ML20072S740

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Mounting of Electrical Equipment Foundation & Welding Quality.Initially Reported on 830104. Essential Panel Installations Will Be Reinspected for Compliance W/Design Document.Followup Rept by 830630
ML20072S740
Person / Time
Site: Zimmer
Issue date: 03/25/1983
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, LOZ-83-0010, LOZ-83-10, NUDOCS 8304070318
Download: ML20072S740 (2)


Text

(.- -

THE CINCINNATI GAS & ELECTRIC COMPANY M

CINCf NNAT1, OHIO 45E01 s

March 25, 1983 ca.nonouaun

.c,. o. v,cc

..oc,a LOZ-83-0010 I

l Docket No.'50-358-U. S.~ Nuclear Regulatory Commission Region III L

799 Roosevelt Road e

Glen Ellyn, IL 60137 Attention:

Mr. J. G. Keppler Regional Administrator

[

Gentlemen:

RE:

WM. H. ZIMMER NUCLEAR POWER STATION - UNIT 1 l

10CFR50. 55 (e), ITEM E-35, ELECTRICA.L EQUIPMENT FOUNDATION WELDING W.O. 57300, JOB E-5590, FILE NO. 956 C, E-35 This letter constitutes a follow-up to our interim report, OA-2224, dated January 31, 1983, concerning the subject condition initially reported to the Commission on January 4, 1983 as a potentially reportable deficiency under the requirements of 10CFR50.55(e).

As initially reported,' concerns were identified in the mounting of electrical panels related to configuration, weld

. quality, and weld procedure qualification.

Since the weld procedure qualification concern is being addressed by L.

10CFR50.55(e), Item M-29, it is our intent to address the-concerns with electrical panel mounting configuration and weld quality in Item E-35.

Evaluation of the conditions found during a surveillance of the electrical panels by Henry J. Kaiser Co. and Cincinnati Gas &

Electric Company personnel indicates the need to reinspect all.

essential' panel installations for compliance with design document requirements.

This reinspection effort is expected to be completed by June 30, 1983 at which time a follow-up report will be submitted.

8304070318 83032S PDR ADOCK 0S000338 APR 4

Q}

S PDR

+ -- Mr. J.G. Keppler Regional Administrator March 25, 1983 LOZ-83-0010 Page 2 We trust the above will be found acceptable as an interim report under 10CFR50.55 (e).

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY

^

By

~--

E. A. BORGMANN SENIOR VICE PRESIDENT RNT/GNW/cse cc: NRC Office of Inspection & Enforcement Washington, D.C 20555 NRC Senior Resident Inspector Attn:

W.F. Christianson NRC Zimmer Project Inspector Region III t

- -. -.,