ML20073C859

From kanterella
Jump to navigation Jump to search
Amend 84 to License DPR-50,revising App a Tech Specs to Require Emergency Plan & Security Plan Audits Every 12 Months
ML20073C859
Person / Time
Site: Crane 
Issue date: 04/04/1983
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Metropolitan Edison Co, Jersey Central Power & Light Co, Pennsylvania Electric Co, GPU Nuclear Corp
Shared Package
ML20073C863 List:
References
DPR-50-A-084 NUDOCS 8304130328
Download: ML20073C859 (5)


Text

.

d'

'o,j UNITED STATES NUCLEAR REGULATORY COMMISSION g

WASHINGTON, D. C. 20655

/

METROPOLITAN EDISON COMPANY i

JERSEY CENTRAL POWER AND LIGHT COMPANY PENNSYLVANIA ELECTRIC COMPANY GPU NUCLEAR CORPORATION DOCKET NO. 50-289 THREE MILE ISLAND NUCLEAR' STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 84 License No. DPR-50 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by GPU Nuclear Corporation, et al.

(the licensees), dated January 31, 1983, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

o 8304130328 830404 gDRADOCK05000

2-2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.c.(2) of Facility Operating License No. DPR-50 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 84 are hereby incorporated in the license.

GPU Nuclear Corporation shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION l

ohn F. Stolz, Chief ()

ating Reactors Branch #4 Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: April 4,1983 s

O

9 ATTACHMENT TO LICENSE AMENDMENT NO. 84 FACILITY OPERATING LICENSE NO. DPR-50 DOCKET NO. 50-289 Replace the following pages of the Appendix "A" Technical Specifications i

with the enclosed pages.

The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.

Remove Insert f.

6-7 6-7 6-11 6-11 e

Y 0

9 e.*

4

e i

istit etsif. This ripart thall 1&clude analysia of the Eff3 cts of the occurrence and recommendatione concerning operettom of the f.

Any other matters involving safe operation of the nuclear power unit and prevention of recurrence. This report shall be sub-plant which a reviewer deems appropriate for consideration, or mitted to the Operations and Maintenance Director and the Tice which te referred to the Sadependent reviewers.

President TMI-1.

Appropriate analysis of reports will be sub-mitted to the Nuclear Regulatory Commission sa accordance with 6.L 2.6 MNTWS Technical Specification 6.9.2. A.

3 The inde' pendent reviewer (s) shall either have a Bachelor's Degree in 6.8 FR N RTS h

Engineering or the Physical Sciences and five (5) years of professional g

level experience in the area being reviewed or have 9 years of appro-6.8.1 Written procedures important to safety shall be established implemented

{

ptfore experience la the field of his -speciality. An individual and asintained covering the items referenced below performing reviews any possess competence in more than one specialty 3;

The app 11' cable procedures recomended la Appecdia "A" of area. Credit toward experience will be 31,en for advanced degrees a.

on a one-for-one basta up to a maximian of two years.

Regulatory Guide 1.33. Reviaise 2. February 1978.

l RECORDS b.

Surveillance and test activities of equipment important to safety and radioactive waste managensat af equipment.

6.5.2.7 Reports of reviews encompassed 1a section 6.S.2.5 shall be prepared.

maintained and trancattted to the cognisant division Vice President.

c.

Safueling Operations.

A.S.3 A N TS d.

security Plan Implementation.

6.5.3.1 Audits of unit activittee shall be perfonaed by the Quality Assurance e.

Fire Protection Program implementation.

Department in accordance with the TM1-1 Operational Quality Assurance Flen. These audits shall encompases f.

Emergency Plan Implementation.

j T'e conformance of unit operations to provisions contained 3 Process Control Program implementattee.

a.

within the Technical Specificatione and'e'p'piicable license conditions at least esce per 12 anatSa."

h.

Offsite Dose Calculation raaval Impismentation.

b.

The perforgance, training and qualifications of the entire 1.

Quality Assurance Frogram for effluent and environmental imitt staff at least once per 12 months.

monitoring using the guidance in Regulatory Guida 4.15.

The verificatica of the non-conformances and corrective J.

Plant Staff Overtime. to limit the amust worked by staf f c.

actions program to be properly implemented and documented performing eefety-related functions la accordance with NRC as related to actice taken to correct deficiencies occurring Policy Statement on working hours (Generis Letter No. 82-12).

in antit equipment, structures, systems or methods of operation that af fect nuclear safety at least once per 6 months.

6;8.2 Further," each procedure required by 6.8.1 above. and changes thereto

~

which are important to safety, shall be reviewed and approved as

[

d.

The performance of activities reqaired by the Operational described in 6.5.1 priot to implementation and shall be reviewed Quality Assurance Flan 'to aset the criteria of Appendiz *B".

periodically as set forth to administrative precedures.

10 CFR S0, at least once per 24 months.

6.8.3 Temporary changes to procedures of 6.8.1 above any be made provided:

L The laergency Plan and Implementing procedures at least once l

e.

The intent of the original proced'ure is not altered; per 12 months.

a.

f.

The Security Plan and implementing procedures at least once l

I b.

The change is approved by two memb6re of CFUNC Nenagement per 12 aseths.

Staff authorised under Section 6.5.1.12 and knowledgeable in the aree affected by the prncedure. For changes which The Fire Protection Program and implementing procedures og may affect the operational statue of unit systems er equip-3 meat, at least one of these individuels shall be a member of least once per 24 months.

unit manageriet or supervisten holding a sester asector The Offsite Dose Calculation Manual and implementing proce.

o,erator. uc.n en the.

it.

h.

The change is,doceented, reviewed and approved te described c.

6.y la 6.S.1.1 withio 14 days of implementation.

Amendment Ne. If, 11, 84 Amendment No. II, 32, 72, 77, 34 6-11

_ _ -