ML20072T247
| ML20072T247 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 08/22/1994 |
| From: | Schnell D UNION ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| ULNRC-3056, NUDOCS 9409150127 | |
| Download: ML20072T247 (3) | |
Text
.- _ __.
1901 Chouteau Avenue 0
Post Off:ce Box 149 St Louis, Missouri 63166 s
314 554-2650 P 867 526 087 UNION Donald F. Schnelt senior wee presiaent ELECTRIC
- nuees, 33 August 22,1994 ULNRC - 3056 U. S. Nuclear Regulatory Commission Document Control Desk Mail Station PI-137 l
Washington, DC 20555 l
DOCKET NUMBER 50-483 l
CALLAWAY PLANT UNIT I l
FACILITY OPERATING LICENSE NPF-30 I
PilYSICAL SECURITY PLAN l
Pursuant to the requirements of 10 CFR 50.54 (p), Union Electric Company is advising the Nuclear Regulatory Commission of changes within the Security Organization at the Callaway Plant that are contained within the Physical Security Plan. The positions of Security Administrative Supervisor and Security System Coordinator have been eliminated. The Security System Coordinator primary responsibilities were assigned to Union Electric Engineering personnel. The responsibilities of the Security Administrative Supervisor were reassigned to other Security Department personnel. These changes are consistent with 10 CFR 50.54 (p) and l
do not decrease the level of security effectiveness. The next revision of our Security Plan will reflect these changes.
If you have any questions regarding this information, please contact D. T. Fitzgerald or J. A. Clark, '(314)676-8300.
l Very truly yours, i
i 7-l
/* < Donald F. Schnell Senior Vice President, Nuclear i
i DFS/DTF:ajf 0 t$j 0C 5 O,3 I 6 9409150127 940822 PDR ADOCK 05000483 F.
l i
cc:
J. B. Martin, Regional Administrator (2 copies)
U. S. Nuclear Regulatory Commission Region III 801 Warrenville Road Lisle, IL 60532-4351 B. L. Bartlett /D. R. Calhoun Resident NRC Inspector, Callaway Plant Callaway Resident Office U. S. Nuclear Regulatory Commission Rural Route #1 Steedman, MO 65077 Mr. L. R. Wharton (2 copies) t Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 13-E-21 Washington, DC 20555 M. J. Farber Chief, Reactor ProjectsSection III A U. S. Nuclear Regulatory Commission Region III i
801 Warrenville Road Lisle, IL 60532-4351 1
Missouri Public Service Commission i
Manager, Electric Department P. O. Box 360 Jefferson City, MO 65102 l
Shaw, Pittman, Potts, & Trowbridge 2300 N Street, NW.
Washington, DC 20037 1
l
~
I l
l bec:
NSRB (S. L. Dale) (470) l E210.0001 Commercial Records DFS Chrono
. G. L. Randolph l
J. V. Laux/C. E. Slizewski Licensing and Fuels (470)
- A. C. Passwater
- D. E. Shafer T. P. Sharkey DTF Chrono l
A160.0761 (Q. A. Records)
M. P. Barrett (100) l l-l Steve Wideman l
Supervisor, Licensing l
Wolf Creek Operating Corporation
- P. O. Box 411:
i Burlington, KS 66839 i
1 I
b l
j
. _, _.