Enclosure to Sarial 22169 QUARTERLY REPORT April 1983 through June 1983

'1. Continue installation of Non-Q Mechanical, Electrical, and Civil work items throughout the plant.

2. Subcontractor, B & W, to continue installation of the NSSS system in both units.
3. Subcontractor, Zack, to continue installation of HVAC in all facilities.
4. Continue underpinning activities for the Auxiliary, Service Water, and Circulating Water Buildings under direction of the Field Soils Organization.

8304120606 030331 PDR ADDCK 05000329 R pm i

l OC0483-0007A-MP01

r

.[

ALAB REStME ORGANIZATION LAST NME FIRST NAME DATE EFPLOYEE h'NBER MPQAD Bachman Eric 2/22/83 CPCo-BTI-398 SCHOOL NAME CITY STATE MAJOR DATES DEG HIGH Shawnee High School Springfield, Ohio 1970 19 197b A.S.

University of Cincinnati Cincinnati, Ohio Electrical COME Engineering E.E.

1981 University of Cincinnati Cincinnati, Ohio (27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> left for 1981 OTHER B.S. degree)

Electrical Eng. 1983

- 1I MmTHAEAR COFANY/ ADDRESS YOUR TITLE DUTIES FRm TO Butler Services for Quality Prepare inspectio.n plans & procedures; Feb Consumers Power Assurance Review NCRs, CARS, etc. for IDCFR 50 55.

21 3500 E. Miller Rd. Engineer (e) and Part 21 reportability; review 1983 Midland, Michigan 48640 ,

procurement documents; assist in over-inspection.

1/78 2/83 Kaiser Engineers Quality Prepare inspection plans & procedures; Box 201 -

Engineer- Review NCRs, CARS for correctness &

Moscolo, Ohio h5153 reportability; train personnel; perform surveillances; respond to IEC inspection reports, NCRs, CARS, audits, RFIs, etc.

1/76 1/78 McGraw Construction Co. Engineer / Perform engineering & design for 31 Canal Street Draftsman electrical systems in heavy construc-Middletown, Ohio tion.

l t ,

~

1

'~

1 ALG RES'JE

! ES;: :::. tim LAST IW E FIRST fW E DAi:; :9

. Loy.E trrd a BARGER, DAVID

  • ft MPQAD QC 3/7/83 CPCo-BS-618 l SC-iOOL TWE l CITY STATE f%)0R l DATES DEGl-Columbia High Richland, Washington . Grad. N HIGH 1972 Q

Columbia Basin Pasco, Washington QA/QC 1980 MOE 1982 None Tradt National Camera Englewood, Colorado Photography 1977 Yes OTHER Repair 1978 OTHER t

MCr

s . <

. . - . ALAB REST.NE P

a CRGA'lIZATIQ1 m PG A O LAST NAVE FIRST NAME DATE EFPLOYEE N FcER COMMONWEALTH CARPENTER GREGORY 1/7/83 :PCo-GC-555 SCHOOL l NAME CITY STATE f%)0R ' DATES DEG m -

HIGH 9Io61 Randolph Union Hiqh Randolph, Vermont 6/65 cm ko COLLEGE Vermont Tech. College Randolph Ctr. , VT. Civil Technology 6/73 A.A.S 6(33 TRI State Univ. Angola, Ind. Civil Engineering 3/75 B.S.

Civil Engineering o M.S.

Univ. of Missouri Rolla Rolla, MO (Geotechnical) 12/82 Ph.D MCNTH/ YEAR CONPANY/ ADDRESS YOUR TITl2 DUTIES 2R04 TO 8/75 12/82 Rolla Geotechnical Con- Inspection & Testing Related To sultants, Inc. P.O. Box Geotechnical Projects 703 Rolla, MO. 65401 I

^

Part Time Employment

  • 12/69 6/71 Pratt & Whitney Aircraft Detail draftsman of aircraft engine North Haven, Connecticut and rocket parts.

I 7/68 11/69 U.S. Army Served with the 25th Infantry Division l in Viet Nam, obtained the rank of sergant after 8 months of duty,creceived a purple heart, bronze star and combat fEbrn"hkY f b!k$6nOs# s hsS51gg gsgebhEm.

12/67 3/68 Pratt,& Whitney Aircraft Detail draftsman of aircraft engine Middletown, Connecticut and rocket parts.

L- '~ -" 'r:.L.---.

..  : ~ ,. . _ . . ..~---._-_-~~~_:'-~

- - - - - - -~

-. - h .

. .r*e g Jos HISTORY INONTH/ YEAR l cod?ANY/ ADDRESS YOUR TITLE DUTIES

  • IFR04 TO I I I I l- l i
i l

e4 4

A 1

9 0

  • m

, - , - . -en-, - , - - , , ,--,...-.c., .n,-- ,,-. , ---__,-,n., , ---- - - --,.. _ _---- . . --__---- - - - . _

( l ALAB RESUME CRGANIZATION LAST NAME FIRST NAME DATE EM3LOYEE TUGER MPQAD/QC Chany Drew 1/10/83 CPCo-GC-186 SCHOOL NAME CIT ( STATE MAJOR DATES' DEG Bedf rd Temperance 9/64 HIGH High School Temperance Michigan General Curriculum 9/68 Michigan State East Lansing Civil Engineering 10/68 COLLEGE University Michigan 6/72 B.S.

Michigan State East Lansing UTHER Civil Engineering 5/72 University Michigan 5/73 M.s.

OTHER McnTH/ YEAR COPANY/ ADDRESS YOUR TITLE DUTIES FROM TO 10/82 12/82 Gilbert / Commonwealth Disposition of nonconformance 209 E. Washington Ave. reports for electrical cable

.; Jackson, Michigan 49201 Engineer tray structural supports.

Subcontractor: Common-wealth lord joint venture 6/82 10/82 Gilbert / Commonwealth Verification and design of nuclear 209 E. Washington Ave, Structural category 1 pipe supports.

Jackson, Michigan 49201 Engineer -

s 4/82 6/82 Gilbert / Commonwealth AISC steel desgin fortran program 209 E. Washington Ave. Structural development.

Jackson, Michigan 49201 Engineer

.. 1/82 4/82 Gilbert / Commonwealth Analysis and design for reinforcement 209 E.' Washington Ave. Structural of existing breeching air ducts.

Jackson, Michigan 49201 Engineer ,

I 11/81 1/82 Gilbert / Commonwealth Gilbert / Commonwealth reference fossil 209 E. Washington Ave. Structural plant base mat study.

Jackson, Michigan 49201 Engineer

+ea ew mm Noa e -me e eM w -m + eam wg 4e mp =m- me - 4 -e o ee .*

. e -

5

. 1 i

J0sHISTORY l

C0d?ANY/ ADDRESS YOUR TITLE DUTIES

  • l IFR04 TO I I

i i l l4/79 11/84 Gilbert / Commonwealth Structural Breeching and structural steel layout )

) l 209 E. Washington Ave. Engineer and design. Evaluation of prestress '

1 Jackson, Michigan concrete vendor facilities & evaluation 49201 of thier QA programs.

5/76 4/79 Gilbert / Commonwealth StrucEural Concrete building and foundation 209 E. Washington Ave. Engineer design. Structural steel design.

Jackson, Michigan Wrote elevator specification and 49201 evaluated bids.

'3/76 5/76 Gilbert / Commonwealth Structural Design calculation verification for 209 E. Washington Ave. Engineer fossil fuel power plant.

Jackson , Michigan 49201 12/74 3/76 Gilbert / Commonwealth Structural Design of pile support foundations.

209 E. Washington Ave. Engineer Jackson, Michigan 49201 5/74 1 2 / 74 Gilbert / Commonwealth Structual Preliminary building layouts for 209 E. Washington Ave. Engineer nuclear plant, wrote structural Jackson, Michigan design guides for nuclear plant.

49201 2/74 5/74 Gilbert / Commonwealth Structural Preliminary layout and design of 209 E. Washington Ave. Engineer concrete foundations.

Jackson, Michigan 49201 12/73 2/74 Gilbert / Commonwealth Structural Verification and review of vendors 209 E. Washington Ave. Engineer structural steel design.

Jackson, Michigan 49201 6/73 12/ 73 Gilbert / Commonwealth Strudl and fortran structural 209 E. Washington Ave. Structural programming.

Jackson, Michigan Staff 49201 Engineer 6/71 9/71 Michigan Testing Field Testing Conducting quality control tests Engineers Engineer for various construction materials Toledo, Ohio such as; concrete, asphalt, soil density, aggregate composition and properties.

e eo e e*- e ee, e. e e e = e*= --es=> e an e m. mee o e e e e

_ , - - ~ . -

a ALAB RESUE i CRGA*lIZATICJ LAST NAME FIRST flAFE DAic d?LOYEE fiU EER MPQAD/QC Chen Chung Piawo l { tokO

' SCHOOL tWE CITY STATE MMOR DATES DEG Jun-In High School Shanghai, China 1945 HIGH Chung-Cheng Institute Taiwan, China Civil Engineerin 1956 COLLEGE Transporation & g 1960 B.S.

of Technology Photogram University of Cheng-Kung Taiwan, China Mettalurgical Eng. 1965 gg Materials Science 1966 University of Washington Soil & Constructior 1978 Graduated School.of C.E. Seattle, Washington Structural Concrete 1979 MCr1TH/ YEAR COPANY/ ADDRESS YOUR TITLE DUTIES FRO'. TO 1977 1982 Pacific Testing Lab. Civil Engineer 1) Materials testing (including soils, and Inspector concrete, cement, aggregate, asphalt, steel, grouting, etc.

2 2). Inspection for welding & N.D.E.

to

3) Quality assurance Public Power Supplytesting System. forWNPWashing no.4 &

no.1

4) Engineering design for sub-soil l

i foundations.

m l 71 76 "DESTAC" Construction Co. Structural Design and calculation of reinforced Engineer concrete and prestressed concrete structures.

~

69 71 Taiwan Highway Bureau Civil Highway construction and road pavement.

Engineer

~

l 66 69 Chung-Shan Institute Civil Undertook Structural analysis and of Science and Technology Engineer calculation for memebers action and pipe support for nuclear plant. ,

l

._.-..,-____.-._.ms_.e_._

2_

Jos history  !

1

'0

'.0 'U-i/ YEAR C&?NN/

~

, l ADDRESS YoGR TITLC DUTIES <

04 . TO I
i l Soil mechanics and materials testing.

! 63 65 ! Institute of Tech- Insturctor l

8 nology Chung-Chen ,

~

60 S'himan Development Assistant Structurals Design for Hydric power.

63 Commission Engineer (open Channel, heavy construction, etc.

I A

G l

i

+. _

-._1 _ _ _ . . _ _- .

  • _. _.*** * ..-*__... _ _ ,

ALAB RESUPE ORGANIZATION LAST NAME FIRST NAME DATE EMPLOYEE NUMBER MPQAD Clark Jeffrey 1 /31 /8 3 CPCo/623 NAME CITY STATE  ;%CR lDATESl DEG l l SCHOOL l 9/72 e:s 4 HIGH Henry Ford High School Detroit, Michigan College Prep !I Mechanical 9/75 COLLEGE Michigan Technological Uni-r Houghton, Michigan Engineering 11/79 B.S.

OTriER OTHER MONTH / YEAR COPANY/ ADDRESS YOUR TITLE DUTIES FR04 TO 12/79 3/81 Eaton Corp. Project Design / development new products, modifing Troy, Michigan Engineer standard products solving QA problems, developing manufacturing procedures solving plant engineering problems.

Quality Level II Q.C. inspector assigned to

, 3/81 1/83 Bechtel Power Corp Control piping /niechanical group. Inspecting Engineer installation / fabrication of piping systems. Witnessing & documenting l -

resting of piping systems, review of

% . . _ . .,  ; 7 _ g_ $37 ,

t,;11;;t, I

l l

t f

1 l

l

h. - AUS RESLFE

(-

i CR3 G ZATION LAST NA'E FIRST IWE DATE  :!?LOYd- fWdR MPQAD COLLINS THOMAS 3/1/83 CPCo PDS-270 SCHOOL tWE CITY STATE t%JCR lDRTES, DEG 9/64 $$

KOOTENAI HIGH SCHOOL HARRISON, ID. N/A 68

.' 8/68 e UNIVERSITY OF IDAHO MOSCOW,.ID SECONDARY ED.- NONE GENERAL SCIENCE gg

~

.-- :2, -ysh. '

M :w.

+

,&.,w.. --v..

kig.

so .

p: -

. h.:

(; -

~

3 Q':i. .

N YEAR -

C09ANY/ ADDRESS YCUR TITLE DLTTIES FRCM TO Iiispected concrete (pre-placement, place-4/8C 2/82 A.W.S.H. QC INSPCETOR me , & p st-placement); grouting; con-P.O. BOX 950 AT W.P.P.S.S.

RICHLAND, WA 99352 NUCLEAR PLANTE cre,te repair; resteel placement; field Fab. & adjustment of resteel; cadwelds; 1 &4

( embedded items; concrete curing; anchor.,

. CERTIFIED bolting; & concrete foms. Reviewed pour ANSI /ASME packages & prepared documetns for trans-LEVEL II FOR mittal. .

CONCRETE RE-

! BAR & CADWELDING l

3/79 3/80 PACIFIC TESTING LAB LAB TECH. Tested fresh concrete for slump, air P.O. BOX 752 AT W.P.P.S.S. entrainment, unit weight, temp. &

RICHLAND, WA 99352 NUCLEAR PLANTS cylinders. Performed destructive tests i

1 &4 on concrete cylinders, grout cubes, re-steel & cadwelds. Perfomed soil density tests, soil gradations & plotted results. Certified ANSI Level I for testing concre'te,,resteel & soil

~

ASME Level I for concrete & resteel.

10/70 7/79 BUDINGER & ASSOCIATES GEOTECHNICAL Performed soil tests related' to foundation N. 924 LAKE ENGINEERING design - densites, shear (confined & ,

SPOKANE, WA 99206 ASSISTANT unconfined), gradations, plasticity. .

.Analized Asphalt composition & built-up' roof composition. Inspected commercial construction. Assisted in preparation of soil investigation reports - drafting, making calculations & graphs.

\g. .

Jcs HISTORY

"'"" ./ g 4- l 2.; .

- - YOUR TITLE DUTIES <

CO?NN/ ADDRESS

}~4 0.'. TO I

! l h5/78 I

9/78 6 *KERR- MCGEE RESOURCES GEOL. ASSISTANT Gathered stream sediment, rock, &

g URANIUM EXPLORATION water samples for geo-chem uranium i DIV, exploration project. .

f 8/77 11/71 KERR - MCGEE CENTER ~

. OKLAHOMA CITY, OK.

l . .

8 /,73 11/7E U.S.' FOREST SERVICE FORESTRY TECH Timber gale preparation. Wildfire IDAHO & CALIF. suppression. Timber. stand inventory.

Habitat studies.

.I

. c .;

~ * *

- E f .e

~ ~

25:_ *

  • 3;! ?.C -' ' '* * , '. *;*

5.f. I.

W"+-

nr 4

9 e

9 t

  • e l um

( r

, 't ALAB REStPE '-

i RGANIZATICU C LAST NA'E FIRST NAME DATE E!?LOYEE f"JGER I -

j MPQAD Damrel Kenneth 2/4/83 383-68-9098

~

l SCHOOL l TWE CITY STATE t%)CR l DATES l DEG .

