Text
-
- CCN 91-14062 noy -
PIIILADELPIIIA ELECTitlC COMi%NY
$kk PEACll dol'10M K!UMIC POWER STArlON
'/
R. D.1, Ika 208
. n 'tjf.M '
Delta, lYnn91vanu 17314 rexw mornw-run con ta or tu aittw a (717) 4 W7014 D. B. Miller, Jr.
Vice Preudent May 2, 1991 10 CFR 2.201 Docket Hos. 50-277 50-278 U. S. Nuclear Regulatory Comission ATTN:
Document Control Desk Washington, DC 20555
SUBJECT:
Peach Bottom Atomic Power Station - Units 2 & 3 Response to Notice of Violation Combined Inspection Report Nos. 50-277/91-12; 50-278/91-12
Dear Sir,
in response to your letter dated 4/9/91 which transmitted the subject Inspection Report and Notice of Violation, we submit the attached response.
The Inspection Report concerned our Radiological Effluent Control Program.
If you have any questions or require additional information, please do not hesitate to contact us.
Sincerely, p
Attachment cc:
R. A. Burricelli, Public Service Electric & Gas T. H. Gerusky, Comonwealth of Pennsylvania J. J. Lyash, USNRC Senior Resident inspector T. T. Martin, Administrator, Region I, USNRC H. C. Schwem, Atlantic Electric R. I. McLean, State of Maryland J. Urban, Delmarva Power 91050701os 910502 PDR ADOCK 0500 7
gp /
Ilo
s 9
Document Control nesk Page 2 bcc: J. W. Austin A4-4N, Peach Bottom J. A. Basilio 52A-5, Chesterbrook G. J. Beck 52A-5, Chesterbrook J. A. Bernstein 51A-13, Chesterbrook R. N. Charles 51A-1, Chesterbrook Commitment Coordinator 52A-5, Chesterbrook Correspondence Control Program 618-3, Chesterbrook J. 8. Cotton 53A-1, Chesterbrook G. V. Cranston 638-5, Chesterbrook E. J. Cullen S23-1, Main Office A. D. Dycus A3-IS, Peach Bottom J. F. Franz A4-15, Peach Bottom A. A. Fulvio A4-IS, Peach Bottom D. R. Helwig SIA-ll, Chesterbrook R. J. Lees NRB 53A-1, Chesterbrook C. J. McDermott 513-1, Main Office
- 0. B. Miller, Jr.
SM0-1, Peach Bottom PB Nuclear Records A4-25, Peach Bottom J. M. Pratt B-2-5, Peach Bottom J. T. Robb 51A-13 Chesterbrook D. M. Smith 52C-7, Chesterbrook
j Document Control Desk Page 3 Restatement of the Violation Section 6.8.1 of the Technical Specification requires establishing and implementing written procedures and administrative policies that meet the requirements of Sections 5.1 and 5.3 of ANSI N18.7-1972 and Appendix "A" of Regulatory Guide 1.33 (1972).
Contrary to the above, the electronic calibrations of the liquid radwaste effluents radiation monitor performed prior to and on May 5, 1989, were performed without a written and approved procedure.
Cause of the Violation The electronic calibrations of the liquid radwaste effluent radiation monitor (LRERM) were performed prior to and on May 5, 1989 without the use of an approved controlled procedure as a result of not having a procedure available.
I A surveillance test existed to perform the radioactive source calibrition l
required by Technical Specifications (Tech Specs).
The survelliance test is performed by chemistry personnel, if this test fails, as was the case in the May 5, 1989 event, a maintenance request is generated and Instrumentation and l
Control (l&C) personnel perform an electronic calibration. On May 5, 1989, the electronic calibration was performed in accordance with the controlled vendor manual rather than an approved controlled procedure.
Corrective Steps Taken and Results Achieved An I&C controlled procedure was approved on 1/23/90.
This procedure covers the electronic calibration of the LRERM.
Similar Tec' Spec instrumentation was reviewed to determine if controlled and approved calibration procedures existed. This resulted in the generation of a controlled procedure for the calibration of the Main Stack Noble Gas Monitor on 2/26/91.
Corrective Steps Which Will Be Taken To Avoid further Violations l
In addition to the corrective actions identified above, an I&C surveillance l
procedure was generated for the tRERM.
This procedure requires that a yearly electronic calibration of the LRERM be performed regardless of the results of the yearly radioactive source calibration surveillance.
This procedure was l
approved by the Plant Operations Review Committee on 4/23/91.
I Date When Full Compliance Will Be Achieved Full compliance will be achieved upon the next performance of the electronic calibration of the LRERM which is scheduled to be completed by 6/30/91.
This l
calibration will utilize the new surveillance procedure and the I&C procedure l
as required.
,