Monthly Operating Rept for Aug 1994 for Monticello Nuclear Generating Plant
ML20072V129
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 08/31/1994
From: Richard Anderson, Paustian H
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9409190204
Download: ML20072V129 (5)


Text

i Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401 1927 Telephone (612) 330-55C0

. September 9, 1994 Monticello Technical Specifications Section 6.7.A.3 US Nuclear Regule. tory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR CENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report Aucust, 1994 Attached is the Monthly Operating Report for August, 1994 for the Monticello Nuclear Generating Plant.

Y kovSOb Roger O Ande on Director Licensing and Management Issues c:

Director, Office of Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC l

NRC Resident Inspector State of Minnesota - Kris Sanda I

Attachment i

l i (' ', *f

>%J

._ a a l,

t l

9409190204 940832

}

8 PDR ADOCK 05000263 i

)

R Pnp

OPERATING DATA REPORT 4

DOCKET NO.

50-263 DATE 9-1-94 COMPLETED BY H.

H.

Paustian i

TELEPHONE 612/295-5151 I

l OPERATING STATUS

] Notes

]

Monticello

]

)

J 1. Unit Name :

l 2. Reporting period:

August

]

}

3. Licensed Thermal Power (MWt)

1670 J

]

4. Naneplate Rating (Gross MWe):

569

]

]

' 5. Dasign Electrical Rating (Not MWe)

545.4

]

]

l l 6. Maximum Dependable Capacity (Gross MWe):

564

]

]

7. Maximum Dependable Capacity (Net MWe):

- 536

]

}

8. If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE CUhULATIVE l11. Hours In Reporting Period 744 5831 203112 l12. Number Of Hours Reactor Was Critical 744.0 5669.2 165044.9 l13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
14. Hours Generator On-Line 744.0 5636.3 162237.0
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1108162 9231924 250496704
17. Gross Electrical Energy Generated (MWH) 3 ti7156 3110062 84664725

' 18. Not Electrical Energy Generated (MWn) 347467 2980596 80999389

!19. Unit Service Factor 100.0%

96.7%

79.9%

l20. Unit Availability Factor 100.0%

96.7%

79.9%

'21. Unit Capacity Factor (Using MDC Net) 87.1%

95.4%

74.4%

22. Unit Capacity Factor (Using DER Net) 85.6%

93.7%

73.1%

23. Unit Forced Outage Rate 0.0%

3.3%

3.6%

'24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)

Refueling Outage - 9/15/94 - 39 days
25. If Shut Down At End Of Report Period, Estimated Date Of Startup
N/A
26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION I

l l

1 l

_. ~. ~

^

-AVERAGE DAILY UNIT POWER LEVEL 1

. DOCKET.NO.

50-263 UNIT Monticello-DATE 9-1 t

. COMPLETED-BY

.H.

H.-Paustian' I

TELEPHONE-612/295-5151 MONTH OF August DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE-DAILY POWER LEVEL (MWe-Net)

( MWe-Ne t )-

1 497.-

17-465.-

'2 493.

18 466.

3 490.

19 459.

4 490.

20 458.

5 488.

21~

458.

6 488.

22 451.

7 486.

23

-454.

8 485.

24 448.

9 71.

25 447.

10 481.

.26=

445.

11 482.

27 439.

12 481.

28

442, 13 474.

29 438.

14 473.

30 438.

15 470.

31 437.

16 468.

i

)

INSTRUCTIONS 5

On this format, list the average daily unit power-level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

' NARRATIVE

SUMMARY

OF OPE' RATING EXPERIENCE-

'#~

,q DOCKET NO.

50-263 DATE 9-1-94 COMPLETED BY

-H.

H.

Paustian TELEPHONE. 612/295-5151 MONTH AUG 08-01-94 to Power operation (End-of-cycle coastdown began 7/18/94.)

08-31-94 Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.

L-

{

?

A UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKER NO.

50-263 UNIT NAME ~Montice n o DATE 9-01-94 COMPLETED BY 71. H. Paustian7 REPORT MONTH August TELEPil0NE [612/295-5151 4

No.

Date Type Duration Reason Method LER System Comp.

Cause & Corrective 11)

(hours)

(2) of No.

Code Code Action to Shutdown (4)

(5)

Prevent Recurrence (3)

None 1

2 3

4 F: Forced Reason:

Method:

Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-D5)

B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5

D-Regulator Restriction 4-Other (Explain)

IEEE Standard 803A-1983 E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

.