C:mmtnw:alth Edison I
1 -
1400 Opus Place (vJ Downers Grove, Illinois 60515 v
April 26,1991 Dr. Thomas E. Murley, Director Office Of Nuclear Reactor Regulation U.S. Nuclear Regulato Commission Washington, DC 2055 Attn: Document Control Desk
Subject:
Byron Station Units 1 and 2 Braldwood Station Units 1 and 2 Containment Leak Chase Channels TAC Nos. 73569,' 73570,66476,66477 tiBO_Rochedos.50 45 /455.and 50 450l457 4
Reference:
(a) May 17,1990, S P. Sands letter to T.J. Kovach
Dear Dr. Murley:
Reference (a) provided the Safety Evaluation performed by the NRC concerning the conduct of containment integrated leak rate testing (CILRT).
The NRC staff found CECO's proposal reasonable and acceptable; however, requested that CECO commit to comply with 10 CFR 50, Appendix J, including a visual inspection of the accessible surfaces, venting plugs, accessible leak chase channels and dome area prior to each Type A CILRT.
Commonwealth Edison commits to the Inspection requ!rements specified in the Safety Evaluation. Both Byron and Braidwood stations have included these requirements into their visuallnspection of containment surfaces which are done prior to a type A leak test.
Please address any questions you may have concerning this matter to this office.
Very truly yours, Yht k'
'M -
Alien R. Checca Nuclear Licensing Administrator I