ML20072V022

From kanterella
Jump to navigation Jump to search
Industrial Pretreatment Quarterly Self-Monitoring Results for July 1994
ML20072V022
Person / Time
Site: Perry 
Issue date: 07/30/1994
From: Stratman R
CENTERIOR ENERGY
To:
Shared Package
ML20072U999 List:
References
NUDOCS 9409190143
Download: ML20072V022 (1)


Text

l l

l INDUSTRIAL PRETREATHENT OUARTERLY SELF-MONITORING RESULTS Perry Nuclear Power Plant Permit No.: 1004911 l

10 Center Rd.

Report Date: 7/19/94 l

Perry, Ohio 44081 Laboratory: Quanterra Inc.

)

l Date of Sample: 6/30 to 7/1/94 Time of sample: 0845 Sample Location: Sevage Pump Station Name of Sampler: Greg Newman l

Laboratory Address: 1401 Shuffel Dr.

North Canton OH 44720 Date of Analysis: 7/1 to 7/15/94 Flow: 33,000 gpd t

l Name of Analyst: K. Graves t

l PARAMETER SAMPLE EPA ANALYSIS ANALYSIS TYPE METHOD DATE RESULT l

C0D Composite 410.4 7/14 to 7/15 210 mg/L BOD Composite 405.1 7/2 to 7/7 83 mg/L i

TSS Composite 160.2 7/5 21 mg/L Silver Composite 200.7 7/11 to 7/14 None Detected pH Grab 150.1 7/1 9.0 s.u.

Oil / Grease Grab 413.1 7/11 to 7/12 7.0 mg/L Gravimetric I certify under penalty of lav that I have personally examined and I am familiar with the information in this report and that, based on my inquiry of those persons immediately responsible for obtaining the information contained in this report, I believe that the information is true, accurate, and complete.

I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment.

r Vice President - Nuclear Sigrfatur'e Gate Title 9409190143 94cygg l

PDR ADOCK 05000440 R

Pnn