i CHARLES U. CRUSE Baltunore Gas and Electric Company Plant General hianager Calvert Clifs Nuclear Power Plant Calvert Cliffs Nuclear Power Plant 165o Calven Clifs Parkway Lasby, Afaryland20657 4Io 586-2200 Est. 41or Local -
410 260-4101 Baltimore 4
September 15,1994 i
U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Augu1L1994 Operatina Data Reports l
The subject reports are being sent to you as required by Technical Specification 6.9.1.6.
Should you have any questions, please contact Mr. Bruce Mrowca at (410) 260-3989.
Very truly yours,
/, /
//p CIIC/FP/bjd Attachments cc:
D. A. Omne, Esquire J. E. Silberg, Esquire M. K. Boyle, NRC D, G. Mcdonald, Jr., NRC
- T. T. Martin, NRC P. R. Wilson, NRC.
R. A. Hanficid, NRC R. I. McLean, DNR
' J. H. Walter, PSC P, Ixwis, INPO K. Larson, ANI
'[,OdbO 9409210350 940031
.{DR ADOCK 05000317 PDR
co**************************************************************************
UNIT I OPERATING DATA REPORT oO*********f4****************************************************************
L September 15, 1994 Prepared by Frank Piazza Telephone:(410)260-3821
-j OPERATING STATUS 1.
UNIT NAME Calvert Cliffs Unit 1 2.
REPORTING PERIOD AUGUST 1994
.3.
LICENSED THERMAL POWER (MWT) 2700 1
- 4. NAMEPLATE RATING (GROSS MWe) 918 5.
DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 865 7.
MAXIMUM DEPENDABLE CAP'Y (NET MWe) 835 8.
CHANGE IN CAPACITY-RATINGS NONE 9.
POWER LEVEL TO WHICH RESTRICTED N/A-
- 10. REASONS FOR RESTRICTIONS.
N/A Cumulative This month Year-to-Date to Date
- 11. HOURS IN REPORTING PERIOD 744 5,831 169,332
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2,982.7 119,951.7
- 13. REACTOR' RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4 l
.14.
HOURS GENERATOR ON LINE 744.0 2,729.1 117,307.5
- 15. UNIT' RESERVE SHUTDOWN HOURS 0.0 0.0 0.0-1
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,005,390 6,976,578 297,291,397
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 652,429 2,285,045 98,758,591 l
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 625,392 2,182,615 93,986,897-I
- 19. UNIT. SERVICE FACTOR 100.0 46.8 69.3 J
- 20. UNIT AVAILABILITY FACTOR 100.0 46.8' 69.3
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 100.7 45.0 67.2
- 22. UNIT CAPACITY FACTOR (USING DER NET) 99.5 44.3 65.7 i
- 23. UNIT FORCED OUTAGE RATE 0.0 20.8 9.0 l
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
N/A L25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
N/A i
UNIT SilUTDOWNS AND POWER REDUCI' IONS DOCKET NO.
50-317 UNIT NAME Calvert Cliffs-U1 -
DATE September 15.1994 -
COMPLEED BY Frank Piazza TELEPHONE (410)260-3821 REPORTMONTII August 1994 METIIOD OF SIIUTUNG LICENSEE CAUSE & CORRECHVE DURATION DOWN EVENT SYSTEM COMPONENT ACHON1D (IIOURS)
REASON 2 REACTOR 3 REPORT #
CODE 4 CODES PREVENT RECURRENCE NO.
DATE TYPEI There were no significant power reductions this month.
6 1 F: Forced 2 Reason:
3 Method:
4 IEEE Standard 805-1984 S: Scheduled A-Equipment Failure 1 -Manual B - Maintenance or Test 2 - Manual Scram.
C-Refueling 3 - Automatic Scram.
5 IEEE Standard 803A-1983 D-Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Reduced Load F-Administrative 9 - Other G - Operational Error H - Other
m
~._ __ _. _
i
.3 AVERAGE DAILY UNIT POWFR LEVEL (j
.e***********************************************************************
.j
~
Docket:No. 50-317
.j Calvert Cliffs Unit No. 1 September 15, 1994 Prepared by Frank Piazza.
l Telephone: (410) 260-3821-AUGUST 1994 Average Daily Power Level'
. Average Daily Power Level-Day (MWe-Net)
Day (MWe-Net) 1 836 17 841 2
838 18 840 3
838.