_.k HIGH East Detroit High East Detroit, MI College Prep 3 ma, Lawrence Institute Construction BSCE g; '

of Technology Southfield, MI Engineering 3 6/81 OTHER U"i"*#8itY f Detroit Detroit, MI Engineering 1 ---

OTF.ER

.M0tmi/ YEAR CCFPN#/ ADDRESS YOUR TITLE DUTIES

_RCM TO 12/82 1/83 Consumers Power Company Associate Inspecting Construction activities ,

t2 1945 W. Parnall Rd. Engineer at ,the Ray Compressor Station, for Jackson, MI 49201 compliance with design criteria.

10/82 12/82 consumers Power Company Associate Estimating Construction Costs for 1945 W. Parnall Rd. . Engineer modifications to existing fossil Jackson, MI 49201 plants.

9/82 10/82 Consumers Power Company Associate Inspecting construction activities 1945 W. Parnall Rd. Engineer al various electric transmission Jackson, MI 49201 construction sites.

[ 8/82 9/82 Consumers Power Company Associate Writing procedures for compliance 1945 W. Parnall Rd. . Engineer to State of Michi,gan Environmental Jackson, MI 49201 laws concerning solid waste disposal.

l l

6/82 8/82 Consumers Power Company Associate Performin'g Walkdowns fo systems, 1945 W. Parnall Rd. Engineer prior to turnover, to verify Jackson, MI 49201 completeion of'the system.

, w -

( (

Jos HISTORY IRO*CH/ YEAR l DUTIES

  • CO'?NT(/ ADDRESS YOUR TITLE i;RO.1 To i ev e esign documents for Quality 6/82!Consu'ersPowerCo.

m Associate ssurance requirements, organizing l3/82 l1945W.ParnallRd.

Jackson , MI 49201 Engineer documentation for structural steel to facilitate inspection of welds, participating in an audit and attend-i ing an Audit Team Leader training class.

1/82 2/82 Consumers Power Co. Associate Developing Computerized schedules 1945 W. Pa'rnall Rd. Engineer for the Midland Project.

Jackson, MI 49201 10/81 12/81 Consumers Power Co. Graduate Engineer Assisting a project Engineer in 1945 W. Parnall Rd. in Training design. review, interface between Jackson, MI 49201 utility and A/E and developing test methods for resin sluice ball valve.

z-6/81 10/81 Comsumers Power Co. Graduate Engineer Pre-operational testing of fossil 1945 W. Parnall Rd. in Training and Nuclear Power Plants.

Jacksen, MI 49201 l 12/79 5/81 Mich Dept of Transpor- Traffic Technician Marking prints to show as constructed l tation items.

2211 E Jefferson Detroit, MI 48207 9/79 11/79 Structural Steel, Inc. Surveyor Checking wall heights and anchor 47783 N. Gratiot bolt locations to find as built Mt. Clemens , MI 48043 dimensions.

6/79 9/79 Mich Dept of Transpor- Construction Tech- Testing Concrete for Air and Slump tation nician Testing compacted fill for proper 26038 Colman Dr. grade and density.

Warren, MI 48089 l

Y

, \

ALAB REStrE

'f ORGANIZATIG1 LAST NAME FIRST NAME DATE EMPLOYEE NUMBER MPQAD/QC Dausey Thomas 1/19/83 CPCO-BTI-187 SCHOOL NAME CITY STATE MAJOR DATES DEG HIGH North Muskegon High Schoo.. Muskegon, MI 1966 COLLEGE OTHER O'DiER MGITH/ YEAR C04)ANY/ ADDRESS YOUR TITLE DUTIES

[

FR04 TO I

Daniel International Cor . Inspection of grouting activities, 12/81 5/82 Enrico Fermi Unit 2 Quality coating inspections & documenting Control inspection activities.

l Inspector l

Daniel International Cor ). Inspection of concrete and grouting 6/77 11/81 Wolf Creek Unit 1 Quality activities, backfill activity inspec-Control tion, testing in the lab and fi,ld for Inspector concrete, soils, aggregates & reinforc-

3 w- , --,+;-  : - - - _, - v i n n , s. annu_

menting activities.

- Performing concrete, soils reinforc-U.S. Testing Co. Inc. steel & cement testing in the lab &

5/76 5/77 Clinton Power Station Lab and Fi.elc field. Directing & training of con-Units 1 & 2 Technicial crete. testing personnel. Document-l ing test results.

Performing concrete testing in the U.S. Testing Co. Inc. field. Aggregate, cylinder, &

12/74 11/75 Sequahanna Units 1 & 2 Lab and Fielc reinforcing testing in the lab.

Technicial Documenting tes't results. .

s 4

+' J03 HISTORY IN0MTH/ YEAR l~

  • CO?ANY/ ADDRESS YOUR TITLE DUTIES

!FRCM I TO l i i I t U.S. Testing Co. Inc. Performing concrete testing in the l

j5/74 11/7q Midland Nuclear Plant Lab and Field field, aggregate, cylinder & rein-t Units 1 & 2 Technicial / forcing testing in the lab. Docu-menting. testing results.

8' e

l l - . . . . . ... . . . . . . . . ._ . ._ . . .. . .

. ALIG RESLPE CRG * *G2ATICH LAST NAME FIP.ST iMME DATE EvPLOYEE tu rd R DeWitt Mark 3-10-83 380-48-9890

  • MPQAD/ Soils l

i l

SC400L NA'E CITY STATE t%)OR %UES , DEG .l l

. g8 \

Saint Francis xavior.. -i N' ' C AE

~ ~

College Prep 63-67 HIGi .

Petoskey Mich.

W m i er:e University of Michigan s Ann Arbor Mich. - Civil Engineering' 72-75 BSCE.

t

' ~

'* - (evenings) - . Masters-Business M Central Michigan Univ. $ Mt. Pleasant Mich. Admin. 78-8f MBA ,

-- Pre-rec *s ior~

b 77-78 n/a Delta College University Centre,Mich. MBA l .

MQ{TH/YCA re * '

COPANY/ ADDRESS 'YOUR TITLE DUTIES Frei TO 2/81 1/83 Consumers Power Co. Night Shif t CPCO Rep. for all night shift activities Midland Energy Station Super. with the prime & sub coritractors tio in-Midland, Michigan clude testing, construction, activities monitoring, production evaluation, man-i c

power evaluation, non nuclear const. *

' 'uninneinn.

5/77 1/81 CPCO quality Assurance QA Engineer Mech =I&C, HVAC, reactor Bld. piping, EI & TV storage & maintenance. Evaluated via Mechanical audit & inspection overview of con-tractors compliance to requirements

  • worked on HV & AC stop work & program QA Eng. re-write & activation.

EI & TV reviewed & verified all embedded items

~

Civil conformance to design' dwg. & spec. re-quirements. This scoped from procure-I ment to final placement. Methods = Doc review, physical measurement, Audit.

9/76 5/77 CPCO Proj. Management rield Engineer Production, constrpction methods /de-Midland Nuclear Containment sign placement checks, schedule, con-

  1. 1 & #2-Civil tract enforceme'nt,,CPCO Rep, for cost &

~

schedule forecasts. Reviewed material rec'd for need & accuracy.

Cost Engineer Evaluated construction cost & production 1/76 9/76 CPCO-PMO l

levels (actual & forecast). Reviewed

  • 1

' contracts for unit rate estimates. . .' .

' *~

Tracked back charges of suppliers.

Evaluated const methods, formulated simple trend models for rate project-ions.

D

. JasHISTGY ,

~' "_'.'- /c*, - l DUTIES <

~- -

CO?NW/ ADDRESS YOG TITLE AU' I TO I Survey Crew Chief Crew Chief: Topographical, road &

5/75I 9/75lCityofSaginaw Facility layout, bridge bearing &

? Washington Street ISaginaw, Michigan true layout, plat map, floocf plain

  • I surveys, invert mapping, sewerage
  • mapping. .

-SAME- -SAME- Same as above 4/74 9/74 b

-r ,

p W

e

=

e ,

T l .

l p

e o

e l

l e

e n -

s

, ALAS REstrE i CRGA';*ZATICN LAST NA'E FIRST fMME DAi:  ::!?LOYEE ffES MPQAD Soils EVANS JOHN 12/4/82 CPCo-364-38-2597 I

' SCHOOL tWE CITY STATE t%)OR Dn"lES , DEG HIGH Jackbo.n High School W.s Jackson, MI Science / Math 57 M TE

'~

COLLEGE: LawpenceInst. Tech. Southfield, MI B.S.E.E. 67 none

- i[ , y-OTHER gt'?

y- '- ";L ~'

g-  ;;{, e -

c '

MCNTH/ YEAR TO ccrPANY/ ADDRESS YOUR TITLE DUTIES FRCM 9/71 A eptance qualitycontrol of major elec.

pres. Cons'umers Power Co. Major equip-1945 W. Parnall Rd. ment coordin- bulk power equipment - quality assurance Jackson, MI 49201 c rdination of vendor U.R.D. product

.a ator for elec.

testing. Application coordination of bulk

,""8* o d pt . power e uipment, specification drawings Lay out inspection of vendor products, set 69 71 Huebner Co,rp. Layout inspec- up procedures for QC in accordance with Hupp Ave. tor requirements of Ford Q-101.

Jackson, MI Quality Control Inspector Ccordination of product deficiencies 67 68 Lear. Jet Industries QA Technician resolution with industrial engineers.

l Stereo Division ~

Lyndon St.

Detroit, MI Evaluation of final testing for peri-3/69 9/67 Contral Data Corp. QA Technician pheral computer equipment Rochester, MI Production testing of sealers and adhesiveg 58 63 Martin Marietta Corp. QC Technician for automotive industry.

Presstite Division:

  • Jackson, MI 'l

.' ALAB RESUME y e-ORGANIZATION /DPQRb LAST NAME FIRST NAME DATE EMPLOYEE NUMBER Butler Services Farrall Ross SCHOOL NAME CITY STATE

%)CR l DATES ( DEG l HIGH Cathedral High School El Paso, Texas General College py,p, 1969 NM Es#

199 1979 Jones College Jacksonville, Florida Marketing & to COLLEGE Business 1980 8/73 l Navy "A" School SanDiego, California Electricity & to Grad. 1 OTHER Electronics 4/74 OTHER MONTH / YEAR COPANY/ ADDRESS YOUR TITLE DUTIES FR04 TO e ew packages.

F;b Dec U.S. Testing Company Elec. QC Coordination of pre-operational and 22 16 1415 Park Ave. Mech. QC hot-operational integrity testing, 1982 1982 Hobotien, New Jersey Level II torquing, valve disassembly & re-assemb]

flange bolting program.

Reactor Controls, Inc. Mech QC Outage / Surveillance and inspection 1/82 2/82 Northeast - Services of block wall modification per NRC g

Division. Syracuse, N.Y. Bulletin IE-80-11 a n enan e an seMce inspecdon.

7/81 1/82 U.S. Testing Co. Elect. QC ev e fr na sign on of con dolled 1415 Park Ave. Level II pa ages. Field inspections to Hoboken, New Jersey Mech QC applicable codes & specifications.

gy,y 7 Inspection to IEEE Standards and 5/81 7/81 U.S. Testing Co. Elect. QC applicable site specifications during 1415 Park Ave. Level II initial stage of steam generator re-Hodoken, New Jersey placement outage.

Elect. QC Inspection of piping system welds, 5/80 3/81 U.S. Testing Co. Leve II electrical & mechanical supports, 1415 Park Ave. Mech QC equipment installation, cable pulls, Hoboken, New Jersey Level I terminations, and torquing.

VT Level I

, Jos HISTORY

!NONW/ YEAR l C04WlY/ ADDRESS YOUR TITLE DUTIES

' i

.F9G4 I TO j Outage / inspections of smoke & l 2/80 3/80 U.S. Testing Co. Elect. QC fire detectors, start-up transformer ,

i 1415 Park Ave. Level II tie-ins, boric acid make-up lHoboken,NewJersey station, electrical supports. O U.S. Testing Co. Elect. QC Inspection of electrical / mechani-1/80 2/80 1415 Park Ave. Level II cal supports, cable pulls, receways i Hoboken, New Jersey Mech QC and termination during outage.

Level I VT Level I Ship plant electrical maintenance 3/73 8/79 U.S. Navy Electrician and operation, cable pulls, race-E-4 ways and termination.

I i


,e- w.v-v,-ew,-,-e- w,- - - . - , - - - , ----- e- , _ , _.__,_, ,--______ _ __.,_ _ _ , __ - - - -_ - - -

ALAB RESlFE ORGANIZATION LAST NME FIRST NAME DATE EMPLOYEE NWBER yg FOX LEE 3/7/83

  • SCHOOL NME CITY STAE MAJOR DATES DEG 1 3 rad.

HIGH ST. BEDE ACADEMY PERU., IL. COLLEGE PREP 1976

\

CTV f MF OTHER MCNTH/ YEAR pgg c0PANY/ ADDRESS YOUR TITI.E DUTIES 70

~

6/81 8/81 MK/ESI/ LORD Receipt Receipt Inspection of all incoming Satsop Power Plant Inspector materials, weld rod issuance & control

'f- Elma, WA. , ,

j 2/81 4/81 MORRISON KNUDSEN QC Inspector Surve.il. lance of ongoing concrete pours Satsop Power Plant ,

. - - PLVI Pre-placement, stud welding, Elma, WA. mapping & cons. Inspection, Hydraulic soil cement inspection, weld rod control 5/80 2/81 J.A. JONES QC Inspector Pre-Placement & Placement of concrete, Satsop Power Plant structural steel inspection, waterstop Elma, WA. weld inspection,' receipt inspection of incoming items, hydrostatic testing of metal pipe 8/79 5/80 PITISBURGH TESTING QC Inspector Lab & Field soils inspection, Lab &

LABORATORY field concrete inspection calibration Satsop Power Plant .

of field & Lab EQPT., Training of Elma, WA incoming personnel 3/79 8/79 PEABODY TESTING QC Inspector Feild & Lab Tech in soils & concrete, l SHITE BLUFF surveillance.of ongoing fill & con-Power Plant crete pours.

l Redfield, ARK.

l I

l

.' \

Jos HISTORY i

'N#!" COMPANY / ADDRESS YOUR TITLE DUTIES

  • IFRU4 I TO I l l3/78I 3/79lA & H Engineering QC Inspector Feild & Laboratory in soils & concrete

' inspection, batch plant inspection &

l I

lMeromPowerPlanta ILaSalle Nuclear Power j cadweld inspection ,

i Plant Merom, IND. &

Marseillee,.IL. -

Q/77 3/78 U.S.D.A. .Conservation Aide Surveying, Construction surveillance, Soil Conservation soils typing Service LaSalle County, IL.

I 8

e SS 1

o .

______.__._a '

2 ___e.__._ Q*___._ _e * ._ e- 9"- .. - , . - - . , , . - . , .* - - * , .,2 CD s ci; ipa , =g g & 9 .Q9. . . - . + e ,,v_, . _ _ ,

ALAE P5SlF2 k

i ZAT10N mAQAo LAST ltWE FIRST fME DA : d?LOYEE TUEER lCR31:: Comsumers Power GARNEF, TED 2/28/83 CPCo-NES-396

  • I SCHOOL N;!E CITY STATE f%)OR l DATES iDEGl HIGH LaPlata High School LapLata, MD General 1960 1963 M,-d.

g , gne Northern Virginia Annandale, Virginia Civil Eng & Tech 1975 Community College and Construction Mgmt1981 ggk:

wor ng @

g G . E .'D . Received State of Virginia General 1979 OTHER MmTH/ YEAR COPANY/ ADDRESS YOUR TITLE DUTIES Mt04 TO 9/81 12.82 Bechtel Power Corp. Grade 23 Preplacement, placement, postplacement Hope Creek Nculear QC Engineer ctd all concrete placed in assigned area

_' Power Stateion, Salem, NJ also reinforced stee'1, structural l backfill cadwelding, grouting, welding' and repa r of concrete l 4/75 9/81 Bechtel Associates, Grade 23 Field inspection of underpinning, tunnel-

! Washington D.C. . OC. Engineer ing, earth retention systems, foundations j concrete, reinforce Piers, column footings

, prestress piles, poststress for concrete beams.

