Provides Notification of Steam Generator Tube Plugging During Unit 2 Cycle 6 Refueling Outage,Per TS 4.4.5.5.a.Rept of Results of Insp Will Be Submitted by 950824.Summary of Tube Plugged in Unit 2 During Outage Encl
ML20072U201
Person / Time
Site: Sequoyah 
Issue date: 09/07/1994
From: Shell R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9409160164
Download: ML20072U201 (5)


Text

.

4 A

Tennessee Vahey Aumonfy Post 0+'rce Box 2000 Soddy-Daisy Tennessee 37379 September 7, 1994 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of

)

Docket No. 50-327 Tennessee Valley Authority

)

SEQUOYAH NUCLEAR PLANT (SQN) - UNIT 2 STEAM GENERATOR (S/G) TUBE PLUGGING As required by SQN Technical Specification 4.4.5.5.a, this submittal provides notification of S/G tube plugging during the Unit 2 Cycle 6 refueling outage.

The in-service inspection of the S/G tubes was completed on August 24, 1994. TVA will submit a special report of the I

results of this inspection on or before August 24, 1995.

Enclosed is a summary of the tubes plugged in Unit 2 during this outage.

Please direct questions concerning this issue to D. V. Goodin at (615) 843-7734.

Sincerely, An.JM R. H. Shell Manager i

l SQN Site Licensing l

Enclosure cc: See page 2 i

i i

l

-ns\\'OG l

9409160164 940907 i

PDR ADOCK 05000327 f

P PDR l

Ol 4

~._.

n q

j I

U.S. Nuclear Regulatory Commission j

_ Page 2 September 7, 1994 1

Enclosure

(

cc (Enclosure):

Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident. Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road i

Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region II

'101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 l

l l

m

--m v

w w

_q l

O d

e ENCLOSURE SEQUOYAH NUCLEAR PLANT UNIT 2 CYCLE 6 REFUELING OUTAGE STEAM GENERATOR TUBE PLUGGING

SUMMARY

(S57 940902 941)

Unit 2 Cycle 6 S/G ROW COL LOCATION REASON FOR PLUGGING 1

1 16 sal H07+7.11 U-BEND PWSCC 1

26 sal H07+7.04 U-BEND PWSCC 1

36 SAI H07+2.87 U-BEND PWSCC 1

38 sal H07+2.79 U-BEND PWSCC 1

45 sal H07+6.84 U-BEND PWSCC 1

55 SAI H07+2.89 U-BEND PWSCC 1

61 SAI H07+2.81 -

U-BEND PWSCC 1

72 SAI H07+2.95 U-BEND PWSCC 1

74 SCI H07+5.62 U-BEND PWSC,0 SCI H07+5.98 U-BEND PWSCC SCI H07+7.19 U. BEND PWSCC 1

85 sal H07+3.03 U-BEND PWSCC -

SCI H07+ 5.33 U-BEND PWSCC SOI H07+ 5.00 U-BEND PWSCC 1

87 sal H07+2.80 U-BEND PWSCC f

1 88 SAI H07+3.30 U-BENn PWSCC SCI H07+5.31 U-BEND PWSCC 1

90 sal H07+3 00 U-BEND PWSCC 1

92 SAI H07+7.09 U-BEND PWSCC 2

1 2

sal H07+7,16 U-BEND PWSCC 1

11 SAI H07+2.56 U-BEND PWSCC 1

19 SAI H07+2.87 U-BEND PWSCC 1

32 sal H07+2.80 U-BEND PWSCC I

SA!

