ML20073G276

From kanterella
Jump to navigation Jump to search
Informs That Submittal of Draft Offsite Dose Calculation Manual Delayed Until 830606
ML20073G276
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 04/12/1983
From: Sinclair J
VERMONT YANKEE NUCLEAR POWER CORP.
To: Vassallo D
Office of Nuclear Reactor Regulation
References
FVY-83-27, NUDOCS 8304180232
Download: ML20073G276 (1)


Text

VERMONT YANKEE NUCLEAR POWER CORPORATION 2.C.2.1 M OU RD 5. Box 169. Ferry Road, Brattleboro, VT 05301

,, yLy,,

ENGINEERING OFFf CE 1671 WORCESTER ROAD F R AMINGHAM. MASSACHUSETTS 01701 April 12, 1983 1,tc,sose.,7.,72 3,oo United States Nuclear Regulatory Commission Washington, D. C. 20555 Attention:

Office of Nuclear Reactor Regulation Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing

References:

(a) License No. DPR-28 (Docket No. 50-271)

(b)

Letter, VYNPC to USNRC, FVY 82-126, dated December 6, 1982 (c) Letter, VYhTC to Franklin Research Center, FVY 83-06, dated January 24, 1983

Subject:

Submittal of Draft Off-Site Dose Calculation Manual (ODCM)

Dear Sir:

In Reference (b), we informed you of our intended schedule for submitting draf ts of our Radiological Ef fluent Technical Specifications (RETS) and Off-Site Dose Calculation Manual (ODCM) to your consultant, Franklin Research Center (FRC). We have forwarded the draf t RETS to FRC via Reference (c);

however, our intended schedule for submitting the ODCM has been delayed. The purpose of this letter is to inform you that we presently expect to submit the draft ODCM to FRC by June 6, 1983.

We trust this schedule is acceptable; however, should you have any questions in this matter, please contact us.

Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION J. B. Sinclair Licensing Engineer JBS/dd Cf CO j

cc: Franklin Research Center Twentieth and Race Streets Philadelphia, PA 19103 Attention:

Dr. S. Pandey 8304180232 030412 PDR ADOCK 05000271 P

pon

. _ _ _.