/Content of Design Features ML20059L4051993-11-11011 November 1993 Application for Amends to Licenses DPR-53 & DPR-69,revising TSs by Relocating Tables of Response Time Limits for Reactor Protection Sys & ESFAS Instruments from TSs to Updated FSAR 1999-09-01
[Table view] |
Text
- _ - _ _ _ _ _ _ _ _ _ - _ _ - _ - - - _ _ _ _ _ - _ _ _ _ _ _ . _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ - - _ - _ _ _ - - _ _ _ _ _ _ _
j ,
b f5AL. TIM ORC OASAND i ..
l- ELECTRIC CHARLES CENTER e P.O. BOX 1475
OtoRot C. Cntro vice raoies ,
OhtARtethOY o o n.o .."
April 30,1991 U.S. Nuclear Regulaiory Commission Washington,DC 20555
[ NITENTION: Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2: Docket Nos. 50-317 & 50-318 Rec luest for License Amendment; One time Schedular Extension of a Periodic Report Centlemen:
Baltimore Oas & Electric Company hereby recuests-an Amendment to its Operating License Nos.DPR 53 and DPR 69 for Calvert Cliffs Un ts 1 & 2, respectively, with the submittal of the following proposed change to the Technical Speci5 cations.
HACKGROUNI)/I)ESCRIPTION OF CilANGE Technical Specification 6.9.1.8. addresses a semiannual radioactive effluent release report. This report is due within 60 days after January 1 and July 1 of each year, except that for Strontium 89 and !
Strontium 90, analyses results may be submitted m a supplementary report within 120 days after January 1 and July 1 of each year, The first Strontium report for 1991 is duc April 30,1991.- Due to a delay in transporting the samples off site to the analysis lab, the report cannot be submitted on time. Therefore, a one time schedular extension for 60 days for the first Strontium report for 1991 is requested, such that the report would be due June 29,1991.
JUSTIFICATION The semiannual radioactive effluent release report of Technical Specification 6.9.1.8 covers liquid effluents and gaseous effluents. The radioisotopes involved include fission product isotopes and corrosion proc uct isotopes. The samples measured give an after.the fact confirmation that the releases that ' occurred during the timeframe covered were within limits. Strontium 89 and -
Strontium 90 are two of those fission product isotopes.
L I
9105070206 910430 d Ad ( i
'PDR- ADOCK 05000317-P PDP
Document Control Desk Apdl 30,1991 Page 2 The reasons for the existing allowance in Technical Specification 6.9.1.8 for an additional 60 days to submit a supplemental report containing the Strontium 89 and Strontium 90 analyses results is that these analyses take much more time to complete than those for other isotopes, and these analyses are best performed off site. The 60 day extension is normally necessay to ensure that high quality analyses and results are obtained.
s
!!istorical results for Strontium 89 and Strontium 90 have been very low, with airborne results often less than the minimum detectable activity. The power history for the two units during the timeframe covered was low. The results for the other isotopes were low. Therefore, strontium results from the operating period in question are also expected to be low.
Consequently, an extension of the duc date for the strontium results report from April 30 to June 29,1991 will not have adverse affects on safety.
Efforts are in progress to determine the reasons for the delay in transporting the samples off site and any necessary actions to prevent recurrence, itEOUESTEI) CII ANGE
, Change page 6-17 of the Unit 1 and Unit 2 Technical Specifications, as shown on the marked up copics of those pages, attached to this letter.
I)lTI'EinflNATION OF SIGNIFICANT llA7.Alti)S This proposed change has been evaluated against the standards in 10 Cim 50.92 and has been deterrmned to involve no significant hazards considerations, in that operation of the facility in accordance with the proposed amendment would not:
(i) irnolve a significant increase in the probability or consequences of an accident previously evaluated.
Strontium releases are not in any way related to initiators, and therefore probabilities, of previously analyzed accidents. As far as the consequences of previously analyzed accidents, data concerning the releases of strontium would be an indication of their
- x)tential consequences but not a contributor to any increase in consequences. These strontium analyses are performed to confirm that the results of releases are within limits.
Based on the low results of other isotopes for the operating period, the strontium levels should also be low, Therefore,the proposed 60-day extension of the submittal due date for the strontium data required by Technical Specification 6.9.1.8 would net involve a significant increase in the probability or consequences of an accident previously evaluated.
(ii) create the possibility of a new or different type of accidentfrom any accident previously evaluated.
The proposed 60 day extension of the submittal duc date for the strontium data will not physically change the plant or the way in which the plant is operated. Therefore,
_ ___ __ ___ _ . _ _ _ _ _ _ _ ~ . _ _ _ - _ .
Document Control Desk April 30,1991 Page 3 the proposed change would not create the possibility of a new or different type of accident from any accident previously evaluated.
(iii) involve a significant reduction in a margin of safety.
The margin of safety in the arca of radioactive ef0uents is primarily achieved through the limits placed on the quantitics and activity levels of efnuent releases prior to release. Tne strontium analyses in question are an after the. fact verincation that no abnormallevels of activity exist.
- Therefore, the proposed 60-day extension of the submittal duc date for the strontium data would not involve a signiGennt reduction in a margin of safety.
SCIIEDULE This amendment is requested to be processed as soon as practicable.
SAFL'IY COMM['ITEE REVIEW These proposed changes to the Technical Speci0 cations and our determination of significant hazards have been reviewed by our Plant Operations and Off Site Safety Review Committees, nnd they have concluded that implementation of these changes will not result in an undue risk to the health and safety of the public.
Very t.uly ' rs, /
)
STATE OF MARYLAND &
I _ TO WIT COUNTY OF CALVERT I I hereby certify that on the dC N da of . 1 efore e, the subscriber, a Notary Public of the State of hfaryland rin.and for __('old .
personally appeared George C. Creel, being duly sworn, and iiates that he:is VM617 resident of the Baltimore Gas and Electric Company, a corporation of the State of Maryland; that he provides the foregoing information for the purposes therein set forth; that the statements rnade are true and correct to the best of his knowledge, information, and belief; and that he was authorized to provide -
the information on behalf of said Corporation.
WITNESS mylland and NotarialScal:- /- .
My Commission Expires: nsno r, / kf6 l W Da'tb GCC/DLS/ dis / dim Attachment c%y ~ 5 ve, -,-e-- w .- ww v e-tv-,_= a e e m g w-- na emm,w-=*a=ewn+srup vme ** r e e & w- -==='r-T-' -+e< = ' + - * ' ' * *~***~""+*'r"-** * * ' " " " * * * ' * * - * ~ " " * - * - * ' * " * ' " - - - " ' ' ' ' ' " " - ' ' ' " ' "
1 i
Document Control Desk i April 30,1991 l Page 4 cc: D. A.13 rune, Esquire J.11 Silberg, Esquire R. A. Capra, NRC D. O. McDonaki, Jr., NRC T. T. Martin, NRC L E. Nicholson, NRC R. I. McLean, DNR J.11. Water, PSC P
w,, ...n,- ew , , e s.,, ,,,.,-,r, . ., - e .
,-wn,,---,-r-mn -- -- - - - ,r- -+ s. m-