ML20073B601
| ML20073B601 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 04/07/1983 |
| From: | Gucwa L GEORGIA POWER CO. |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| References | |
| NED-83-242, NUDOCS 8304120471 | |
| Download: ML20073B601 (1) | |
Text
_
Georgia Power Conipany 333 P.edmont Avenue
' At:anta. Georg.a 30308 Telephone 404 526-6526 Maihng Address Post Off.ce Box 4545 g
. Ar.anta Geog,a 30302 Georgia Power.
Power Generation Department ED-83-242 April 7, 1983 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555 NRC DOCKETS 50-321,.50-366 OPERATING LICENSES DPR-57, WF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 WDES PERMIT Gentlemen:
Your letter of March 11, 1983, transmitting Amendments 94 and 31 to the Unit 1 and Unit 2 Environmental Technical Specifications, respectively, requested confirmation of a verbal commitment made by Georgia Power to provide the NRC with a copy of any changes to the W DES discharge permit and any permit violations requiring notification to the permitting agency.
Requirements to inform the NRC of WDES permit violations are already contained in the Environmental Technical Specifications, Section 4.3.. In addition to these requirements, we will supply the NRC with copies of' any changes to the WDES permit.
This information will be submitted to the-Region II office, with a copy to the Director of Nuclear Reactor Regulation.-
Please contact this office if further information is required.
Very truly yours:
+
hl 8304120471 830407 L. T. Gucwa PDR ADDCK 05000321 Chief Nuclear Engineer P
J. T. Beckham, Jr.
pp' H. C. Nix, Jr.
F J. P. O'Reilly (NRC-' Region II)~
Senior Resident Inspector T. E. Byerley-m