6/74 4/75 Morrison-Knudsen Company Foreman Conventional tunneling and Washtington, D.C. exvacation installation of reinforced steel placement of concrete l

l 10/72 6/74 J.D. Shea Company Foreman Conventional tunneling, placement Washington, D,C. shoterete, reinforce steel, placement

_ concrete installation of rock support systems.

l 12/71 10/72 Intercounty Assoc.

Washington D.C. Foreman Underpinning of soldier piles, legging and placing shoterete for support ..

of excaation. .

v. .

. . JosHIsToRY ,

. :_. ._ . fs".  ;

CD NW//5 PISS YCfjR TITLE D'JTIES *

[" " "",. To i;::c.' . I k i  !

S.A. Healy Miner Nozzelamn for placement of shot 0 rete

.l1/70 12/71lI Washington D.C. and conventional tunneling, Rock bolts, t /

  • 6 I -

f-

.I

~ . . . , t  : ;_ =.. ... .

ss-

"_'. ga

, ein e

e e b me e

4 i

. e O

i D

9  %

_..--.-,e. . . - _ . . , - - - , - , , - . , --, ,_, - . . m, -, . . . - . , , ,, .- , , , - - _ _ , . , , , - - - _ _ _ _ _ _ _ . . _ _ , . - _ _ . , , - , , . . . , , , - _ - . , - - .

.V ,

/ ALAB REStME ,'

CRGANIZATICH LAST iWE FIRST NAME DATE EMPLOYEE tr yd R MPQAD Glass Lawrence 2/18/83 SCHOOL NAME CITY STATE l%JOR 1 DATES l DEG HIGH Mohegan Lake High School Mohegan Lake, N.Y. ,

Academic 1962 --

m i me ,

l I

l OTER .

'OTHER , .

~

M3fiH/ YEAR COPANY/ ADDRESS YOURTbtE DUTIES Rm TO Responsible for final review', verifica-WBG (TV) Senior tion and approval'or quality related Pm 9/81 3/82 Hanford Washington Quality chase Order and Receiving documentation WPPSS Plant #2 Engineer Verification of Code., Specification and Richland, Washington . procedural compliance prior.to turnover ococo e a n -, ,- .. t_ , + 4 a- +n +he owne .

Surveillance of QC activities pertainin; Burns & Ro'e QA to the receipt, storage, installation, 9/79 3/81 P.O. Box 200-

  • SurveTU ance and testing of mechanical items and

- Richland, Washington Engineer piping systems. Writing site QC inspec 99352 .

tion procedures and instructions. Re-view resolutions to discrepancy memos QA and NCR's for acceptability and compli-Brown & Ro'ot, Inc. Surveillan e an e with codes standards and procedure P.O. Box 3 3/78 8/79 Houston, Texas 77001 Engineer Review and su W t resolutions to Audit Deficiency Reports.

Write procecures, organize ano scneaule w rkloads of inspection personnel.

Power' Systems Inc. Quality Train field inspection personnel. Es-11/76 .3/78 1211 E. Tower Road Control - tablish vendor surveillance procedures Schaumberg, Ill. 60196 Site 8 8* E# ** 8 " "~

Supervisor

  • 878 tors.

Train inspectors to fulfill all requirG General Dynamics, Inc. Foreman- s of M codes, ad conkac hal Electric Soat Div. QC Mech. &.

3/% 11/76 Shippins; port, Pa. Welding Insp.

.aequirenen s f r e W a er reedc

( -

er modification to the existing power Department system. NDT Levels: Level II MT and Level II PT.

i

\

=.

-- ~

, t

('

Je HISTmY l'tCH/Y:Ja CCW#1Y/ ADDRESS YOUR TIT 1.E DUTIES -

ic:aM i To Morrison Knudson Co., 11c.

9/75 3/76 400 Broadway QA Inspector-P.O. Box 7808 Mech. & Pip 4ng NDT Level II LP and Level II MT {

Boise, Idaho 83729 '

pept, ,

Hu'ico, Inc.

.0. Box 717 kA h& ipbkg ND Level II LP and Level II MT 6/74 9/75 Ranier, Oregon 97048, Dept.

Welding inspection, to include nuc-

"1**** ' 8* "'I' I"

  • lear class Piping, control of specic 3/73 5/74 F e d QC processes. Non-destructive' testing Sacremento, California 3,7y ,,

LP Level II, MT Level II.

M.W. Kellogg, Inc. n- destructive testing, LP Level QA Inspector Diablo Canyon Power Plt II, MT Level II.

8/72 3/73 Avila Beach, CA ,

Branch Radiographic Non destructive testing, LP Level QA Inspector Labs,In . . II, MT Level II. .

3/71 7/72 Indian Point Nuclear P1;.

Buchannan, N.Y. .

Information Displays, I1c. nsPection of incoming parts and

, QC Tech. ma er al. nd f line pr duct Electronic and 11/70 6/71 Mt. Kisco, N.Y. es ing, assembly line wirer.

Mechanical l

t I

l *- AL'G RESlfE i LAST NAME FIRST iMME DA e dPLOYEE TRMEER lCR3A*UZAT10N MPQAD - QC GROAT, CHARLES J. 3/2/83 CPCo-SAI-544 (SCHOOL ta'E CITY STATE t%JOR MTES , DEG.

g HIGH Palatine High School Palatine, Ill. General 1955 1958 g]

m i mF ~

O g Techhi. gal Education E.t. Paul, Minn. Total Quality.Contro L 1972

-_ ,., b -

-NO Ot.fr , . '?,

q~; J -- <

s y;; ,. j;,1 N

COPPANY/ ADDRESS YOURTITLE DUTIES FRCM TO 10/81 11/82 Cincinnati Gas & Electric QC Inspector Second line inspection over H.J. Kaiser (Zimmer Nuclear Plant) on installation of pipe supports Moscow, Ohio ,

5/81 10/81 J.K. Comstock QC Inspector Reinspection of installed Hilti-anchor (Midland Nuclear Plant) bolts of installed pipe supports Midlan, Michigan -

1/80 4/80 Bechtel Corp. QC Inspector Reinspection of anchor bolts of installed (Palisades Nuclear Plant) pipe supports, plus velding inspection South Haven, Michigan of supports 7/76 1/80 Bechtel Corp. QC Engineer Inspection of installed pipe supports, piping, electrical supports. structural (Midland Nuclear Plant)

Midland, Michigan beams, nelson stuqs. Also hydro testing, NDE Testing' walk downs of piping, neumatic testing (PT) 5/75 5/76 Roberts Automatic Products Machinist Set-up and operate acme gridley auto-St. Paul, Minn. matic screw machines -

r"

i;-- -- -

=.. - - -

JosHISTORY

'ID TH/ M I CO'?tJN//JDRESS YOUR TITil D'JTIES *

i ac.' ; TO I

,5/74 I 5/75lMcPhillipsBrothers Roofer Flat tan and gravel roofing

}

'I Roofing

  • l Red Wing, Minn
  • I .

5/70 5/74 Ndtional Valve and QC Inspector Inspection of installed pipe and Manf. Co. supports, hydros, walk downs of (Prairie Island Nuclear pipe. . Receiving inspection, NDE lant) .

testing (PT) piping lead in contain-Red; Wing, Minn. ,, c ,.: ments.

9. s.  :

. . x. . .: ,

Set-up and operate Davenport'; Auto-5/68 5/70 Scr,qw Products'or. [

Machinist ,7f; Amecica matic Screw Machines. Became; lineman South Gate, Calir. for eight machines.

1/67 5/68 Yale Engineering Machinist Trainee Set-up and operateDavenport Auto-Downey, Calif. matic Screw machines

  1. ~'3/65 1/67 U.S. Postal Service Letter Carrier Deliver, mail Arlington Heights, Va.

0

[

h

. ALAB RESlfE l

, 1 CRGN4IZATICt1 LAST NAME FIRST NAME DATE EMPLOW.E fUGER l MPQAD - SOILS Humphries Michael 3/1/83 CPCo TTS-420 )

SCHOOL N#iE CITY STATE MMOR DATES DEG  !

61 HIGH COFFEE COUNTY CENTRAL MANChES'r'ER, TENN. MATH & SCIENCE 6 65 1 COLLEGE UNIVERSITY OF TENNESSEE KNOXVILLE, TENN. PHYSICAL EDUCATION to No 67 g _ I E . .

MCNTH/ YEAR FRCM TO.

cCtPANY/ ADDRESS YOUR TIkl.E DUTIES 6/82 2/83 Tenriessee Valley Authority Construction llanger Engineerin,g Unit-Packaging WATTS BAR NUCLEAR 2ngineering Engineer responsible for , timely installc

g. P.O. Box 2000 Associate , ation per associated dr4 wings, specs, Spring City, TN 37381 -

etc... Some problem-sdfv'ing and some skalkdown. I 5/77 5/82 Tennessee Valley Authority Construction Materials & Civil QC- Supervised 7-9 HARTSVILLE NUCLEAR , Inspector personnel in field inspection of con-P.O. Box 2000 crete placing, curing, finishing, repais Hartsville, TN. 37074-

& testing. Scil placement and testing protective coating; chemical grouting steel erection for cooling tower place-ment. Calibration of test equipment.

7/74 4/77 Tenne.ssee Valley Authority Construction Materials QC -- Field inspection of con-WATTS BAR NUCLEAR Inspector crete placing, curing, finishing, repaig

. P.O., Box 2000

_ & testing. Soil placement and testing; Spring City, TN 37381 chemical grouting, and inspection of central batch plant operations.

Calibration of- test equipment.

. / v -' ' ' " ' .

Jcs HISTORY

" ",fy CCFPATN/ ADDRESS YOUR TITLE DUTIES <

=PCM TO 3/73 7/74 Tennessee Valley Materials Concrete Laboratory - Testing Authori ty Tester of concrete materials, soil-NORMANDY DAM PROJECT testing; inspection of portablo P.O. Box 200 batch plant operations & calibr$tici

. Tullahoma, TN.

~

12/72 2/73 Pete Sain Construction Laborer Light building Construction.

Company Manchester, TN 37355 e

6 . .e.

O 4

l _ _ _ _ _ . . _ _ _ . _ . _ _ _ .

' ~

  • ~

> ALAS RESLP2

( (

i LAST NA'4E l CR3A*GIATION mp4Ao FIRST fME DATE- E!?LOYEE IU9ER

, Bob Taylor, Inc. Huron, Randy 2-21-83 CPCO-BTI-397 *

' SCHOOL fME CITY STATE f%)CR IKTES DEG, g}g Robert E. Lee Baytown, Texas College Prep. 72 r

[

W MfMC Texas A. & M. University College Staticm, Texas Building Constructic n 80 BS I

I I '~.

( M --

. w .*

  • y '- ;

(

M UH/ YEAR

, EM TO CN/N TITLE W TIES

~

1 12/82 2/83 Amatek, Inc. , Midland, MI Engineer Consulting, Research and preparation (Consulting / engineering for Court cases.

,,' firm-structural) -

l Inspectionand verification of concrete j 9/80 7/82 Bechtel Pow'er Corp. grouting, structural backfill, mechanical i Midland, Michigan -

QCE splicing and other activities related to underpinning. Also worked as Level II training and certifing new employees.

  • Concrete certification included post

~

placement, placement and post placement certifications, also included drilling of wells, dewatering, stud welding, and i expansion anchors.

~

i i

e S

e a - , , - - - - - _ . . . - , . , . , . _ ,

r ALAI 3 RESU*E i LAST fWE FIRST tWE DAt: :SPLOYEE TUGER l CRGA*:IZATION MPG AO

  • 3 Gilbert / Commonwealth Karabo-Johnson Alfred 1/20/83 CPCo-GC-267

~

SCHOOL tWE CITY STATE t%)0R DATES DEG HIGH Kilburn High School London; England Academic Courses 1970 1972- ligher C0r i pr,E Klillesden College of Tect London, England Civil Er.gineer 1974 '4 a t .

u Civil - Structural 1975 OTHER Hatfie'ld Poly Tech Hatfield, England and Geotech. Eng. 1979 3SC Civil-Sanitary 1979 OTHER University of Michigan Ann Arbor, Michigan Eng. 1981 4SC MONTH / YEAR COPANY/ ADDRESS YOUR TITLE DUTIES

.Mi&1 TO Design of concrete structures such as p pavements, walks, bridges, underground 1981 $ storage facilities and ash pond pipe e Gilbert / Commonwealth Design Eng.

lines. Also for design and analysis E .. of sanitary and storm sewers.

Civil Eng.

, Civil Engineer responsible for quan-tities estimates, slope stability analysis, soil testing, FERC reports on hydroelectric dams, site inspect-ion for construction of a low head I hydroelectric dam in New York and a bridge reconstruction project in Mi~chigan.

l l Analysis of the sewer system, test

[ well drilling for design of a,well l ,

McNamee, Porter and field, and urban pollution and de-1980 1981 Seeley, Ann Arbor, MI Engineering' cay studies considering control of Technician j$syfim$nt"$f8eESN[k*ng"Neghe i Struct. and Syst. desing of fact.

Including supervision of a cassava processir.g plant, 0.5 mile supply pipeline, and complete struct. de-Jamaica Industrial Dev. sign for most of a small industrial 1979 1980 Corp., Kingston, Jamaica Design / Work complex.

Engineer

- hhhm M 4 --g. mec6- 46 m ? m Q OOeOOw cmi _ dug _O C eQp 6 cp = a ,g

JosHisToRY

!90ST-i/Y:_AR l YoUR TITLE DUTIES <

CO?ANY/ ADDRESS i;::0.' l TO I i t l Surveyor for claring and construe.

fHiggs&HillConstr. of highways. Duties included l

ge technical test and calcula-l1974 1979 8 Co., Surrey, England Surveyor

/ tions on foundations, slope stab-ility, aggregates and concrete rnme I

c l

i l

l l

l l

l l

hlABRESLPE ORGANIZATICN LAST tWE FIRST NAME DATE EMPLOYEE FRNBER MPQAD - SOILS QA KETTREN LEROY 3/7/83 CPCo GC 375 c 211-36-9958 SCHOOL fWE CITY STATE t%)0R DATES DEG 9/60 HIGH DORMONT HIGH SCHOOL DORM,0NT (Pittsburgh) PA . to 9/64 -

CUIME KENT STATE UNIVERSITY KENT OHIO GEOLOGY to- B.S.

A /AA

, 9/68 ON VIRGINIA POLYTECHNIC INST. BLACKSBURG VIRGINIA GEOLOGY to M.S.

A /~10 OTHER ,- .

MCNTH/ YEAR cQPANY/ ADDRESS YOUR TITLE DUTIES FROi TC.

2/71 9/73 GAI CONSULTANTS INC Geologist knspectorforearthwor)+andfoundation 570 Beatty Rd construction including drilled piers.

Monroeville, PA 15146  ; . Inspector of site and subsurface in-

. vestigations performed soils lab. tests.

10/72 12/80 DAMES & MOORE Staff Geolo- Performed inspection duties for site 1550 Northwest Hwy. . gistr Prtrject investigat' ions, PSAR preparation or

. Park Ridge, IL 60068 Geologist remedial work at nuclear power plant

, Project Mana- sites: LaSalle County, IL; Callaway ger County, MO, Dresden, IL, Clinton, IL Project Manager of rock mechanics studies in coal mines.

