Responds to Generic Ltr 83-01 Re Operator Licensing Exam Site Visit.One Hundred Operators Tentatively Scheduled to Take Exam Approx 4 Months Prior to Fuel Load.Revised Fuel Load Data Unavailable Due to Schedule Slips
ML20073B832
Person / Time
Site: Midland
Issue date: 03/31/1983
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Harold Denton
Office of Nuclear Reactor Regulation
References
21638, GL-83-01, NUDOCS 8304120570
Download: ML20073B832 (2)


Text

f ~'

5 0 I

ODMmm Power James W Cook CONh00f Vice President - Projects. Engineering and Construction General off ces: 1945 West Parnsli Road, Jackson, MI 49201 * (517) 78& O453 March 31, 1983 Harold R Denton, Director Office of Nuclear Reactor Regulation Division of Licensing US Nuclear Regulatory Commission Washington, DC 20555

(

MIDLAND ENERGY CENTER PROJECT e

MIDLAND DOCKET NOS 50-329, 50-330 RESPONSE TO GENERIC LETTER 83-01 OPERATOR LICENSING EXAMINATION SITE VISIT FILE 0505.813 SERIAL 21638 1

Generic Letter 83-01, dated January 11, 1983, requested that Consumers Power Company identify proposed dates between January 11, 1983 and December 31, 1985

')

that will require an NRC site visit for operator licensing or instructor certification examinations. The proposed examination dates for the Palisades and Big Rock Point Plants were previously submitted in a February 28, 1983 letter to D G Eisenhut. The following information pertains to the Midland Plant.

Tentatively, 100 Midland operators should be scheduled to take the licensing examination starting approximately four months prior to fuel load. These li-censing candidates are divided into four groups of approximately 25 each, with three groups to complete the examinations before fuel load and the fourth group to finish approximately one month af ter fuel load. Due to recent schedule slips and additional work being completed, revised fuel load data is not currently available. After a new fuel load date is determined, CP Co will update this information adding specific dates and making any changes neces-sary.

[

^34 M w --

JWC/KJT/fms CC RJCook, Midland Resident Inspector RHernan, US NRC DBMiller, Midland Construction (3)

RWHuston, Washington DGEisenhut, US NRC JGKeppler, US NRC JIMcMillen, US NRC, Region 3 oc0383-1709a131 8304120570 83033i PDR ADOCK 05000329 V

PDR

~

CONSUMERS POWER COMPANY Midland Units 1 and 2 Docket No 50-329, 50-330 Letter Serial 21638 Dated March 31, 1983 At the request of the Commission and pursuant to the Atomic Energy Act of 1954, and.the Energy Reorganization Act of 1974, as amended and the Commission's Rules and Regulations thereunder, Consumers Power Company submits the information pertaining to Midland requested in Generic Letter 83 Operator Licensing Examination Site Visit.

CONSUMERS POWER COMPANY By JW ook, Vice President Projec

, Engineering and Construction Sworn and subscribed before me this [b day of b ~6 /9/3 I

oubs L& W

!Se'verly A' ackson County, Michigan Ayefotary Pub)ic J

My Commission Expireshu,u,.,// /[/[

/-

oc0383-1709a131