Monthly Operating Rept for Aug 1994 for Waterford 3 Ses.W/
ML20072V009
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/31/1994
From: Becker T, Burski R
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-94-0157, W3F1-94-157, NUDOCS 9409190136
Download: ML20072V009 (7)


Text

.J

~=5~ ENTERGY PX"s """*"*' '"*'

Keca LA 70066 Tet 504 7396774 '

l 1

R. F. Burski Dncu Near Saley -

  1. dvbd3 W3F1-94-0157 A4.05-PR-l September 14, 1994-

'U.S. Nuclear Regulatory Commission ATTN: ' Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382

.j License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject monthly report which covers the operating statistics for the month of August, 1994. 'This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications-for Facility J

Operating License No. NPF-38.

Very truly yours, 4

R.F. Burski Director Nuclear Safety RFB/DFL/ssf Attachment cc:

L.J. Callan (NRC Region IV)

R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)

J.T. Wheelock (INP0 Records Center)

NRC' Resident Inspectors Office 1 (+ n ~ - m a

9409190136 940831 g,

ADOCK'0500g2

/

DR

.p-t 4

1 l

1 NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 -

i AUGUST 1994 l

i The unit operated at an average reactor power of 99,7% and experienced no shutdowns'or significant l

power reductions during the period, t

i f

W i

i r

t

+

l l-s

(

I i

J i.

2 4.-..;

4-m&.

~

4 s

.4-a 4_-

l

.(

f*.

i e"

e e

)

/

t PRESSURIZER SAFETY VALVE '

FAILURES AND CHALLENGES WATERFORD 3 During the month of August 1994, there were no pressurizer safety valve failures or challenges.

i l

?

l t

i i

i f

1 l

i

-.a 4

OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: SEPTEMBER,1994 COMPLETED BY:

T.S. BECKER '

TELEPHONE: 504-739-6683 OPERATING STATUS 1.

Reporting Period: August,1994 Gross Hours in Reporting Period: 744 P

2.

Currently Authorized Power Level (MWt): 3390 Maximum Dependable Capacity (Net MWe): 1075 Design Electrical Rating (Net MWe): 1104 3.

Power Level to which Restricted (if any) (Net MWe): N/A 4.

Reasons for Restriction (if any): N/A THIS MONTH YR TO DATE CUMULATIVE 5.

Number of Hours Reactor was Critical 744.0 4,693.8 65,793.8 6.

Reactor Reserve Shutdown Hours -,

7.

Hours Generator was On-line 744.0 4,627.1 64,915.3 8.

Unit Reserve Shutdown Hours 9.

Gross Thermal Energy Generated (MWH) 2,514,659 15,397,374

'214,425,851

10. Gross Electrical Energy Generated (MWH) 821,230 5,041,140 71,461,920
11. Net Electrical Energy Generated (MWH) 783,360 4,798,121 68,108,566
12. Reactor Service Factor 100.0 80.5 84.0
13. Reactor Availability Factor 100.0 80.5 84.0
14. Unit Service Factor 100.0 79.4 82.9
15. Unit Availability Factor 100.0 79.4 82.9
16. Unit Capacity Factor (using MDC) 9'7.9 76.5 80.9
17. Unit Capacity Factor (Using DER) 95.4 74.5 78.8
18. Unit Forced Outage Rate 0.0 0.7 3.3 i

1.

l

OPERATING DATA REPORT '

DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: - SEPTEMBER,1994 COMPLETED BY: ' T.S. BECKER TELEPHONE: 504-739-6683 OPERATING DATA REPORT (Cont 19.

Shutdowns Scheduled over next 6 Months (type, date and duration of each):

N/A 20.

If Shutdown at end of report period, estimated date of startup:

21.

Unit in Commercial Operation THIS MONTH YR TO DATE CUMULATIVE

22. Hours in Reporting Period 744.0 5,831.0 78,336.0
23. Unit Forced Octage Hours 0.0 31.5 2,210.2 24.

Nameplate Rating (Gross MWe): 1200 25.

If Changes Occur in Capacity Ratings (items Number 2 and 24) Since Last Report, Give Reasons: N/A e

i i


J

.~

AVERAGE DAILY UNIT POWER LEVEL ~

DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: SEPTEMBER,1994 COMPLETED BY:

T.S. BECKER TELEPHONE: 504-739-6683 MONTH AUGUST.1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NET)

(MWe-NET) 1 1058 17 1056 2-1057 18 1056 I

3 1058 19' 1053 4

1061 20 971 5

1060 21 1051 6

1060 22 1051 7

1059 23 1048 8

1059 24

-1051 9

1059 25 1054 f

10 1059 26 1043 11 1058 27 1055 l

l 12 1058 28 1056 i

13 1057 29 1056 1

14 1057 30 1057 15 1056 31 1053 l

16 1056 l

1 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

i

a 4

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER: 50-382 UNIT NAME-WATERFORD 3 DATE OF REPORT: SEPTEMBER 1994 COMPLETED BY:_._ T.S. BECKER TELEPHONE-504-739-6683 REPORT FOR AUGUST.1994

. Type

' Method of Shutting F = Forced Duration -

Down the Reactor or Cause, Comments and Number Date S = Scheduled (Hours)

Reason (1) -

Reducina Power (2)

Corrective Actions -

NONE

(

.t (1) REASON (2) METHOD :.

l A=

. Equipment Failure (explain)

' 1. =

Manual B=

Maintenance or Test 2=

Manual Scram C=

Refueling 3=.

D=

Regulatory Restriction 4=

. Automatic Scram Continuation from Previous Period E=

Operator Training and 5=.

Power Reduction License Examination 6=

. Other (explain)

F=

Administrative.

G=

Operational Error (explain)

H=

. Other(explain) 1

- -