1/81 pre- COMMONWEALTH ASSOCIATES, Sr. Engineerin J Inspected deep foundations for 1000' sent INC. Geologist chimney, PA. Monitored vi_bration

. 209 E. Washington Ave. ~

during pile-driving Ohio. Performed Jackson, MI 49201 geotech investigations for reservoir Ohio.

ALAS Rest.rE i cas -::::.ATies. LAsT NA's FiaST rwe cA = estoyas. nn.za i I

l MPOAD - Soils Kirschner Phillip 2-23-83 CPCo-GC-345 '

I SCHOOL iWE CITY STATE '

f%)0R l DUES , DEG HIGH

! Clarence Central H.S. Clarence, New York College Prep 1967-1971 hk Bucknell University Lewisburg, PA Civil Engineering 1971- B.S.

@OE 1975 C.E.

Purdue. University West Lafayette, IN Civil Engineering 1975- M.S.

OM -% .,- . g.:,

$.5 - Structures. 19761 C.E.

y -. .

MONTH / YEAR CCPPANY/ ADDRESS YOUR TITLE DUTIES FRCM TO Fossil fuel plant retrotit project (coal) 5/26/1 2 Gilbert / Commonwealth Design EngineerDuties : complete structural design of preser t 209 E. Washington Ave. IV - Grade 26 major project structures, supervision of

.y Jackson, MI 49201 drafting personnel, preparation of eng-ineering reports, bid evaluations, design review .

Fossil fuel plant retrotit project (coal) 5/81 5/82 Gilbert /Co'mmonwealth Design EngineerDuties: lead engineer role on majorconcrete 209 E. Washington Ave. III - Grade 25 bridge deckstructure encompassing struc-Jackson, MI 49201 tural design, periodic overinspections of construction (site) and precast beam man-l .

ufacturing site, design review Fossil tuel retratic project. uucies.

6/79 5/81 Gilbert / Commonwealth Senior Assoc. structural design of retaining structures, 209 E. Washington-Ave. Engineer foundations, design reviews, preparation Jackson, MI 49201 Grade 24 of civil specifications, supervision of drafting personnel Fossil fuel retrofit project. Respons-1/79 6/79 Gilbert / Commonwealth Associate ibilities included preparation of engineer-l 209 E. Washington Ave s Engineer ing reports and studies, civil spec-l Jackson, MI 49201 Grade 23 .

ifications Fossil fuel plant project (oil)- Tabriz, 12/&( 1/79 Gilbert / Commonwealth Associate Iran. Responsibilities included design re-209 E. Washington Ave. Engineer view of concrete. detail drawings for c6n-Jackson, MI 49201 Grade 23 formance to design criteria. Engineer 7; Contractor - Alsthom Atlantique l

i e

JosHisToRY

"",v*

l CO?A!W/A* DRESS YO'2 TITLE DUTIES <

b 3.- l To I g g Nuclear power plant pro]ect. Duties:

jj7/77 12/79; Gilbert / Commonwealth Associate Engineer preparation of both safety and non-j 209 E. Washington Ave. Grade 23 safety related specifications, struc-3 1 Jackson, MI 49201 f tural design and design reviews, prep-aration of design criteria, seismic analysis l .

Nuclear power plant project. Duties:

8/76 7/77 Gilbert / Commonwealth Assistaht Engineer PSAR preparation, preparation of 209 E. Washington Ave. Grade 23 specifications (including on site Jackson, MI 49201 testing specification - safsty re-t' lated Development, procurement'and set up 9/75' 8/76 Purdue University Graduate Teaching new structural model testing lab Wes't Lafayette, IN. Assistant (quarter time)-

6/75 l8/75 Gannett, Fleming, Corddry, Assistant Design review of structural concrete Carpenter Structural and foundation calculations for con-Harrisburg, PA Engineer crete : bridge Preparation of structural steel 6/74 8/74 Acres American Draftsman layout drawings for steel mill Buffalo, NY -

renovation project e

l

( ALAS RESLPE I CR2A*: 7.ATic4 LAST NA'4E FIRST iMME DATE Ef9LOYE:-ic EER MPQAD KIST, WOODROW 3/2/83 CPCo-NIC-604

' SCHOOL tWE CITY STATE PRJOR IKTES DEG.

Festus Senior High School Festus, M0 Gener'al 8-65 M HIGH to -

' (:i 6-68 ,,L, Narrenburg, Missouri 0 g Central Missouri State Business University 6-69

. 8-71 UTHER El PasoyCommunity.; College' 4Colorado Springs, Colo. Business

, . J ' to 12-71 3.h., . u -

g

^

~

's.[ - ,

J.- .

M(NTH / YEAR FR04 TO COPANY/ ADDRESS YOUR TITLE WTIES 7-82 2-83 Baldwin Assoc. Level II Review of departmental documentation.

Clinton, Ill. Civil QC Surveillance and inspection of concrete, Inspector soils, structural steel and anchor bolts.

4-81 4-82 Stone & Webster Engineering Level'II Review of departmental documentation.

l Corporatior) '

Civil QC In- Surveillance and inspection of con-St. Francisville,La. spector crete grouting coatings.

9-76 7-80 Chrysler Corp. Assembler Major floating assembler and line in-Fenton, Mo. . Inspector spector.

I 5-75 8'-76 Pittstyurgh Testing Labor- Level I Reviewed documentation. Inspection of atories Civil QC concrete soils, piping, mechanical, 5445 Highland Park Drive Inspector ,

structura; steel..

St. Louis, MO 6-64 5-65 Kist Distributing Co. Route Supervis- Annual sales forecasts, super' vised 11 Festus, MO or, Warehouse driver / salesmen for a complete line .

Manager of dairy products, .

t W"

< ~

l .

ALAE REstraz

(

CE3A?CIATICi LAST T4A'd2 FIRST f3y- dam  ::!?LOYEE fUEER 1

i BECHTEL f /TI9GAO Krill, Timothy 2-23-83 238916 SCHOOL tWE CITY STATE t%)OR l DATES,DEG.l HIGH 1962 $$

Portage Portage, Indiana College Prep 1966 g l

ggg Indiana Gary, Indiana Geology 66-67 71-72 Araphahoe Community Littleton, Colorado oncrete Te nology
o r e OTHER Purdue Hammond, Indiana Construction 1980 OTHER Technology 1982 OTHER Emily Griffith Opportunity School, Denver, C0 Drafting, Welding 1972 M3iTH/ YEAR CCFPNiY/ ADDRESS 'YOUR TITLE DUTIES FR04 TO 1/83 pres. Bechtel Power Corp. Construction Inspection of Underpinning Operation Midland, Project 7220 QC- MPQAD Underpinning
  • 4/82 1/83 Bechtel Power Corp. * * *# " "*

Construction Midland Project 7220

  • QC-

. ru ng ypacung 5-27 Bechtel QC- concrete curing 11-1 M 2 CW1.QO Welding 7-13-82 C2.2Q Fab, Mis Metals 9-15-82 C3.01 Spent Fuel Pool 9-26-82

,3.04 C Spent Fule Pool 9-28-82 l

l l

l 4/80 4/82 Salisbury Engineering Concrete & Resident inspector for various projects 1501 E. Main -

Soil To Include: Physical analysis of cements Griffith, Indiana Technician- Physical testing df soil and concrete, NDE training (PT), asphalt QC, Batch plant inspection (deep-tunnel, Chicago) 8/76 5/79 Aspen Leaf of Colorado Assistant Hiring, Firing, Employee review.

Colorado Springs, C0 Manager 9

,-------,.-.-,,-------,,--,,,----,,-.-,e , , , , - , ------,v--,,.---m-n-----.< ,--

p y. .

~ '

Jos HISTOP.Y t

"~. :-.

" ' .- fy*, - l CD?ANY/ ADD:ESS YO'2 TITLE DLTTIES

  • i 3.t l TO 1 i I 1/758/76!A.M.A.X. " #* * * " ""

QC Underground, Assistant Batch

.I l Henderson Mine Plant Operator 3

Empire, Colorado " *#8#0""

l /

  • I 1/74 11/74 F."M. Fox & Assoc. Resident inspector stapleton Concrete Soils 1348 Independan'ce International Airport Denver Wheatridge, CO * " '*"

r-' .

6/73 10/73 Abbott Construction Lead Man General concrete construction 3785 W. 27th Street. Concrete Crew Denver, CO -

11/7; 6/73 Pre-stress concrete QC Inspector Quality Control of Pre-stress twin-tee of Colorado 6800 Raitan Denver, CO 6/67 10/72 U'.S. Steel Corp Apprentice Electrican Electrical Maint.

Sheet & Tin -

Gary, Indiana Laborer Operating production equipment

" Interupted by Militar) Service U.S. Army S P-4 Battalion Legal Clerk l

l e

g - -

4

/

-" ALA3 RESUME l

. ,. . .. - - . m -

c . e n t. . . n : O ..n t .ce sn-. a e.. .;

r

.2 .m. .e. . .ri ne....- >n.r

,i r--

r.t r.s r 0 v. _r.r.

_. r.

Eechtel QC LAggggL, lay 37;'CE 1-21 53 5&1 .h6 k162 TA)

CITY STATE MAJCE DATES DEG.

SCHOOi NAME HIGE North Catholic Portland, Oregan 1953-1962

  • Metal- 1975-
OLLEGE Centra Costa San- Peble, California urgy,,delding 1976 e ng k.sp 0 vr: - - -

Columbia Easin Pasco ,-Wasxhington AWS 1979

- Compute ** '196'0-vT n t.r- Nort.nvest Business Portland, Oregon Programing 1970 COLLEGE ' University of Oregon Oregon 1962-May 196'i KONTE/ YEAR i COMPANY /ALDRESS YOUR. TITLE DUTIES

_ ROM I TO August Lee, Bestco Journeyman PT, IC & UT of installed clans I 1983' 1932. Hanford, Washingten HDE Insp material
  • Provided visual & NDE inspection

, M-K/ESI/ LORD QC & 3DE {PT&MT)

^ ^

Elma, Washington Inspector Leve1II and documentativn of NSSS piping AWS.QCI __

system and main steam cage.

~i June Dec. Coordinate and provide first line J.A* Jone"- "V

  • Se"-o^4-VT inspector and perfor= UDI on Clans
1981 1931 Elma, ,4ashington Inspector & ,uh., .  !
1. Oversav velder and velding PT a. .IC Level II trocedural Qus2. tests.

and n,WS-QCI

  • Feb. June Wallace-Superior QC lead Inspector Provided first line QC inspecting-Elma, Washington and documentation for shop fab, of 1931 1981 HVAC duct work and Assoss. Class I of equip.

I Feb. Feb. Project Quality Welding, =echanical and piping 1c En ineer surveillance inspection t

. 193 C - 1981- fascoSer7nges 3 a, Wash .on -- ....,

, eve, 22 r.c sv. m,7 L-

J03 HISTORY MCGTE/ YEAR COMPANY / ADDRESS YOUR TITLE DUTIES FRCM TO J.A, Jones QC Engineer Oversaw VT, PT, LT on Nuclear Dec. Feb.

Hanford, Washington vaste handling equip, 1979 1930 Sept. Dec.

1979 1979 Lambert, McGill and QC Engineer & NDE Provided first line VT & NDE for Thomas Inspector Level II pipe and structural fab.

San Jose, California oversaw velder and velding procedures Qual. Setup QC program.

NIX Testing HDE- Inspector PT, MT, RT Class I equipment

~f 9 Richland, Washington Feb. Jan. Bovee/Crail QC Inspector Welding-Mechanical, structural and Piping.

i 1978 1979 De" cb e UT & PT g X-Ray Inc.

Seattle, Washington NDE Inspector Level II I

Nov. Bostrom. Bergen Lead QC & NDE Scheduled,. oversaw and May 1977 Metal Products Inspector provided documentation of all.

1977 QC inspections, NDE, and Vendor I' Oakland, California i

surveillance activities for this

' company and its subsidaries of class I fabrications..

Dec. May Abbot A. Hanks .,ield r Lead QC Oversaw all field activities 197o, 1977 Testing Company NDE & Civil Oakland, California Inspector Level II -

l l

t- July Dec Chatham Testing Co. Field Lead Level II Oversaw all field activities.

1976' 1976 . Mobile , Alabama NDE, RT,UT, PT,IC

' May Aug. Feabody Testing RT, PT NDE Field Activities

'1976 1976 ,

JO3 n STORY

.v. .., .- . . / ., .. r.. .=. .

- a, ,.

. .. ,3 COMPA:Y/ ADDRESS YOUE :::LZ 3v7:33

\

1 s

l Sept Sept Concord Welding Company Wel der 1973 1975 Concord, California

["I 1y67 97 E3 S.P.&.S. Burlington Switchman a

..crthern Rai2 road Portland, Oregon J a'r Ap;^4 7^ Installed cable trays, structura L l Western Electric Installer 1906 ,907 Las Cruces, IIev Mexico steel, viring, electronic bays ,-

tested equipment, and cut on.lin e, March Dec.

1965 1965 Roy L Houck Const. Co. Laborer Eridge Construction Roseburg, Oregon Sept I.: arch . Aircraft and Missile electrical

_ - US a, r, ,epairman n .

i 1963 1905 repairman, i.

I i

l'

~

i ALAB RESUME ORGANIZATIQ1m@ AD LAST NAME FIRST NAME DATE EM LOYEE NUMBER GILBERT / COMMONWEALTH Laurain William J 2/14/83 5044 SCHOOL f4NE CITY STATE f%)0R DATES' DEG 9/71 HIGH Romeo High Romeo MI to A /*tA 9/74 COLLEGE Michigan Tech. Univ. Houghton MI Civil Engineering to BSCE R /*14 Master in 1/82 OTHER Wayne State University Detroit MI Business Admin. to 17 /A?

OWER MOITH/ YEAR C01)ANY/ ADDRESS YOUR TITLE DUTIES FROi TO Associate 2/83 PRES. Gilbert / Commonwealth Quality Quality Control Inspector Soils Jackson MI Engineer and Underpinning Areas 5/79 2/83 Cunningham-Limp Engin. Civil /Struc- Structural Design - Steel Framing, 1400 N. Woodward tural Engin- Concrete Design - Foundations, Caissons, Birmingham, MI eer Slab on Grade, Retaining Wall Facility Site Design - Drainage, Pavement 3/76 9/78 Spalding & DeDecker Civil Cooperatvie work - study program while Civil Engineers Engineer attending college. Surveying, Drafting, Madison Hts. MI Inspection, Contract Administration 3/75 9/75 Anderson, Eckstien & Surveyor Survey crews, site layout, grading, Westrick Civil Engin. cut & fill, topographical survey Mt. Clemens, MI co w raroc n'w ')on m w y 5 P E I U C f) h 3

,J FEB 171983 FIELu vsnus t n~uMNJE MIDLAND, MICHIGAN

_ =r  :--  :--- . - --- = _ _ - _ _ : - G=_ _ _ _ _ _ _ _

..___t .

c.? q9i

.;.;.~h ' W '~ n im r.w E un-fr)PQAD _

..-=.-

QC

&:U TA 4. Lam on, ucnare A. 12 m ie2 45

- 55.DU_C.ATION_.

'SDCOL 'NAliE- C.lT_Y STATE- M A'JO R W- T T. $,pg.

East Anchorage High School . Anchorage, AK General 3

[.hS[:)

COLLEGE University of Alaska Anchorage, AK Business 2 None University of Tennessee Knoxville, TN Civil Engineering 1 None OTHER

.DJHER~l.

