ML20073C898
| ML20073C898 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 09/15/1994 |
| From: | Tosch K NEW JERSEY, STATE OF |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9409260216 | |
| Download: ML20073C898 (2) | |
Text
e State of New Jersey Department of Environmental Protection Robert C, Shinn, Jr.
Division of Environmental Safety, Health, Commissioner and Analytical Programs Radiation Protection Programs 1
Bureau of Nuclear Engineering i
CN 415 Trenton, New Jersey 08625-0415 Tel (609) 987-2032 Fax (609) 987-6354 September 15, 1994 i
U.S.
Nuclear Regulatory Commission i
Document Control Desk Washington, D.C.
20555 Gentlemen:
Subject:
Hope Creek Generating Station Docket No. 50-354 License Change Request LCR 94-16 Emergency Diesel Generator (EDG) Fuel Oil Surveillance Requirements On July 28, 1994, Public Service Electric and' Gas Company f
submitted the subject license change request to the Nuclear Regulatory Commission.
This request would revise Technical Specification Section-3/4.8.1 "AC Sources."
The revised specification removes the surveillance requirements, methodology and frequency for EDG fuel oil from.the Technical Specification and relocates them in a controlled procedure (VSH.SS-CA.ZZ-0013(Q)).
The New Jersey Department of Environmental Protection's Bureau of Nuclear Engineering reviewed the above amendment in accordance with the requirements of 10CFR50.91(b), and has no comments.
1 i
If you have any questions, please contact suren Singh at (609) 987-2039 or Rich Pinney at (609) 987-2086.
Sincerely, i
fr/
Kent Tosch, Manager
~ !
Bureau of Nuclear Engineering Ul s))
l 940Y260216 940915 i
D I
EDR ADOCK 05000354 Newlew a an W oppo,muyr way cr 1
F PDR WMAPer l
i i
c:
Assistant Director Lipe i
,R6diation Protection P', crams N.J.
DEP Dave Moran Acting NRC Project M3nagctr i
D.
Chawaga NRC Region I State Liaison C.
Marschall Artificial Island Senior Resident Inspector F. Thomson Manager, Licensing and Regulation PSE&G
+
t 1
6 i
.