ML20072V022
| ML20072V022 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 07/30/1994 |
| From: | Stratman R CENTERIOR ENERGY |
| To: | |
| Shared Package | |
| ML20072U999 | List: |
| References | |
| NUDOCS 9409190143 | |
| Download: ML20072V022 (1) | |
Text
l l
l INDUSTRIAL PRETREATHENT OUARTERLY SELF-MONITORING RESULTS Perry Nuclear Power Plant Permit No.: 1004911 l
10 Center Rd.
Report Date: 7/19/94 l
Perry, Ohio 44081 Laboratory: Quanterra Inc.
)
l Date of Sample: 6/30 to 7/1/94 Time of sample: 0845 Sample Location: Sevage Pump Station Name of Sampler: Greg Newman l
Laboratory Address: 1401 Shuffel Dr.
North Canton OH 44720 Date of Analysis: 7/1 to 7/15/94 Flow: 33,000 gpd t
l Name of Analyst: K. Graves t
l PARAMETER SAMPLE EPA ANALYSIS ANALYSIS TYPE METHOD DATE RESULT l
C0D Composite 410.4 7/14 to 7/15 210 mg/L BOD Composite 405.1 7/2 to 7/7 83 mg/L i
TSS Composite 160.2 7/5 21 mg/L Silver Composite 200.7 7/11 to 7/14 None Detected pH Grab 150.1 7/1 9.0 s.u.
Oil / Grease Grab 413.1 7/11 to 7/12 7.0 mg/L Gravimetric I certify under penalty of lav that I have personally examined and I am familiar with the information in this report and that, based on my inquiry of those persons immediately responsible for obtaining the information contained in this report, I believe that the information is true, accurate, and complete.
I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment.
r Vice President - Nuclear Sigrfatur'e Gate Title 9409190143 94cygg l
PDR ADOCK 05000440 R
Pnn