JO.B msTo'R3'

.COMPARY /.t,pDRF SS YOOR T.1T LF DOT.lE S StoM ro 2/82 11/8; Technical Aid Corp. Contract Field Seis:nic columns, grouting, structur, Raymond Kaiser Engr. Inspector coatings, expansion anchors, con-

'W. H . Zimraer N. P.S. crete procedures, training Level Moscow, OH I and II inspectors, reinforcing

QC Civil / Structural 5/78 1/82 Tennessee Valley Auth.

' Asst. Unit Super Supervision of sll'.QC' Civil in-Phipps Bend Nuc. Plant spectors involved with rebar, Surgionsville, TN Senior Group shops coatings, structural steel,,

QC Civil / Materials Leader concrete, soils, contractor'com-pliance, site pre-QA, pre-NRC audi' s1Le responses Lo vn ano onv auan findings, wrote and revised SOPS and system wide procedures; Super-vision and OJT of 25-30 inspectors 4/73 4/78 Tennessee valley Authority Group Leader Rebar, structural steel, coatings, Watts Bar Nuclear Plant -

cadwelds, project control info.,

Spring City, TN Senior Inspector wrote and revised SOPS, supervisios QA Civil and OJT for 7-10 inspectors 2/71 2/73 U.S. Army Sargent- Sargent U.S. Army-l 82nd Airborne Division Ft. Bragg, NC Acting Platoon .

4/68th Armour Sargent Chaintnn/ Rodman Chainran/ Rodman Survey Party 7/68 1/71 A. J. Leask Construction Heav.y Construction Anchorage,.AK Survey Party Engineering Survey _-

I {

ALAB RESltE CRGAt1IZATIQi LAST f#ME FIRST NAME DATE EFPLOYEE NUMBER v

i MPQAD/QC Lenczewski Melbourne 1/19/83 272435 SCHOOL tW4E CIT / STATE f%JOR DATES' DEG HIGH Garden City High East Garden. City, MI College B/63 6/66 h_

B/66 Assoc COLLEGE Schoolcraft Comm. College Livonia, MI Electronic S/71 Deg.

1/78 Lic-OTHER City of Westland Westland, MI Master Electrician 12/82 ense OTHER MQlTH/ YEAR

- COPN#/ ADDRESS YOUR TITLE DUTIES r RQ4 TO City of Westland To inspect new and old work on comm.

~

5/77 5/82 Westland, MI 48185 Electrical indust. and res. Also review of Inspector pla'ns.

State of Michigan , To install and repair highway light-3/73 5/77 Highway Department Electronic ing system. To build and test high-Southfield and Detroit, ,

Tech. and way sensing equipment to review plans.

MI Electricial l

Testek Inc. Build test stands - wiring and test-5/72 3/73 Globe Ave., Livonia, MI Electricial ing.

Solar Eng. Inc. Worked at Enrico Fermi I for 3 months 11/71 5/72 Detroit, MI Electronic ~ Core Removal. And at Ford Research Tech. Building Test Equipment.

Burger Chef Repaired Restaurant Equipment.

7/71 11/71 Indianapolis, IND Service Repairman

. s.

J0s HISTORY I.oaau/ YEAR l YOUR TITLE DUTIES

  • COAPNN/ ADDRESS IFR04 I TO I i t i l  ! Ward Foods Repaired and installed Equip.

l4/68 7/71 I Detroit, MI Electrician f used in making bread.

9

=*

4

  • * * * * * * * *e= *.e o e , aw.+. ,,e. . . . , , , , , , , , ,

" " ' ~ -

{

ALAB RESUME ORGANIZATIG1 LAST NAME FIRST NAME DATE EMPLOYEE NUMBER Gilbert / Commonwealth ,

i Consumers Power F)N)AC Lytle William 12/22/82 5387 i

SCHOOL NAME CITY STATE t%JOR DATES DEG 9/70-l HIGH Allen Park High Allen Park, MI College Prep. 5/73 9/ /3-COLLEGE Michigan State University East Lansing, MI Civil Engineering 6/77 B.S .

OTHER OWER MOITH/ YEAR COPANY/ ADDRESS YOUR TITLE DUTIES FRai TO Gilbert / Commonwealth Disposition of nonconformance reports 10/83 12/82 Field Assignment at Office for elect. cable tray and supports.

Marble Hill Nuclear Engineer Plant, New Wash., IND Gilbert / Commonwealth Resolution of Field Construction pro-5/80 10/82 Field Assignment at Field blems in order to maintain design con-WPPSS Hanford #2 Nuclear Engineer trol per QA procedures.

Plant, Richland, WA 11/79 5/80 Gilbert / Commonwealth Design & Inspection of pipe supports Field Assignment at Design per NRC Bulletins 79-02 & 79-14.

Fort Calhoun Nuclear Engineer Plant, Omaha, NEB l

Gilbert / Commonwealth Inspection of concrete expansion 9/79 11/79 Field Assignment at Field anchors for piping systems per l

l Three Mile Island #1 Engineer -

NRC Bulletin 79-D2.

Nuclear Plant, Harrisburq ,

I Gilbert / Commonwealth Design of structural steel & concrete 9/77 9/79 Jackson Office, Assoc. Struc. for CPCO James Campbell Unit #3 Jackson, MI Engineer Fossil Fuel Power Plant.

,i, I

. /Agen;ggoft ;

j CR3A'GZATICN MPGAD LAST NAME FIRST iWE IATE  :#PLOYEE fff: ER Comsumers Power MacPhee, Scott 3/7/83 CPCo-OST-625 l

MPQAD -

' SCHOOL tWE CITY STATE FWOR SUES , DEG .

~

Hute ins n Central Tech. BuHalo, % Mechanical Tech. 1966 HIGH , , ,

. 1970 g Erie Community College f.'. - Amherst, NY.

' . Highway DesignC 1970 No.

COL!.EGE - '

(Civil) a , Materials Analysis.

- . ' . . .-. .}. ; Albany, NY,-

l

\

OTH2 , E in! %. atioE.t*

~ ~ -Condrste' Testing ' - -

l . :s. ~

- n. 4'y :- ...--

' _ }. l- ..

...- y: j __. .. - '-

7- Y g -

[

l g ygg .,, .- .

TO CTPANY/ ADDRESS 'YOUR TITLE D.rGES i

FRCM 9/80 1/83 Leonard S. Wegman Co. Assigned to Scojaguoda Tunnel Inter-Construction ceptor Porjec t Operations surveillance Buffalo' NY Inspector of mining and blasting reinforcing and f concrete pours. Station const, operations architectural, piping, electrical & HV ,

10/79 9/80 McNamee, Porter & Seeley North Tonowanda, NY Assigned to new construction of North Construction Inspector Tonowando', NY waste water treatment plant Operations covered ^ concrete pours,

, process piping, and finishes, Inspector og l

1 500' dirt tunnel under roadway & Jacked if P Aace m r .

3/77 10/77 McPhee, Smith & Rosenstein Field Techni- Responsible for the installation of weirs, Buffalo, NY

  • cian fl'umes & flot/ meters in sewer systems in Erie County NY. Monitoring said equip.

i and compiling data for evaluation studies, S/74 5/76 U.S Army Corp. of Engineers Operation of transits, sextant's, levels Surveyor Buffalo, NY & EDM eugip. Performed surveys in Buffalo l

District Harbdrs ,to determine shipping l channels & Dredging quantities. Surveyed 5@hi@Aihipand, Erie,St. Lawrence &

7/71 7/73 New York State Dept. of Construction l 7/70 7/71 Transporation em Assigned as an Engineering Tech. and ,

j Buffalo, NY Construction Ins'pector ,on NY State Hightvag projects, Operations, paving, excavation i ~

Surveyor bridge rehab & Landscaping. Also assigned as instrument man on traverse survey.

1

. o .,

,- ALAB RESUME i LAST f#ME FIRST NAME DATE EW LOYEE NUMBER lCRGANIZATION

, CPCo / MPG A 0 Moran James 12/14/82 CPCo-GC-9

~

I SCHOOL NAME CITY STATE f%JOR lIWTES l DEG W.6 HIGH Albertus. Magnus H.S. Bardonia, N.Y. Academic 6/71 OlbEEE Manhattan College Bronx, N.Y. Civil Engineering S/75 B.C.E ,

N Eastern Michigan University Ypsilanti, MI Business Admin; / 12/82 M.B.A .

OTHER M7(TH/ YEAR C&PANY/ ADDRESS YOUR TITLE Dlf71ES FRQ4 TO 7/79 Gilbert Commonwealth Structural Lead Engineer responsible for structural 209 E. Washington Ave. Engineer engineering, design, and preparation of

~

Jackson, MI 49201 const:ruction documents for industrial and commercial pro]ects. Also performed con-struction inspection of structural steel Io0E3$%?6n"8SEsNEcEl*E7"I" pili'8Elhing"'

12/78 7/79 Gilbert Commonwealth Senior Assoc. Structural engineer responsible for en-209 E. Wash'ington Ave. ineerin Structural {lsoperfo&designofIndustrialprojects.

rmed construction inspection of Jackson, MI'49201

  • Engineer structural steel ereption concrete place-ment

& piledemittion, driving. foundation construction, l 6/77 12/78 Gilbert Commonwealth Assoc.

i 209 E. Washington Ave. Structural St:ructyralen!sEeerresponsibleforkn-

&d i

gn aspects of the Er e Jackson, MI 49201 Engineer gineeringlant;workedonseveralPSJpt Nuclear sections site solis &. assisted work. in some preliminary i

l 6/75 6/77 Gibbs & Hill Inc. Assistant Structural engineer responsible for en-393 Seventh Ave. Structural gineering & design aspects of the Commanche New York, N.Y. 10001 Engineer Peak Nuclear Plant, Argra Unit I Nuclear Plant, & Fort Calhoun Unit II Nuclear Plantc i

i 9

u- - #

. P.

O JosHISTORY I!Ry4TH/ YEAR l CCf?ANY/ ADDRESS YOUR TITLE DUTIES

  • i;RrJ4 I TO I i i !

j'  !

1 t

/

4 .

m A

i f

(

I

,_m- .y-. _-e. .. , . - - - . - _ _ _ ,

[ -

A'.AE PIStfG i OE3; GZATION LAST NA'E FIRST rW.: DAsc  :!?LOYEE tusER I

MPQAD - Soils McMaster Joseph 2-19-83 CPCo-GC-267 SCHOOL l TWE CITY STATE f%)OR lDWcS , DEG l

Bentley H.S. Livonia, MI N/A' HIGH 1970

'm M

COLLEGE University of Michigan Ann Arbor MI Civil Engineering 1976 B.S.

OTHER .

OTHER -

MCtGH/YcA CTPANY/ ADDRESS 'YOUR TITLE DUTIES Frui TO Civil / structural engineering e,ncompas-1/79 1/83 Gilbert / Commonwealth Senior Civil /

sing planning, scheduling, construction 209 E. Washington Ave. Structural ** " ^" .inspe tion; design and de-k Jackson,MI Engineer 8

  • 1#8 "I "" " # # **""

ufacturer drawing and specification verification for industrial and commer -

clal buildings and nuclear and toss 11 fueled power plant construction and

. retrofit projects.

Layout, design and design review, draw-6/76 1/79 Gilbert / Commonwealth Associate in,g and specification review and ver-209 E. Washington Ave Structural ification; planning 3nd sheeduling of Jackson, MI Engineer design activities; and construction 2

liaison on various power plant retro-fie and enn ernceinn orniecte.

. Layout , inspectiion and construction 6/72 9/73 Townsend/Bottum Assistant activities on (ossil fueled power plant Ann Arbor, MI Field construction site, Engineer 4

- , - - , , - - , - n

iikil "[

AMB RESUE d(M '

/.

ORGANIZATION LAST fWE FIRST NAME DATE ElPLOYEE NWBER MPQAD Nastiuk William D 2/9/83 CPCO-LTS-217 4

SCHOOL fME CITY STATE f%)0R DATES DEG Roosevelt Highschocl Port Angeles, WA General HIGH COU EGE 1

- l 1

- YOUR TITLE DUNES ppm COPANY/AIERESS 70 6/82 10/82 Commonwealth / Lord QC Responsible for all QC inspection and PO Bax 189 Manager acceptance activities at Marble Hill New Washington, IN 47162 Level III Nuclear Generating Plant 10/81 6/82 Foley/Wismer Becker QC Supervised QC Field Inspectors for WNP-1 -

Superdsor all safety related installation .of Richland, WA 99352 Level II electrical contractor work. WNP-1 6/81 10/81 Washington Public SR Construct- Responsible for system acceptance l

Power Supply System ion Engineer Quality requirements and documenta-

! 3000 George Washington Way t' ion review. WNP-2 Richland, WA 99352 l

1 9/80 6/81 Burns & Roe, Inc. Sr Construct- Construction Quality Engineer for WNP-2 ion Engineer Contractor Compliance to procedures

( .

directives, drawing an regulation by Richland, WA 99352 -

electrical contractor. WNP-2 l 9/79 9/80 Bechtel Power Sr QC Elec QC lead engineer supervising QC 50 Beale St. Engineer inspectors fnr inspection, acceptance San Francisco, California Level II and documentation of all safety re -

lated electrical installations at Limerick, PA. Units 2 & 3.

1 1

~

Jm HISTmy

COPANY/ ADDRESS YOUR TITI.E DUTIES
  • FRm - TO

'Bechtel Power Sr QC Elec. Lead (Asst) Engineer, 10/78 9/79 50 Beale Street Engineer supervising QC inspectors in the San Francisco, CA Level II inspection, acceptance & documenta-tion for all safety related elec.

, installations - Salem 1&2 N.J.

~

1/75 10/78 Bechtel Power Sr QC Engineer Elec. Lead Eng. for all safety re-50 Beale Street & lated elec. iristallation inspec-San Francisco, CA PQCE tions, acceptance & documentation FFTF Richland, WA 5/74 1/75 Bechtel Power Sr QC Engineer Home office QC Eng. Writing in-50 Beale Street spection plans for safety related San Francisco, CA installations at various nuclear generating plants.

5/72 5/T4 Bechtel Pov'er- Sr QC Engineer Elec. Lead Engineer supervising 50'Beale Street elec. inspectors in the inspec-San Francisco, CA tion, acceptance and documenta-

'?#'

tion for all safety related work.

Peach Botton 1&2 PA 7/67 5/72 State of California Electrical Supervised electrical inspection Dept. of Water Resource. Construction of entire electrical installations Sacramento, CA Supervisor I at Oroville Dam & OSO Pumping Plant. State of California water Project.

g

(

,, l2; [ ' s, .

s.;

e 4

~

L -- --._

  • . AIAS PISLfE r  ?

8 CR3A*GZATICN LAST NAME FIRST iMME DLc 9PLOYEE ffFd R I

  • MPQAD SOILS PAIGE, DAVID 3/11/83 CPCo-UST-624 i

' SCHOOL NA'E CITY STATE t%JOR A Tc5 DEG !

T.L. Handy High School Bay City, MI 71-73 E*CCT Coll'ege prep HIGH Bay City Western High - Auburn, MI 73-75 i

. Delta College Ffy i MF . University Center Bay City, MI Math / Chemistry <; S/75. '

. u 12/76

ColuNd' Basin-College?b), Pasco,nWashington_ 9/79-Nondestructih" OTHUt . ;3r gt -e-- ."; - " ' ' ' '

examinatierie:F S/80"  % c.