H07+ 2.91 U-BEND PWSCC 1

39 SAI H07+2.S8 U-BEND PWSCC 1

42 SA!

H07+2.50 U. BEND PWSCC 1

49 MAI H07+2.87 U-BEND PWSCC 1

50 SCI H07+5.19 U-BEND PWSCC SCl H07+6.33 U-BEND PWSCC 1

51 MA1 H07+ 7.15 U-BEND PWSCC 1

52 SCI H07+6.17 U BEND PWSCC 1

53 mal H07+7.60 U-BEND PWSCC 1

63 sal H07+7.16 U-BEND PWSCC 1

65 SAI H07+7.10 U-BEND PWSCC l

1 67 SCI H07+4.01 U-BEND PWSCC 1

68 SCI H07+5.25 U-BEND PWSCC 1

7S sal H07 + B.2B U-BEND PWSCC 1

79 sal H07+8.21 U-BEND PWSCC 1

80 sal H07+2.95 U-BEND PWSCC I

1 86 sal H07+7.48 U-BEND PWSCC 1

87 sal H07+2.76 U-BEND PWSCC 1

89 sal H07+7.23 U-BEND PWSCC SAI H07+ 5.10 U-BEND PWSCC 1

93 SCI H07+7.19 U-BEND PWSCC

]

SCl H07+6.83 U-BEND PWSCC SCI H07+6.43 U BEND PWSCC 3

44 sal HTS 1.02 TTS PWSCC 7

59 SAI HTS-1.47 TTS PWSCC 8

49 sal HTS-1.14 TTS PWSCC 8

53 SAI HTS.92 TTS PWSCC 8

57 SAI HTS-1.45

TS PWSCC 8

59 sal HTS.22 TTS PWSCC 8

63 SAI HTS-1.80 TTS PWSCC

,.w

l Staam Generator (S/G) Tube Plugging List

+

Sequoyah Nuclear Plant und 2 Cycle 6 S/G ROW COL LOCATION REASON FOR PLUGGING 1

l 2

8 66 SAI HTS.93 TTS PWSCC 8

75 SAI HTS.96 TTS PWSCC 12 19 SAI HTS-1.43 TTS PWSCC 16 73 SAI HTS.10 TTS PWSCC 21 37 61 H01 +42.53 OD INDICATION 22 38 sal HTS.75 TTS PWSCC

' 24 67 41 AV2 14 AVB WEAR i

42 AV3.29 AVB WEAR 25 54 sal HTS.96 TTS PWSCC 32 SS 40 AV3.18 AVB WEAR 34 64 41 AV2+.00 AVB WEAR 3

1 1

SAI H07+2.62 U-BEND PWSCC l

1 7

MAI H07+7.30 U-BEND PWSCC

)

1 13 sal H07+7.37 U-BEND PWSCC l

1 14 SAI H07+7.36 U-BEND PWSCC i

1 32 SAI H07+3.74 U-BEND PWSCC l

1 34 SAI H07+4.16 U BEND PWSCC l

1 35 SAI H07+3.53 U-BEND FWSCC l

1 43 SCI H07+7.48 U-BEND NWSCC 1

44 SCI H07+7.46 U-BEND PWSCC i

6 51 sal H01 +.09 TSP ODSCC 8

54 sal H01 +.17 TSP ODSCC 13 8

SAI H01 +.19 TSP ODSCC 14 50 SA!

HTS-1.03 TTS PWSCC j

17 30 MAI H01 +.19 TSP ODSCC 19 7

sal H01 +.19 TSP ODSCC 23 21 SAI HTS.39 TTS PWSCC 23 28 SAI '

HTS-1.17 TTS PWSCC i

32 16 48 C01 +.00 C/L WASTAGE 44 62 39 C01.24 C/L WASTAGE 45 36 42 C01.05 C/L WASTAGE 4

8 46 SAI H01 +.23 TSP ODSCC 28 69 sal H01 +.17 TSP ODSCC TOTALS S/G 1 - 14 S/G 2 - 39 S/G 3 20 S/G 4 - 2 DEFINITIONS AV2 Second anti-vibration bar above hot leg ODSCC Outside Diameter Stress Corrosion AV3 Third anti-vibration bar above hot leg PWSCC Primary Water Stress Corrosion Cr C01 First support plate - cold leg sal Single AxialIndication H01 First support plate - hot leg SCI Single Circumferentia: Indication i

H07 Seventh support plate - het leg TSP Tube Support Plate

(

HTS Top of tubesheet - hot leg TTS Top of Tubesheet j

mal Multiple Axia!Indicatens l

l

.