ML20073B606
| ML20073B606 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 09/13/1994 |
| From: | Hutchinson C ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20073B609 | List: |
| References | |
| GNRO-94-00117, GNRO-94-117, NUDOCS 9409220138 | |
| Download: ML20073B606 (2) | |
Text
.
l Entsrgy Operations,Inc.
ENTERGY
~-
eo use Port Gbson.MS 39150 l
Tel601437 2f>00 '
C. R. Hutchinson Vce Fievjant September 13, 1994 cww.
om ca nax sac
)
i l
U.S. Nuclear Regulatory Commission
.i Mail Station P1-137 Washington, D.C. 20555
[
Attention:
Document Control Desk
-l
SUBJECT:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Monthly Operating Report GNRO-94/00117 i
Gentlemen:
In accordance with the requirement of Technical Specification 6.9.1.10 Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for August 1994.
j The 1993 year-to-date data for the Net Electrical Energy Generated (MWH) was reported incorrectly. It should have been reported as 7,903,463. This was caused by inadvertently reporting the February 1993 monthly data as 804,485. This should have been reported as 809,485. We regret this error.
l If you have any questions or require additionalinformation, please contact this office.
Yours trul,
[
r l
?
CRH/TMC attachments:
1.
Operating Status
. 2.
Average Daily Power Level 3.
Unit Shutdown and Power Reductions cc:
(See Next Page) l J,.
m
\\
Gwa,<<
DR DC O
O R
,a-September 13, 1994 GNRO-94/00117 Page 2 of 3 cc:
Mr. R. H. Bernhard (w/a)
Mr. D. C. Hintz (w/a)
Mr. R. B. McGehee (w/a)
Mr. N. S. Reynolds (w/a)
Mr. H. L. Thomas (w/o)
Mr. Stewart D. Ebneter (w/a)
Regional Administrator U.S. Nuclear Regulatory Commission Region 11 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30323 Mr. P. W. O'Connor, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C. 20555 1
..