Pr ' .~ b g~ . p. 4 g p g j j t. Intermediatel,Yggg 0-OTHER iqPriv

,'a@ytutor ~

~

Bent 6n ' city;*Wi:shington UltrasonicExhin. 38 A,,-

l McInH/ YEAR  % -

'. 2- -

COPANY/ ADDRESS 'YOUR TITLE W HES FRCM TO 1/81 2/83 Morrihon Knudson Co. Inc. QC Inspector Perform major reinspection and, follow up audits on RAB structural steel hardware Washington Public Power Civil /Struct.

and quality documentation. Responsible Supply System for. tracking and maintenance of structur-Nuclear Units 3 & 5 al rework documents. Maintain point to Elma, Washington ph ede WW mh hp :

tion and surveillance of metal fab shop activities. Review fabrication and de-sign drawings for compliance to applic-able codes, standards"and procedures. .

! . Surveillance of daily erection and cal-l ibrations. Review and submit quality structural and welding documentation for placement packages. Initiate and main-l tdin QA stru6tural steel turnover fil- ^

L ing system _. Perforin turnover activities.

l i Weld filler material control and weld inspection to AWS D1.1. Liquid penetrant examination to SNT-TC-1A. Qualify and perform daily sur'veillance on cadweld splice operators. Documentation of splice 6 and production tests. Monitor and doc-ument concrete cure temperatures. Sup-e-vine ned trnin level I cersonnel.

5/78 1/81 Pacific Testing Laboratory Civil QC Perform and document specific gradations Washington Public Power Inspector and sieve analysis of concrete aggragates Supply System and soils. Maximum density wet and d.ry'.,

Nuclear Units 1,2 and 4 vibrating table method. Plot,and inte'- r pret logrithmic density curves. Field sampling and testing with balloon meth-od for in. place density of cohesionless soils. Batch plant representative re-sponsible for calculating water cement

~~

~

JosHIsToRY EI DN C09ANY/ ADDRESS YOUR TITLE DUTIES

  • i 0t l TO l l 1 Monitor lab cure cylinders temps.

Pa f Tetsing Laboratry Compressive strength of concrete cy-3 .l (continued) linders, grout, dry pack, and epoxy 1 / cubes. Tensile strength of rebar, cad-welds an,d all thread tie backs. Per-

  • Form creliminary mix desien batch cal-I -

culations and evaluations. Perf.orm qualification tests for various sinch anchoring devices used on si,te. Assign "J. . , work to lab personnel. Supervise and

"'.'.'.~'

.' , .E .c . . train level I personnel. Visual.inspecc

~T7' "I' '

tion and documentation of structural c; sp;. s . steel and high strength bolted.connec-

'." - tions in all class I & G structures.

Daily calibration of V

forave whenc'hea.'

Ql '

2 .

ci-[ ..

x

-. g 2--" a Prepare and submit reports for engineer

~

-- evaluation.

Visual Inspectionor diecast alloy com-12/76 5/78 Walbro Corporation QC Inspector aonents for overall conformance. Trim Midland Rd and/or machine to meet customer requiree Auburn, MI nents. Dye penetrant for heat' shrinks and stress cracks. Hydrostatic and t air oressure testing of component cham--

E~ bers for defects. Package and prepare Jarts for shipping. ,

5/76 10/76 United States Testing Cc . Civil QC Inspector Sampling and testing of incoming agg-l Consumers Power Co. regate and portland cement, for user Midland Nuclear Units acceptability. Batch plant-inspection 1&2 of scale zeros against batch tickets,

( -

determine test loads and take daily l

aggregate moisture samples. rectorm l . slump, air, cylinder tests in field.

Sieve analysis and gradations of agg-l regate. Nuclear densometer and sand l cone methods of in place density.

Plastic and liquid limits of clay soil hydrometer particle size analysis, pro' l cter' test and curve plotting to deter-

~

mine' max density / moisture content.

l Tensile strength and radius bending of l

' rebar. Cadweld splice tensile strengtD

, Comoressive streneth of concrete and grout cylinders. Vibrating table methe od for maximum wet and dry densities.

i Testing of cylinder capping compound for combustibles.

l

_ _ _ _J

( ".

ALG PESifE I CR3*:UZATICN mPGAo LAST NAME FIRST fME DATE EFPLOYEE fu sER I 21633 g Townsend & Bottom POREDSKI, JOHN 3/10/83 fME SCHOOL CITY STA'lE f%JCR l DATES, DEG HIGH Allegan High School Allegan,. Michigan 6/72 W .

e Lake Supe, e rior Stat.e Coll _e,'ge ' Sault Ste Marie, MI Biology .

,.f . ~ 9/72,

." -a 3/73_-

.;.;;-* - +. 4  ;  :, - - .

.,c $k. ; 3/73,:

Mi higangtate Univ,eristhm. ;.t.Eastg. ,nsing f; mig., - Soil Scien..r l3,B,S ,

OTHER -

,w: .-Q p , . 3 . 77. . ,='

q <.  : : .c 4%s.t. t... .:. , , w.

aB.&. a ~ .. t3 1.~. .. i &..: 1.TQ * ' 'n. -m.+4m . -.m Ma.. , . . .

,jx: '
t ;

g395g -: 1py

?+ .x glt;;

y.  ::

.yp. . . .

T1 ...~

+ .a -

s -

s em a . e- .:. ,,,-,,..-4. * ,

TO CCPPANY/ ADDRESS 'YOUR TITLE NUES FRCM 4/81 Now Town' send & Bottom, Inc Quality Inspector for electrical, Ci 11-State Street Control structural and remedial soils, Ann Arbor, Michigan Inspector . inspections included welding, anchor bolts and structural steel erection.

1 6/79 4/81 SAME AS ABOVE Field Engineer Field Engineer duties for both Civil t

and piping disciplines. Civil duties included Layout & Survey, conc.

calculations, check of rebar configura-tions. oicina duties -final walkdown of hangers, hanger redesign and as buil of piping system 5/78 5/79 FED. Crop. Ins. Corp. Field Insurance U.S.D'.A. ' Underwriter Evaluate Land for crop production for St. Paul , Minnesota productivity, risk & factors.

5/77 5/78 Allegan Water Plant Plant operator operate 3MGD lime softening water Allegan, Michigan discharge plant maintenance of pipes, valves &

water tester pumps and addition of chemicals to water

& chemically testing water supply. Test water daily for compliance to state standards and codes.

7)

I i

l I

o. ALAS Pistft.

i CR2t.l:;ZATICN UST tame FIRSTtR* DLc  :!?LOYEE trrdR MPQAD - Soils PRETTYMAN, MICHEL ,3/9/83 CPCO-PDS-622 2 SCd00L ta'E CITY STATE  !%)CR lDATEShDEG.

Casa Grande Union Casa Grande, Arizona College prep. j g 4 e

M,,, University of Arizona Tucson, Arizona. Engineering 64-65' none 65-66 none' Northern Arizona University Flagstaff, Arizonc Computer Science

-:- North Idaho College ICoeur D'Alene,. Idaho Engineering 69-70, none aWestern 3 sh. State Univ..[ -Bellingham .. Washington ~ IndQstrial. Design 70-71 none -

'*4 "

' Columbia Badin Col 1ege -

Wasco,- Washingteh . Mid-Manageme'nt -

81-82 non'e OTHE . . .

I .M-C09ANY/AM.SS YOUR TITUE DUTIES FRCM TO

Class "G augmented" contract (INFPSS) 1/82 5/82 National Fail-Safe Productiori Wrote, coordinated, trained " work pro-l Garden Grove, Calif. Planning cedures" for field engineering t'o inspect Richland, Washington Supervisor to including structural welding (7018, 6010,6011 & stud welding and power activ-ated studs)- established management flow .

/ feedback procedure including engineering and document control. Established documeni

. tracking system via micro computer.

Performed document verification for turnover.

9/81 1/82 Cosco Fire Protection Sys- Field Engr./ Class"G augmented" contract. (WPPSS) tems, Inc. .

Safety Engr. Coordinated and trained craft and field Richland, Washington engineers to quality requirements and

" work procedures" - established construc-tion site safety program- wrote, trained and audited safety prcgram. inspect,ec

. large and small b' ore piping for fit-up, welds, structunal supports and config-

. urations. Created engineering actio requests when needed. Established man-agement flow / feedback system.

Class I (WPPSS). Inspected HVA.C duct for 7/81 9/81 University Nuclear Systems QC II configuration as per plans and fabrication Inc.

. travelers, and we,lding as per AWS D1.3,.atid Richland, Washington . - '-

contract specs and. procedures..

D

J:s HISTORY

" ~ '-" l

".:..._~ . . . -

CO? A.','Y/A".D:.ESS YO'S, TITLE DLTIES. <

i:y.-. i ,

!  !  ! Inspected duct work structural supports j j University Nuclear QC II for configuration, placement and weld-l Systems, Inc. ing according to AWS D1.1. Inspect-(continued) ./ ed engineering as-built drawings for l l accuracy, weld rod control (issue, l l

!- 1 I - ovens and stubs), pre-heat and p,ost-heat for structural welding. D'oc-umented all findings.

11/80 7/81 G.A. Grant, Inc. QA/QC Level II Class I (WPPSS). Inspected: forms Richland,-Washington condition and placement, erection of forms, reban, structural and miscellan-

. eous steel, materials at receiving station. Inspected: soils excavation and fill including stock piles and com-

~_

paction; location and installation of imbeds (plates, sleeves, conduit, plumbc ing, ground cable); concrete (testing, placement, curing, finishing); structurc al steel placement and welding as per AWS D1.1 and specs; weld rod control (issue, ovens, stubs). Overinspected

- suppliers, subcontractors & test lab.

Assured: complete and accurate doc-l umentation in pour packages, test re-l

! sults from lab, subcontractor document-ation, certs and documentation from suppliers.

lass ( . erformed field and 4/80 10/80 Pacific Testing Lab QC '- ASME I laboratory analysis of site construc-Richland, Wsahington ANSI I tion materials. Specifically: soils l

compaction and moisture density tests; concrete consistency slump', entrained

- 24r- aaet-native t99 tine for strength of materials (concrete cylinder, dry pack cubes, rebar, unistrut cadwelds);

insp'cted e batch plant for mix. conform-ation (aggregate size, moisture, per-

~

cent composition, ad mixtures, time of mix, condition of trucks); analysis,of aggregate and soils via sieye analys'i's.

h 1

JosHISTORY

" N/ W' !

YOUR TITLE DUTIES

  • C0cANY/ ADDRESS IWt l TO I i t i Commercial and residential project.

Designe d e 4/78 4/80 ; Clark Nk Constmedon, Performed soils examination to meet j i Missoula, nc.

I design criteria. Inspected: excava-t Montana / tion, fill and compaction of soil;re-Interface Inc. bar siz,e and placement; form work

. Sandpoint, Idaho M nna-ant and confiruration, concrete

'I -

mix and placement - inspected for con-formance to plans and design. Doc-

.- umented projects for compliance to ~

unifoim building codes and local ~ codes

p%.

.;; . . . +

.q .. a .v -

,, and ordinances. s --g ,

, , , ,u~- = - ,, c y -. . .>.a . szn,. . w . .4 10/77 4/78 Field Engineer Hydro project -Noxon'R'apids Dam.

"*-- EBASED Nekitbrk, NYServices Y:

Inc @N - -'

Performed detaile#d analysis'of't'hs .cr-

~

T ' . '-

~ ious contractors designs, integrated al:

contractor plans into drawings desig-

.:. nated by " lift" elevation. All in-spections were performed to these draw-ings. Walked down spiral case, piping, electrical and checked elevation., In-spected rebar placement, small and large bore piping for placement and certifications. Inspected conduit and F- sleeves for placement - inspected ag-gregate and processes of batch plant

- - performed slump and air tests of

~

concrete - inspected placement of con-crete. Reviewed radiographic film l

exoosed by NDE contractor.

75 76 Self Designer / Draftsman Misc. Architectural drafting l

Performed estimating and scheduling 10/74 3/75 Pacific Engineering Engineering aide necessary to create and maintain the Construction Services, CPM / PERT network to provide various Inc. schedules and summary reports to status Anchorage, Alaska various commercial (heavy). projects.

l Designed and drafted all plana, de-5/73 6/74 Celestial Homes, Inc. . Senior designer tails and shop drawings for manufacturc Cheweuah, Washington ing jrocess - extensive use of all umiform building codes - inspected and documented all processes for Washington State Inspection Agency.

Designed and' drafted, all plans and 'de-

'4/72 2/73 Palm Parke Development Senior designer tails for 840 acre planned area devel-Casa Grande, Arizona opment - inspected: excavation, rebar placement, concrete consistency and placement. Inspected structure for 1n=

tegrity and adherence to plans - doc-

E3HiSTC?.Y

' ~ *~^ l COcA.'"dG:.ESS YO'S. TITLE DUTIES <

i :2. . Tc i 1  ! I' *"* " 88- " *" "E8 * *-

Palm Parke Development tivities for compliance to applicable j j ( continued) codes and stardards. .

I *

./

l I I -

?- 1 I

5/69 11/69 U.3 Forest Service Party phief Supervised operation of testing' lab

. Sandpoint, Idaho and spread crew - tested: aggregate from batch plant, performed sieve an-alysis of soils and aggregate, moist-ure density. Inspected materials stockniled. scread and compaction.

Verified grade via surve .

2/67 4/69 ' !I.S. Navy / IBM Data Proc. Tech. Submarine Squadron 14. Performed all Scotland, U.K. Field Engr. testing and inspection of electr.onic equipment for accuracy and quality -

approximately 20 different pieces l of equipment used - multimeter, os-h cilliscope, strobascope and other miscellaneous test equipmant. Main-

. tined all records of equipment in sec2 urity locations.

l l

l l

l

o.

Al.AE REStf5 lCR3R':ZATIC4 LAST iM'4E FIRST fWE DO-i - LOYEE TU EER

) MPQAD - Soils REAGAN JAMES 3-1-83 CPCo-GC-185 I

SCHOOL l tR'E l CITt STATE t%)OR l DATESi DEG]

H ly Family H.S. Massena, NY Col'lege Prep 61 -

HIGH 64 y COf I :t:E Clarkson College Potsdam, NY Civil Engineering ' 4 * *

-6/68 C.E.

g Clarkson College Potsdam,-NY- C1,vil Engineering 6 .E.E .

OTre t434TH/ YEAR '

FR04 COPANY/ ADDRESS 'YOUR TITLE IUTIES TO Performed soils investigations, baseline 1 1 / 73 3/83 Gilbert / Commonwealth Civil / Environ- studies of hydrology and water quality, 209 E. Washington Ave. mental Engineei field inspection at power plants Jackson, MI 49201

  • l 1 / 73 1 0 / 73 U.S. D.O l., Environmental Audit & inpection of prime contractor Knolls Laboratory
  • Engineer activities in the areas of water quality, Schenectady, NY air quality, solid waste, and nuclear safety.

Support duties including maintaining 9/71 9/72 Clarkson College .

Graduate and repairing equipment; ordering supplies Civil Engineering Dept. Assistant Setting up laboratory experiments in Potsdam. NY an Environmental Engineering Laboratory.

New York State Power Auth- Concrete work, excavation, compaction, Construction eline construction, 4/ 71 8/ 71 aborer carpentry, sand Mastingpip'and, insulating.

B art Island ,_

Massena, NY 10/68 10/70 U.S. Army Field Artillery P.T.S. Computer program test station 7th Army Operator operator for a Pershing Misslie Unit Federal Republic of Germar y E-5 -

I i

t .

/

~ ~

JO3 HISTC2.Y

""' l YO'S, TITLE C09NW/A330.ESS DUTIES <

i:: P l To i

! I i7/68 9/68 l Stearns & Wheeler Field Engineering Field Inspection of sanitary sewer l* I Consul' ting Engineers In spec tor lines under construction in- the Main Street i village of Seneca Falls, NY -

l Cazenovia, NY l

St.' Lawrence Seaway Field - In-place monitoring of the struc- '

Development Corp. Inspector tural stability and safety of an operati:

6f67 8/67 Seaway Circle ing navigational lock on the St. Law-Massena, NY rence Seaway b

o C

~

w

l .