19 841' 4
838 20 842 5
839 21 841 6
'842 22 842 7
841 23 844 l
8 840 24 843.
i 9
840 25 844 10 840 26 844 i
i 11 837 27 844 12 836 28 844
}
13 838 29 844-14 838 30 844 15 837 31 845 16 839 i
6 4
e I
DOCKET NO. 50-317
' CALVERT CLIFFS - UNIT 1 September 15,1994
SUMMARY
OF OPERATING EXPERIENCE August 1994 i
The unit began the month at 100% reactor power and operated there the entire month.
1 l
'I l
i i
I I
^
' September 7,1994 NFM 94-255 Page 2 of 3
)
REFUELING INFORMATION REOUEST Ii 1.
Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No.1.
I i
2.
Scheduled date for next refueling shutdown: March,1996.
3.
Scheduled date for restart following refueling: May,1996.
4.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
]
None identified at this time.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
Unknown.
6.
Important licensing considerations associated with the refueling.
None identified at this time.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 1466 (Note 2)*
Spent fuel pools are common to Units 1 and 2.
8.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number.
of fuel assemblies.
(a) 4710 (Note 1)
(b) 0 9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
March 2007
- l NOTE 1:
4710 total licensed site storage capacity.
(1830 pool + 2880 ISFSI)
NOTE 2:
120 Spent Fuel Assemblics in the ISFSI.*
Entry has changed since last reported.
i
o***************************************************************************
UNIT 2 OPERATING DATA REPORT j
oo**************************************w***********************************
Docket No. 50-318 September 15, 1994 Prepared by Frank Piazza Telephone: (410) 260-3821 OPERATING STATUS 1.
UNIT NAME Calvert Cliffs Unit 2 2.
REPORTING PERIOD AUGUST 1994 3.
LICENSED THERMAL POWER (MWT) 2700 4.
NAMEPLATE RATING (GROSS MWe) 911 5.
DESIGN ELECTRICAL RATING (NET MWe) 845 6.
MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 870 7.
MAXIMUM DEPENDABLE CAP'Y (NET MWe) 840 8.
CHANGE IN CAPACITY RATINGS NONE 9.
POWER LEVEL TO WHICH RESTRICTED N/A
- 10. REASONS FOR RESTRICTIONS N/A Cumulative This month Year-to-Date to Date
- 11. HOURS IN REPORTING PERIOD 744 5,831 152,687
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 659.1 5,372.9 111,409.7
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
- 14. HOURS GENERATOR ON LINE 635.1 5,337.5 109,861.1
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,431,003 13,914,167 280,779,710
- 17. GROSS ELECTRICAL ENEPGY GEN'TED(MWH) 460,208 4,623,296 92,779,165
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 436,651 4,433,596 88,676,730 l
- 19. UNIT SERVICE FACTOR 85.4 91.5 72.0
- 20. UNIT AVAILABILITY FACTOR 85.4 91.5 72.0
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 69.9 91.2 70.4
- 22. UNIT CAPACITY FACTOR (USING DER NET) 69.5 90.0 68.7
- 23. UNIT FORCED OUTAGE RATE 14.6 6.1 5.7
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT j
SIX MONTHS (TYPE, DATE AND DURATION):
March 18,1995
- 25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
N/A
UNIT SIlUTDOWNS AND POWER REDUCflONS DOCKETNO.
50-318 UNIT NAME Calvert Cliffs-U2 DATE SeptemW 15c1W4 COMPLEI tid BY Frank Piazza TELEPHONE
( t10) 260-3821 REPORT MONTIE Auenst 1994 METIIOD OF SiRTITING LICENSEE CAUSE & CORRECTIVE DURATION DOWN EVENT SYSTEM COMPONENT ACTION TO NO.
DATE TYPEI (IIOURS)
REASON 2 REACTOR 3 REPORT #
CODE 4 CODE 5 PREVENT RECURRENCE 94 4 940810 F
67.0 A
3 318,944)o4 TL EXC Unit tripped on loss of load due to loosing *.he Main Generator field voltage. De trip occurred due to the intermittent malfunction of the Minimum Excitation Limiter (MEL) circuit which caused voltage spikes from the voltage regulator. De voltage regulator MEL circuit tard was replaced and the excitation system was thoroughly tested pnor to restarting the unit.
