Interim Deficiency Rept Re Use of High Stress Stamp on ASME Fittings (Item M-33).Const Work Authorization Request Will Be Submitted Requesting Permission to Blend Grind High Stress Stamps.Next Rept Will Be Provided by 830715
ML20072S763
Person / Time
Site: Zimmer
Issue date: 03/29/1983
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, LOZ-83-0006, LOZ-83-6, NUDOCS 8304070328
Download: ML20072S763 (2)


Text

e THE CINCINNATI GAS & ELECTRIC COMPANY CINCINNATI, OHIO 45201 March 29, 1983

c. A. sonouAnn LOZ-83-0006 SENION vlCE PRESIDENT Docket No. 50-358 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Attention:

Mr. J.G.

Keppler Regional Administrator i

Gentlemen:

RE:

WM. H.

ZIMMER NUCLEAR POWER STATION - UNIT 1 10CFR50.55(e) - ITEM M USE OF HIGH STRESS STAMP ON ASME FITTINGS W.O. 57300, JOB E-5590, FILE NO. 956C, M-33 This letter constitutes an interim report concerning the subject condition, initially reported to the NRC as 10CFR50.55(e), Item M-33.

The QCP has completed its walkdown of fittings identified as j

having a high stress stamp applied.

Eighteen (18) fittings have been identified with indications of having high stress stamps applied.

A Construction Work Authorization Request (CWAR) is being l

prepared for submittal to the NRC requesting permission to blend grind these indicated high stress stamps under the November 12, 1982 "Show Cause Order and Immediately Suspending Construction".

l The blend ~ grinding should be complete approximately two months after NRC work authorization is received in this area.

To assure that all fittings under Purchase Order 17070-11999 have been addressed, a complete documentation review is being accomplished by Task III of the Zimmer Quality Confirmation Program.

A follow-up report will be submitted by July 15, 1983.

@DO4070328 830329 APR 41983 PDR ADOCK 05000358 PDR LM7 S-

\\

-a Mr. J.G. Kspplor Regional Administrator March 29, 1983 LOZ-83-0006 Page 2 We trust the above will be found acceptable as an interim report under 10CFR50.55 (e).

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY

-:=--

E.A. BORGMANN SENIOR VICE PRESIDENT FHS/ HRS /bcf cc: NRC Office of Inspection & Enforcement Washington, D.C.

20555 NRC Senior Resident Inspector Attn:

W.F. Christianson Zimmer Project Inspector Region III I