Al.AB RESWE ORGANIZATIm fr)poao LAST NAME FIRST NAME DATE EMPLOYEE NWBER GILBERT /COMPONWEALTH Snyder Kenneth 3/7/83 8189 <

i SCHOOL NAME CITY STATE MMOR DATES DEG 3/61 CONRAD WEISAR AREA H.S. Robesonia PA ,

3 67 3/67 CnffFAF UN'IVERSITY OF PITTSBURGH Pittsburgh PA Civil Engineering to. B.S.

4/71 9/75 M UNIVERSITY OF PITTSBURGH Pittsburgh PA Soils & Foundation to None Engineering 3/77

- x.AR cOPANY/ ADDRESS YOUR TITLE DUTIES FRm TO-6/78 3/83 GILBERT / COMMONWEALTH Resident Resident geotechnical Engineer'at Perry READING, PA Geotechnical Nuclear Power Plant .

Engineer  ; ,

4/78 5/78 GILBERT / COMMONWEALTH Engineer Worked.in design on soils engineering READING , PA - .

items.

10/77 3/78 GILBERT / COMMONWEALTH Engineer Worked in Planning & Seneduling READING, PA -

2/72 3/75 U.S. Army PVT TO 1 LT Air defense officer (after going thru basic training & OC 5) s

ALAS PISLME

( *

{ (

LAST NAME FIRST fM E DATE E!?LoyEE ;U r R l CR3A*::ZATION MPQAD/BECHTEL ,

l Quality Control Stama, Theodore 2/23/83 272857 i

SCHOOL j tWE CITY STATE t@JOR '

l DATES, DEG HIGH Bridgmen High School Bridman, Michigan General M Gm -

COf ' CAE Lake Michigan College Benton Harbor, Michigan Liberal Arts 1973 ~ AA g ' West 5rn Michigan Universit y. Kalamazoo, Michigan' Education and ,

Social Scien*c' s "

~

1975 BS MOG4/ YEAR COPANY/ ADDRESS YCUR TITLE DUTIES FRO 4 ; TO nderpinning Inspections of Underpinning 1/83 pres. Bechtel Power Corp.

a y era ns AAPD/7220/ Midland Control g ,

Engineer 9/82 1/83 Bechtel Corp. Quality 10-13-82 Certified CW1.00 Welding & NDE (balance of -plant) . Control Enginee r of "o" listed items 11-16-82 Certified C 5+0 installation I . of shear connectors l

(

C/S Inspector Reporting of discripancies major and 3/81 3/82 Baldwin Associates dnor, Approved vendor h awings and P.O. Box 306 ,

endo {

""* 1 * " * # "*E* " "*"""

l Clinton, IL 61727 l Engineer l

l l Clifton Nuclear Power Training coordi nator Established a generic Training l Plant Clifton Nuclea2 program for quality control (217) 937-1111 Plant ,

personnel. , Certified Inspectors to ANSI N45.2.6

  • * "8
  • C ""

9/78 1/79 Installed security cameras, Running S hamburg, IL D.C. Cook 9/79 12/79 conduit, pulling cable core drilling.

Nuclear Power ,'

Plant -

Brigman,MI l

(

( JahHISTO?.Y

','"' "'/y-,~,' " ' l CO on'Y/G:,ESS YO'S, TITLE DUTIES <

3. . To i
e g l 7/71i 5/72i J.L. Manta Inc. Painter D.C. Cook Sand Blasting, priming and finishing l l* S. Chicago Avenue. Nuclear Plant coating of walls, floors, ceilings Chicago, IL Bridgman, MI of the aux and cont. color coded j 9/75 3/80 #

electrical safety related conduit,

  • and tray.

~

.., a a a a a Surf &ce preparation, of weldmants prior to applying muclear coatings porosity and undercut.

l' Reorganized the' shipping and 5/72' 6/73 Mo b-Line Industries '

Inspector and r e v ng epar men . nspection Shepherd castings Documentation f in ming and utgoing products St. Joseph, MI ' Coo'rdinator Commercial and residential painting 1/78 pres.

Ted Stama Painting Owner and . . .

reading blueprints, hiring' employees 7377 Red Arrow operated currently Bidding Jobs.

Stevensville, MI by father .

4 Resis tration :

State of Michigan Contractors P'ainting License # 58723 O

e G

Q

ALAB RESUME i

CRGAt1IZATION 1.AST NAME FIRST t # E DATE EMFLOYEE NUEER CPCo/p)pOAD Swartz, Steven 1/4/83 CPCo-613

!SCHCOL! t!N4E CITY STATE iAAJCR DATES lDEGl L, c.d

- l HIGH Addison Addison, Michigan 6 78 9/80 COLLEGE Michigan Tech. University Houghton, Michigan Mechi Engineering 11/82 BS 9/78 OTHER Jackson Community College Jackson, Michigan Pre-Engineering .

7/80 AS OTHER MGiTH/ YEAR COPANY/ ADDRESS YOUR TITLE DUTIES FR&1 TO 6/82 9/82 Oldsmobile Eng. Intern Obtain handsom experience with Ind. Eng.

Lansing, Michigan Standards Dept. Worked on Budgeted Man Power 6/81 9/81 Oldsmobile Summer Intern obtain hands-on experience with all skille Lansing, Michigan ed trades Depts.

l 7/74 9/80 Acker and Smith Farms Farmhand Worked on all jobs concerning a dairy

farm. Herdsman, field operator and construction duties.

I W . Al>B RESUtdE ORGANIZATION MPGAD LAST NNiE FIRST NAME DATE EMPLOYEE i; UMBER Quality Control Taylor Mark 12/10/82 691079_

SCHOOL l NN4E CITY STATE MAJCR l DATES l DEG l g;. ;4 HIGH Marshall High School Marshall, Texas 4 N~

COLLEGE Univ of Houston Houston, Texas Civil Engineering 5 12 9 Drafting &

g Texas Southern Univ. Houston, Texas Design Technology 2

l OTHER M01TH/ YEAR COPANY/ ADDRESS YOUR TITLE DUTIES FRCM TO May pre- Bechtel Petroleum Inc. Civil /Struct. Site developement, underground piping 1980 sent 5400 Westheimer Engineer design, steel & concrete structural Houston, TX 77056 design, foundation design and computer ,

applications.

7/T9 ~ 5/80 Dannenbaum Eng. Corp. Civil Civil Engineering Design, prepared cost 4543 S. Post Oak Place Engineer estimates & construction specifications.

Houston, TX 77027 4/78 7/79 Bernard Johnson, Inc. Civil Civil Engineering Design, cost 5050 Westheimer Engineering estimates and computer applications.

Houston, TX 77056 Designer l

l t

2/77 4/T8 Turner, Collie & Braden Inc . Civil Civil Engineering Desgin for municipal 5757 Woodway Engineering utility districts.

Houston, TX 77056 Technician I

8/76 2/77 Dannenbaum Engr. Corp. Civil Prepared construction drawings for

, 4543 S. Post Oak Place Draftsman municipal utiltiy districts and l Houston, TX 77027 sewage treatment plants.

1

s

./ .

J0sHISTORY NONE/ YEAR C01PANY/ ADDRESS YOUR TITE DUTIES FR04 TO Civil Prepared Construction drawings 6/74 8/76 Lockwood, Andrews &

Draftsman for municipal utility district New h and public work projects.

1800 St James Place Houston, TX 77056 meturd TaugM courses in WdraCgs, 2/74 6/74 Lenert Hourani & Assoc.

2828 Bammel **#' **18" Houston, TX 77027 enginegring mechanics and stmetural analysis.

O e

l I

l l

l

l r .

ALAS PIStP2 l , (

l ,i C?.GRGIATICN LAST NA'E FIRST iMME DA :  :!?LOYEE fW:ER l IMPQAD Timmons, Kevin J. 2/7/83 CPCO-BS-201

  • l1 i

! SCHOOL tR*E CIT ( STATE l%)0R lDRES ,DEGj HIGH Bellevue Senior High School Bellevue, Ohio 1974 hN mime -

Certified welding Inspecto2 Cert. # 80061521 1980 OM American-welding Society MOUH/ YEAR CCFPANY/ ADDRESS 'YOUR TITLE DUTIES FRCM TO Responsible for In-process and, final 7/82 1/83 Henry J. Kaiser Co. QC Inspector P.O. Box 201 Level II inspection of fabricated pipe supports

.< Moscow, Ohio ,

513-553-2011 NDE -PT Level II 7/81 6/82 Wisner and -Becker Cont. Lead Hanger Responsible for Supervision, Guidence Eng. Fermi II Nuclear, Plant Inspector and training of Level I and Level II Monroe. MI 48161 Inspectors' -

(313) 586-8481 .

1/79 7/81 QC Inspector Responsible for In-Process Inspection Same as Above ,

Level II NDE of pipe welding and . pipe supports, whip PT Level II restraints and instrumentation tubing and supports, Performed PT Exams and i trained Level I personel.

, 8/77 1/79 Chemetron Corporation Welder Operated welding. machine (auto.).

P.O. Box 218 Responsible and accountable for weld Bellevue. OH quality, amount of production repair of (railway Products Div.)

~

machines an pail handling. Performed some manual welding. (smaw.)

8/74 8/77 Same as Above Rail Grinder Prepared welds for NDE (Mag particle) and and performed preliminary NDE on Inspector post-welded rai,1s. (100*/.) Also respo.6, -

sible to perform visual inspection prior to railroad QC Inspector.

- _ . . - . - _ . - _ _ - . . . . ~ _ - _ , -

  • , ALAB RESLNE CRGANIZATION mPGAo LAST NN4E FIRST NAME DATE EFPLOYEE FUiBER l GILBERT / COMMONWEALTH VISSER RUDY P. 12/15/82 9100 SCHOOL NAME CITY STATE t%)CR DATES DEG HOGERE BURGER SCHOOL HBS MEDAN, SUMATRA JULY HIGH -HIGH SCHOOL- NETHERLANDS EAST INDIES 1946 MIDDELBARE TECHNISCHE ROTTERDAM WATER WORKS & READS JUNE BSCE COLLEGE SCHOOL TECH. COLLEGE THE NETHERLANDS CIVIL ENGINEER 1952 OTHER OTHER MONTH / YEAR CCPPANY/ ADDRESS YOUR TITLE DUTIES FRCN TO V.C. SUMMER NUCL. PLANT UNIT #1: WORKED 9/80 1/83 GILBERT / COMMONWEALTH ASSOC SENIOR CIVIL WITH S.C.E.&G.'S G.C. MECH IN ACCEPTING P.O. BOX 1498 ENGINEER VI PIPE ~5UPPORTS, DESIGN OF SUPPORTS, DIS-

'l READING, PA 19603 CONSTRUCTION POSITION OF F.C.R., F.C.M.-N.N.S.R.C.R.'S, DIVISION D.N. ETC. PIPE PENETRATIONS PROGRAM.

EGYPT: CIVIL-STRUCT. ENGINEER ON TURN-5/79 8/80 GILBERT /COMM0NWEALTH ASSOC CIVIL ENGINEZR KEY PROJ. OF 125 MN GAS TURBINE PLANT ~

P.O. BOX 1498 '

V CONSTRUCTION (5 UNIT). SAME ON FOUNDATION FOR 150MW READING, PA 19603 SUPINTENDENT FOSSIL PLANT.

UTILITY CO. FLY ASH DISPOSAL AREAS, 6/72 4/79 GILBERT / COMMONWEALTH ASSOC CIVIL ENGINEER DESIGN SETTLEMENT BASINS, OBTAIN PER,-

P.O. BOX 1498 IV ENVIRONMENT MITS FROM STATE OF PA. ENVIRONM. REG.

READING, PA 19603 DIVISION FOR SAME - DAM DESIGN, RAILROAD DESIGN ETC. SUBSURFACE INVEST. FOR C.E.I. PEERY PL%

2/71 5/72 F.J.T.' DEVELOPERS, DEVELOPMENT CONCEPTIONAL DESIGN OF HIGH RISE APTS.,

FOX PAVILLION ENGINEER ,

OFFICE BUILDINGS,.C.A.T.V. TOWERS JENKINTOWN, PA 11/70 2/71 GILBERT ASSOC., INC, FOUNDATION TOWER FOUNDATION INSPECTION OF SOOKV.

P.O. BOX 1498 ENGINEER POWER MINE READING, PA 19603 CONSTRUCTION DIVISION

  • *eamous.e -e==em.. e emo . e , _ . . . ,,_....-,%..,,,,,,.,oe, , , , , , ,

, 13 Jos HISTORY IN0fCH/ YEAR l DUTIES

  • CCWANY/ ADDRESS YOUR TITLE IAO1 I TO I i i I 10/70lTHE KORMAN CORP. MANAGER, FIELD OPS DEVELOPMENT OF 400 ACRE SITES FOR l7/68 j lJENKINTOWN, PA RESIDENT BUILDING PURPOSES t

I i ALL PHASES OF SOILS & FOUNDATION 10/59 6/68 WOODWARD CLYDE ASSOC. SENIOR FIELD PROJ. INVESTIGATIONS, FROM TEST BORING, PHILADELPHIA ENGINEER SAMPLE LOGGING & IDENT. TO FINAL REPORTS, CAISSON INSPECTION & TC l SOILS LAB. W/25 EMPL. -- IDENTIFY 1/57 8/59 U.S. ARMY FJGINEERS MATERIALS ENGINEER SOURCES FOR AGGREGATES FOR RIGID TRANS EAST DIST. GS 10 & FLEXIBLE PAVEMENTS, FIELD LOAD KARACHI, PAKISTAN CHIEF, FOUND. BRANCI TEST FOR SUBGRADE QUALIFICATION, EVALUATION REPORTS 3/53 12/59 U.S. ARMY ENGINEERS SOILS ENGINEER HEDITTERANEAN DIST. CWS-E NOUASSEUR, MOROCCO

^

3/52 1/53 NEDERLANDSCHE ASS. DRAFTSMAN WORKED IN SOILS INDENTIFICATION OF HEIDE MY (N.H.M.) THE ORONTES RIVER VALLEY, SYRIA ARNHEM, THE NETHERLANDS e

!/53 5/53. RYKS WATER STANT ASS. DRAFTSMAN kTORKED ON FLOOD DAMAGE CONTROL (BUREAU FOR RIVERS & FOR RIVERS 2ANALS) DELFT-THE METHERLANDS 4

4 m

, a e. e e- e e + e- e e

,- .r,. - - .~ .- , , _ , , y--- - i,- - . .---,--y--- - - -mr-, - - -----,-- - , . _ _- ._ - .

ALA3 RESLNE i CRG/J:IZAT101 mpOAo LAST NAME FIRST tWdE DAsc  :.PLOYEE flUM:ER I <

{ Electrical Q.C. Wicker Wayne M. 12/9/82 bb21

~

SCHOOL NAME CITY STATE MAJOR DATES DEG 5/31 HIGH Mid-Carolina Prosperity, S.C. Graduated 76 9/76 COLLEGE USC - Aiken Aiken - S.C. Phys. Ed. 12/76 None Correspondence Comp-OTHER ICS Courses Courses Engineering 1 yr. leted WCSF-N Nuclear 8/27 OTHER Raychem Energy Division Moscow, Ohio Qualified Splices 82 MOnH/ YEAR COPANY/ ADDRESS YOUR TITLE DUTIES FRO 4 TO Inspection of cable pulls, termin-a n, an s, Devcon appli-12/82 11/82 Wm. H. Zimmer Electrical ca s, a s, nsual Nuclear Plant Q.A. & Q.C. nspe n s fo inshenh Unit I Level II ation racks and electr{ical hangers n n y- Aws n1.1. 77 . cnna,,i t- a cAhin trays. Also performed oversee in-spections.over HJK Q.C. - Surveil-lance /co-inspections.

