ML20073B479

From kanterella
Jump to navigation Jump to search
Advises That Revised HVAC Recovery Plan to Be Submitted on 830327 Will Be Delayed Until 830422 Due to Problems W/Overinsp & Records Verification Programs Impacting HVAC Recovery Effort
ML20073B479
Person / Time
Site: Clinton Constellation icon.png
Issue date: 03/30/1983
From: Hall D
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
0982-L, 982-L, U-10047, NUDOCS 8304120430
Download: ML20073B479 (1)


Text

s 0982-L ILLINDIS POWER COMPANY U-10047 CLINTON POWER STATION. P.O. BOX 678, CLINTON, ILLINOIS 61727 Docket No. 50-461 March 30, 1983 PRINCIPAL STAFF Mr. James G. Keppler Regional Administrator d^p, U. S. Nuclear Regulatory Commission A /RA PAO Region III lJPRP SLO 799 Roosevelt Road 8

yan i

ac Glen Ellyn, IL 60137 DRMSP 0E~

fyc A

v I4L i

Subj ect:

HVAC Recovery Plan OL FILE WI i

Dear Mr. Keppler:

During the meeting held in your offices on March 17, 1983, Illinois Power Company indicated that a revised Clinton Power Station (CPS) HVAC Recovery Plan would be submitted for NRC concurrence within ten (10) days (by March 27, 1983).

Based upon a detailed review of the CPS HVAC problems and concerns, and of other site programs (Overinspection Program, Records Verification Program) that impact the HVAC recovery effort, additional revisions to the HVAC Recovery Plan will be required.

Subsequently, the HVAC Recovery Plan will be delayed in submission to the NRC.

It is estimated that the HVAC Recovery Plan will be submitted by Friday, April 22, 1983.

Sincerely yours, D. P. Hall Vice President REC /j f cc:

NRC Resident Inspector Manager - Quality Assurance Director, Office of I&E USNRC, Washington, DC 20555 Illinois Department'of Nuclear Safety l

l APR 41883 Ed/

8304120430 830330 PDR ADOCK 05 y

A

_ _