944)7 940814 F
41.9 A
1 N/A SE PSF While escalating to full power an operator noticed and reported a small water and steam leak from the extraction steam line. De insulation at the leak area was removed and a 1" crack in a 21/2" pipe fitting was found. After repairs and during power escalation, reactor power was held at 30% at the request of the dispatcher on 8/1694 due to low power demand on the grid.
$44WI 940823 5
0 1I 5
N/A N/A N/A Reactor power was reduced to 52% at the request of the dispatcher due to low grid power demand on 8/23/94 through 8/29/94.
94-09 940829 5
0 11 5
N/A N/A N/A Reactor power was reduced at 1420 to approx.52% at the request of the dispatcher for low grid power demand.
I F: Forced 2 Reason-3 Method:
4 IEEE Standard 805-1984 S: Scheduled A - Ec,uipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.
C - Refueling 3 - Automatic Scram.
5 IEEE Standard 803A 1983 D - Regulatory Restriction 4 - Continued E - Operator Training & I; cense Examinataa 5 -Reduced lead F-Administrative 9 - Other 0 - Operational Error li-Other
d AVERAGE DAILY UNIT POWER LEVEL co**********************************************************************
Docket No. 50-318 Calvert Cliffs Unit No. 2 September 15, 1994 Prepared by Frank Piazza Telephone: (410) 260-3821 AUGUST 1994 Average Daily Power Level Average Daily Power Level Day (MWe-Net)
Day (MWe-Net) 1 833 17 836 2
831 18 838 3
832 19 838 4
832 20 837 5
835 21 837 6
838 22 836 7
838 23 746 8
837 24 407 9
837 25 406 10 762 26 406 11 0
27 404 12 0
28 408 13 52 29 592 14 0
30 409 15 0
31 411 16 656
t DOCKET NO. 50-318 J
' CALVERT CLIFFS - UNIT 2 i
September 15,1994
SUMMARY
OF OPERATING EXPERIFNCE Aucust 1994 The unit began the month at 100% reactor power. On August 10,1994 at 2154 the main generator tripped due to loss of main generator field voltage. The generator trip was followed by a reactor trip for loss of load. The generator loss of field voltage was caused by an intermittent failure in the Minimum Excitation Limiter (MEL) circuit causing a voltage transient from the voltage regulator circuit. The voltage regulator MEL circuit board was replaced and tested prior to restarting the unit.
The unit was returned to power and was paralleled to the grid at 1651 on August 13,1994. At 1845 on August 13,1994 a steam leak was found in the extraction steam line. The unit was shutdown starting from approximately 45% reactor power commencing at 2355. The steam leak was repaired and the unit was paralleled to the grid at 2043 on August 15,1994. During power escalation and after reaching 30% reactor power the power increase was slowed to 3% - 5% per hour due to a very low power demand from the grid. Reactor power reached 100% at 1200 on August 16,1994.
On August 23,1994 at 1645 power was reduced due to a very low power demand from the grid. The power was increased to 100% on August 29 at 1245, however, at 1420 reactor power was again decreased to approximately 52%.
The unit ended the month at approximately 52% reactor power (405 - 410 MWe net).
s
'. ',. I ' September 7,1994 NFM 94-255
' Page 3 of 3 REFUELING _INFOILMATION REQUEST i
1.
Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2 2.
Scheduled date for next refueling shutdown: March 18,1995.*
3.
Scheduled date for restart following refueling: May 22,1995.*
4.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
1 No.*
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
I 1
Unknown.
-i 6.
Important licensing considerations associated with the refueling.
.1 None identified at this time.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 1466 (Note 2)*
Spent fuel pools are common to Units 1 and 2.
8.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel
)
assemblies.
j i
(a) 4710 (Note 1)
(b) 0 1
9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
j Mareh 2007 *
. NOTE 1:
4710 total licensed site storage capacity.
(1830 pool + 2880 ISFSI)
NOTE 2:
120 Spent Fuel Assemblies in the ISFSI.*
Entry has changed since last reported.