{

Inspection & Doc. of housekeeping, c e, terminations., installation 3/78 12/81 N St Unit I Electrical Jenkinsville, S.C. 29065 of elect. equip., anchor bolts, con-Q.C. Inspector Level II duit & conduit supports, cable trays, elect. noise & fire barries , ring '

- .. x.m. ..~....y. . _ . ~ . .

Virgil C. Summer ,

11/76 3/78 Nuclear Station Unit I Warehouseman e . ing ssdng an @es of Jenkinsville, S.C. 29065 Level I sa M y & non-sa @ y related elect.

equipment under the SCE&G Quality

, Control Program.

1 1

Virgil C. Summer 5/76 8/76 Nuclear Station Unit I Apprentice Installation of conduit and tempor-Jenkinsville, S.C. 29065 Electrician ary power details.

.-...--.-.-...-_n .-.- . . L ,_ . . _

l . . . . . .

OGMMTiott MST Ne.2 nr.sT NAr:S DAR M Ptorn n; b hQbkM A6 I-l6 71 -

.EQLLCATION .

'St+' c L HAaE CIT T STATE M AJO R D

.Y.:.

ATT. 8 D% _

ek Oe dvd Dwhe . s

'T, em .

68- 7t hM -

" " * ~ '

CW. maa 5Aa c%w Ta- -

7s cmsa .

.0.T:EHF R -

?

JOBmsTORY ,

  • M COMPANY / ADDRESS YOUR T'1T1.E. DLJTIE S
n. im j 3sec\hy b\c o o w\ '.~4 N cc.b. Lese \ l if s p eg; g g

' h o t c.q e1. Sb~ Cen. eof,. soo,% , g o g p,

% A h % W . h 6,(,9 o -

@ h h d oc.t c'. a e -\ .'o e

'\-82 7*t Cc swM 2 L \S C.C. Q E 'l e o-eh -

M.L.NA Cempo y .1* ?* "* "* * " * "j " "w -

l 18\8 tv%,%.s 5, cegt *

"% ** N ".\'l\ ,

l

' .T M hele1 7 k.336.\%\D3

- " 'i* ' * * "d $ "5 P e cA.'o * *

  • d %'t ;- -

iequ seed ye e u St.'B ,,\\eg *,. t q.o st, '

l- B 1 3-83, Lsema 4e TN h(%%5 Q .C. T o o < w nox 39 - g q

! N i!Sotb'slom? % <,Ac. , T-. o s h h % a Asa cep:e oY i

- he os 6\\e 'bs313ri. 'u c\\ T o ~T * . .

l.

ll\- BD h. 60 L et%Le t.

O th u gYs'o ea b . 1 00% o Gor ( g l c.wn,cT -~ . sT " y ?~ ~ % pe a my sea Sec a '~ s A A w y u.sset , e..

1 Pi n. 79 ht7,9 h e s D meat hs ic hm,'e e.3 .

u

\ .

ALAB RESlFE ORGAtlIZATION LAST NAME FIRST tiAt'E DATE El'PLOYEE ilutGER B&W Construction Burch Timothy 11/29/82 1939 l SCHCOL l NATE CITY STATE r MAJCR l DATES l DEG l g . g.

HIGH W.T. Woodson Fairfax , VA Statics & Strength COLLEGE San Bernadina Valley San Bernadina, CA of materials OTHER OTHER MG4TH/ YEAR C04)ANY/ ADDRESS YOUR TITLE DUTIES FR04 TO 10/82 9/82 Wismer & Becker QC Level II Hanger inspection, piping, inspection Monroe, MI 48161 Inspector mechanical inspection (valves & pumps)'

snubber installation.

9/81 10/81 Washington Public Power Materials Responsible for support pro.iect materials Supply System Engineer management to identify, clarify and code Richl&nd, VA 99352 material and equipment for construction spares.

Responsible for final inspection for QC 6/81 8/81 Bechtel Power Corp approval & resolving any welding problems i Berwick, PA 18603 Field Pipe

! prior to final buy-off of the supports for Support Inspector 3/81 6/81 Kaiser Engineering Field Pipe Responsible for QC/QA of pipe support Mascow, Ohio 95153 Support installation in the containment b1dg.

Engineer & final buy-off of supports for client turnover. Doing hand cale's against non-conformance reports of supports.

ngineering Pipe support design for alternate pipe 12/79 3/81 Stone & Webster Mech stress analysis as required for thermal 7501 East Marin Drive Designer & seismic movements and calculations Englewood, CO 80111 for sizing platen, bolt pullout. Also piping design, routing fire protection system pipe shield design.

' ~

l

w s=rnon . msi w.E. nr.si nas w,n antioci.i r,;

h./c).c.C. &$CV /

R W *

.EQUCATION .

E DOL

\

HE CIT T STATE MAJOR Wnrr. $cm.Y. =.

kd.lo Asen 3 .or W.h. / polo , PA d e r T e r m , w o c 9 TTc;.. R n-s . P+ . r - ,ec dec. '2-ME .

(=

O.MER -

l. .

JOB TUSTURY ,

! I" YOUR TITLE DUTIE S COMPANY / APDRESS 97.=~. I to . .

l TL= pag O oe.t.sve 9. P. rmem F,a_o i vs pez:no4 m j>

k.e.Oore.sroex s mat.t. Ge hws-I /-82 /0-82 (i2 o G r- O u 9 0 e5 M e D I -

l .p m . Pn.  ?-

t 0 . SHenr.e.w ca tJ P.P. Pae,so,e ; vsp g ,yn m he. -

E %Wem . 4%I m.n.c PrusGa.s j .g. C oms roc k::

O g.fg f.[/ # =

Gem c bea u:rvi. O j P. tre. . A . e ae I

f ye. 5%-aen ra m - D ec. w m L%e he -

F~iun.o

}[ mu ec6 Ra,a ,w s T:> v e ro

$'To c e d Ut'r GSM 0 . tE).L, . o- % GL.

, gg. 4.n S o - ,e Sr~

g ssu, o , mass,

=

hf g .

A.W. d&m S TDC C' P e t*

  • M C. ,

92o WWwh@ y,y go,t,m p,p,

  • P " "^ -

p _ u_ m e aoe e N-~< cre f'?3 g

i maginou

.~

.g7e em ' * * "

  • B

C N.M.wiJ. ATION LAST NAMs Far.5T N A MF.- DE Q PLo rce it Bhd coraeocnora Co. 'Poewy 3.4

.EQU_ CATION .

'stsco1.J HAME CITT . STATE MAJO R , [ g Gactos East m,w - L> ass /sx y f. 0/Ar c % 7 1' e, .

'(pisen117 ]Jefsuu.s M ya//<ui//e , Jr. 6 eof i p"' a yc. 7,,

/ 4 K/

_. $y~ec% .,ic>- G.e

,0.aGuho/ f 0 -,J2 ,4 ; , n;!ss &

m.

n7m inu y.,. gJxeo'en'eud:i/e- fant'ou /, 1L4, [ C?et Ji,speeho x/(%de' A1AB. ,

OUS

' tt77

/ .

JoaansTaar .

, COMPANY / ADDRP.SS YOUR TITLE. DOTIE S s,i cp as p gree MA

't ?> G ^ ' oc ^- o,,uy '*a-a M it ?<-

gips,pp i 3< , tff',,

,c,,a w . Cw+<) p.acss a.n n,,,ce,, na.g

$/y "" .' [" /^ [ I

/f77 um ..'c .[',,,fr.c";$c

n. - -  %,clek a ,, s des arnenic 6: tis,,i,;g.

Z'tn' GuIy 3alclMI^ ""*

Q, [. on ipu- b y 0~, eteekou,:u efnYecla teel.,g , tepaiViny c,>eu;+ hoa><>

(pi (ptL)p3 ie c'*cui! k *ch.

^

3,,

GEo Gri.shaeliat. /ms. f1, eeI: 7:pe 4 bam a>

TcJim wet $s sig 77,0,7,+-

.zus(ck 11 s ' 'P2- Bee u el Gi,s h S

  • mT.

m dtoe > 02.

fuI SeIf ;d j9c]/]af] /4,ufesfrucfi/c. q I ~yI"' atyf 3 Cunc,I gaul &e se i.)h gy. Clemens, /72 5,,c ,. ,c a.,, n i,,:)

.9)1 eJa.'

,k' '"' " , ,

P jNn let.fansh

?r, m G & , eddy

'"'""a + '

i vr + Sr rk "'7

ALAB REStfdE ORGANIZATION LAST tWE FIRST tW'E DATE EMPLOYEE fMEER B & W Construction Miller Michael 11-29-82 1940 SCHOOL l tWAE CITY STATE i i%)0R ' DATES {DEGl y;~c. .

HIGH AC Reynolds Asheville N C Colleg Prep 2 Y~

1 COLLEGE Manattee Jr., College Bradenton, FL Civil Engineering sem OTHER A-B Tech Asheville, N C Welding 1 8/71 OTHER A-B Tech Asheville, N C Drafting & Design 1.5 MONTH / YEAR COPANY/ ADDRESS YOUR TITLE DUTIES FR04 TO 9/81 11/82 Self Employeed Roofer Estimating, bidding, installation.

Fairview, N C NDE inspections material received Construction 6/74 9/81 Watts Bar Nuclear Plant sei3mi srsport inspection supervisor Tenneessee Valley hee % inspection unit.

Associate Authority l Spring City, TN ,

l 1/74 6/74 Capellin Apts Maintance Pulled maintance on 100 apartment i Knoxville, TX Man eomp1ex.

11/7 1/74 Reynolds Harley Davidson Service Order parts sales maintance on Oteen, N. C. Manager motorcycles.

I Student Loading package car for delivery.

11/7; 6/73 UPS Help Asheville, N.C.

I j

N.si:MTiort MsT Ne.4 nr.sT pr:a o;,7E EniJorEE tv

8. </'CC & C . 6MUMAr-t:- ' toH #/bN2

.EQLLCATION .

DN-

~

HABE CIT T MAao g SRS DEGREk STATE wr. tact Wbd %8(f WM }lIlh// OYl6Vl&f G; Q OW75 f n&&W

~M.; nGH

'23sco e~.x y~ UNNBRSITy sG~ h'NOiWL46gyu /llGCM6VY-Ns

~I~*** 5562 Wh$'f 4* l2/C4 na numv = rare tenmq. wy pery ,

.O.GIER -

JOB 3nsTORY ,

COMPANY / ADDRESS Vo0R TIT 1.E DOTIE S l1n.=~. I ro

      1. AM'"' 4A AUG15>

6f8i !!/2e=f-64-S '**"'#**7 l ~)22 wen 44' / s N 4 /' W " W /sMC7/4/sts/5'Atz,7 QMsuuTAM7 sea =viens 2/U/JV/Nc's )<y Docungar$r472/6 9/Bo 5,/g/ A"#U hub PO WB267%"r-up Co .

  1. 4 iA#UA#4 Efdt/A'G5* ~TUPORM4~/70U MSY8kl.

. OxliMcurs f-n2hYULAriot b O n M'arrRr/sy6p~

f/80 7/96 W4SW#4700Sw&QA AUOtroR' RE//tA' CO, WA P 74 ft 0 4 V d y t k l t e S W M S CoMPo^ltiWS l

yggg cygg.,p

'gl;zy gjgg it'GIr@ All?Ch'Wi* qA4- Qc-R E ll/tA H P Mo P o S 4 s,

P600/ CTS- do'4LU4rsR ccsyrpAc1% cusrse%e

)928651*O g ey ggggy SPfe-ss FAc70/Py'ORQiA;5

%gY Y raiasseeeey qs Avarse Auoir sme11-RaAreo Mincrwv4, srtnyrupes AurHorify' x,oovvicis tava at sysrr-.as s.

Y zaosiiuav<y' cwrm mpf

,- 3~DreWFace6RJ)awssiam

~" . .

-- - - - -~

- s- -

Jos msToav

"*/YR  !

YCO R TITLE. DO72E S coMPAMY / AD DRESS -

i:::=n I rs I -

0 MfA r.*[L 'QdM1/A/$$iEG;il//6QU QSfi!?SIf/DC

,0f?3 #l0 64Al ryhuctsw,&A oft @?h16??va WGM hMSicAu P/ Fat /Nd)

C/MMIGM MMMCat5QCBW4Wr4? SVPB(hn.:sote/.90ggs 4l7) gps 14WMA 2:ou/NHL9; A;y'

~

f47 ""'5 * **'

ShI "Pi(M fbd' - ,

Gd""4" " f)wh7M/Afs@ GC d^M -

401/tJWMEi Wy Sufh7EVI.S;6 /MSfAM Ki70/V era /mv&4t.-4As RPt.U47

- aves. .

a 8

- O O g e

l l

.t . . . .

.e l

9 9

e O

9 e

6 e , e G

e e

O g .e- .

K -

CWW7CN . M*,7 NAME. MtST NAME DATE. EnPrort.E ts5

' BABCOCK & WTTEOX l TELLIE'R , DENNIS P. 2-8-83 1959

, EQU_C.ATION

- N I- N *RS **

CIT'r STATE' MAJo R ATT.. 8 OM'E MIM Norwich Free Acadamy Norwich, CT h:rw General 4 U N- Mohegan Community Norwich, CT Business Admin. 2 ASBA CT-,lER

_0.GIER .

JOS 3 5T0 W ,

l W.Ol'cR 51Lom \ 70 . COMPANY / APORESS WOR TITLE. DOTIE 5 PT & VT's For General Elect. Fit-ups - work performed on the steam l 1/83 2/83 S SI - Hou st on , TX PT & VT dryer - seam welds also final PT i

' Level II & VT's in the vessel.

Stone & Webster Documentat ion Data package preparation and 12/82 1/83 Millstone Point Unit III Control & Review final documentation revied."

Wat erf ord , CT .

Crouse N.E.S. PT & VT Level II ' Various: Receipt inspections, weld Millstone Point Units inspections, QA document review 12/79 '10/8: .I & II ANSI 45.2.6 II and turnover, hanger and pipe mlkdowns, turbine maint. insp. hydro test and inspections.

~

Materials Assurance Quality Tech. Manuf acture ultrasonic transduced 1974 1979 Norwich', CT materials; NDE.

l

(

l .

i O

g

,  ?

Bechtel Power Corporation Interoffice Memorandum To M. Dietrich N No. 0-5359 Sect Job 7220 Midland Project Date March 15, 1983 Quarterly "ALAB" April through June 1983 From L. E. Davis of Construction cop +sio At Midland, MI Est.

L.

Attached is a list of major construction activities to be incorporated into your Quarterly "ALAB" Report.

5ll!*/'

L. E. Davis LED /DMN/CV/ssd

Attachment:

Input to "ALAB" Report Written Response Requested: No bASY[

APR 8 1983

/

AUAlffY ASSURANCE V

So24 (541) +

I oD s

QUARTERLY REPORT April 1983 through June 1983

1. Continue installation of Non-Q Mechanical, Electrical, and Civil work items throughout the plant.
2. Subcontractor, B & W, to continue installation of the NSSS system in both units.

.3 Subcontractor, Zack, to continue installation of HVAC in all facilities.

4. Continue underpinning activities for the Auxiliary, Service Water, and Circulating Water Buildings under direction of the Field Soils Organization.

-