Text
i Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401 1927 Telephone (612) 330-55C0
. September 9, 1994 Monticello Technical Specifications Section 6.7.A.3 US Nuclear Regule. tory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR CENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report Aucust, 1994 Attached is the Monthly Operating Report for August, 1994 for the Monticello Nuclear Generating Plant.
Y kovSOb Roger O Ande on Director Licensing and Management Issues c:
Director, Office of Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC l
NRC Resident Inspector State of Minnesota - Kris Sanda I
Attachment i
l i (' ', *f
>%J
._ a a l,
t l
9409190204 940832
}
8 PDR ADOCK 05000263 i
)
R Pnp
OPERATING DATA REPORT 4
DOCKET NO.
50-263 DATE 9-1-94 COMPLETED BY H.
H.
Paustian i
TELEPHONE 612/295-5151 I
l OPERATING STATUS
] Notes
]
Monticello
]
)
J 1. Unit Name :
l 2. Reporting period:
August
]
}
- 3. Licensed Thermal Power (MWt)
1670 J
]
- 4. Naneplate Rating (Gross MWe):
569
]
]
- ' 5. Dasign Electrical Rating (Not MWe)
545.4
]
]
l l 6. Maximum Dependable Capacity (Gross MWe):
564
]
]
- 7. Maximum Dependable Capacity (Net MWe):
- 536
]
}
- 8. If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE CUhULATIVE l11. Hours In Reporting Period 744 5831 203112 l12. Number Of Hours Reactor Was Critical 744.0 5669.2 165044.9 l13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
- 14. Hours Generator On-Line 744.0 5636.3 162237.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1108162 9231924 250496704
- 17. Gross Electrical Energy Generated (MWH) 3 ti7156 3110062 84664725
' 18. Not Electrical Energy Generated (MWn) 347467 2980596 80999389
!19. Unit Service Factor 100.0%
96.7%
79.9%
l20. Unit Availability Factor 100.0%
96.7%
79.9%
'21. Unit Capacity Factor (Using MDC Net) 87.1%
95.4%
74.4%
- 22. Unit Capacity Factor (Using DER Net) 85.6%
93.7%
73.1%
- 23. Unit Forced Outage Rate 0.0%
3.3%
3.6%
'24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
- Refueling Outage - 9/15/94 - 39 days
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup
- N/A
- 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION I
l l
1 l
_. ~. ~
^
-AVERAGE DAILY UNIT POWER LEVEL 1
. DOCKET.NO.
50-263 UNIT Monticello-DATE 9-1 t
. COMPLETED-BY
.H.
H.-Paustian' I
TELEPHONE-612/295-5151 MONTH OF August DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE-DAILY POWER LEVEL (MWe-Net)
( MWe-Ne t )-
1 497.-
17-465.-
'2 493.
18 466.
3 490.
19 459.
4 490.
20 458.
5 488.
21~
458.
6 488.
22 451.
7 486.
23
-454.
8 485.
24 448.
9 71.
25 447.
10 481.
.26=
445.
11 482.
27 439.
12 481.
28
- 442, 13 474.
29 438.
14 473.
30 438.
15 470.
31 437.
16 468.
i
)
INSTRUCTIONS 5
On this format, list the average daily unit power-level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
' NARRATIVE
SUMMARY
OF OPE' RATING EXPERIENCE-
'#~
,q DOCKET NO.
50-263 DATE 9-1-94 COMPLETED BY
-H.
H.
Paustian TELEPHONE. 612/295-5151 MONTH AUG 08-01-94 to Power operation (End-of-cycle coastdown began 7/18/94.)
08-31-94 Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.
L-
{
?
A UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKER NO.
50-263 UNIT NAME ~Montice n o DATE 9-01-94 COMPLETED BY 71. H. Paustian7 REPORT MONTH August TELEPil0NE [612/295-5151 4
No.
Date Type Duration Reason Method LER System Comp.
Cause & Corrective 11)
(hours)
(2) of No.
Code Code Action to Shutdown (4)
(5)
Prevent Recurrence (3)
None 1
2 3
4 F: Forced Reason:
Method:
Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-D5)
B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5
D-Regulator Restriction 4-Other (Explain)
IEEE Standard 803A-1983 E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
.