ML20072U214

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in IE Insp Repts 50-424/83-04 & 50-425/83-04.Corrective Actions:Spec X2AP01 Revised to Clarify Cold Weather Requirements & Procedure CD-T-02 Revised to Detail Concrete Requirements
ML20072U214
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/22/1983
From: Foster D
GEORGIA POWER CO.
To: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20072U194 List:
References
GN-222, NUDOCS 8304110247
Download: ML20072U214 (2)


Text

~

  • NbO bh.f b

^

Georgia Power Comoany Post Offee Box 4545 Atlanta, Georgia 30302

] jyD 28 AH : 06 Vogtie Project Telephone 404 526-6526 March 22, 1983 United States Nuclear Regulatory Commission Office of Inspection and Enforcement

-Region II - Suite 3100 101 Marietta Street File: X78G10-Atlanta, Georgia 30303 Log:

GN-222

Reference:

50-424/83-04 50-425/83-04 Attention:

R. C. Lewis Gentlemen:

The Gecrgia Power Company wishes to submit the following infor-mation concerning the violation discussed in your inspection report 50-424/83-04 and 50-425/83-04.

We concur with the violation concerning improper (.oncrete cold weather protection.

During the placement of A-093-007 adequate housing was provided for weather protection; however, during the hours following, wirids damaged the weather protection and the remaining parts of the housing were removed.

Eight to ten hours passed before;the responsible Georgia Power Company personnel were'infonned that the protection had been removed.

Immediate action was then taken to protect the concrete.

As a result of an inspection' conducted January 18 through January 21,.

1983 the failure to comply with specification X2AP01 was reported on a deviation report and evaluated by_ engineering.

To prevent reoccurrence, specification X2AP01 was revised to clarify cold weather requirements and procedure CD-T-02 was revised to incorporate more detailed requirements for cold weather concreting.

~

Full compliance was achieved February 21, 1983.

8304110247 830329 PDR ADDCK 05000424 O

PDR u

- = -.

a U. S. Nuclear Regulatory Commission Atlanta,. Georgia - 30303 March 22, 1983 Page Two This response contains no proprietary-information and may be placed in the NRC'Public Document Room upon receipt.

Yours truly, M

fL.

. Foster CWH/D0F/ dab xc:

U. S. Nuclear Regulatory Commission Attn: Victor J. Stello, Jr., Director l-Office of Inspection and' Enforcement-Washington,-D. C.

20555 R. J. Kelly.

R. E. Conway-G.

F.. Head J. T. Beckham,.Jr.

J. H. Boykin i

D. E. Dutton R. H. Pinson D. L.'McCrary

+

R. A. Thomas J. A. Bailey

'0.

Batum H. H. Gregory, III E. D. Groover

~L. T. Gucwa M. Malcom-C. R. Miles,; Jr.

M. Manry R. W. Staffa J. L..Vota W.JF.< Sanders 4

x

_