ML20072V142
| ML20072V142 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/13/1994 |
| From: | Bergman T Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20072V117 | List: |
| References | |
| NUDOCS 9409190214 | |
| Download: ML20072V142 (2) | |
Text
.-
o 7590-01 UNITED STATES NVCLEAR REGULATORY COMMISSION IfXAS UTILITIES ELECTRIC COMPANY DOCKET NOS. 50-445 AND 50-446 NOTICE OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LICENSES The U.S. Nuclear Regulatory Commission (the Commission) has issued Amendment Nos. 27 and 13 to Facility Operating License Nos. NPF-87 and NPF-89 issued to Texas Utilities Electric Company which consisted of changes.to the technical specifications related to the operation of the Comanche Peak Steam Electric Station, Units 1 and 2, located in Somervell County, Texas.
The amendments are effective as of the date of issuance.
The amendments revised Technical Specification 5.3.1 to permit the use of fuel with maximum enrichments of 5.0 weight percent Uranium 235.
The application for the amendments complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations.
The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendments.
Notice of Consideration of Issuance of Amendments and Opportunity for Hearing in connection with this action was published in the FEDERAL REGISTER on August 1, 1994 (59 FR 38991). No request for a hearing or petition for leave to intervene was filed following this notice.
9409190214 940913 PPR ADOCK 05000445 p
0 J l
The Commission has prepared an Environmental Assessment related to the action and has determined not to prepare an environmental impact statement.
Based upon the environmental assessment, the Commission has concluded that the issuance of these amendments will not have a significant effect on the quality of the human environment.
For further details with respect to the action see (1) the application
]
for amendments dated April 22, 1994, (2) Amendment No. 27 to License No.
NPF-87, Amendment No. 13 to License No. NPF-89, and (3) the Commission's related Safety Evaluation and Environmental Assessment. All of these items are available for public inspection at the Commission's Public Document Room, 2120 L Street, N.W., Washington, D.C., and at the local public document room located at the University of Texas at Arlington Library, Government Publications / Maps, 701 South Cooper, P.O. Box 19497, Arlington, Texas 76019.
A copy of items (2) and (3) may be obtained upon request addressed to the U.S.
Nuclear Regulatory Commission, Washington, D.C.
20555, Attention:
- Director, Division of Reactor Projects III/IV.
Dated at Rockville, Maryland this 13th day of September 1994.
FOR THE NUCLEAR REGULATORY COMMISSION omas gm n, oe nager Project Director e V-1 Division of Reacto rojects III/IV Office of Nuclear Reactor Regulation
-