l* **%g lt UNITED STATES p*
g, j
NUCLEAR REGULATORY COMMISSION t
WASHINGTON. D.C. 20555 4001
%q.....p o
DUQUESNE LIGHT COMPANY OHIO EDIS0N COMPANY PENNSYLVANIA POWER COMPANY DOCKET NO. 50-334 BEAVER VALLEY POWER STATION. UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.182 License No. DPR-66 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Duquesne Light Company, et al. (the l
licensee) dated June 9, 1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; l
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in-compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and l
E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regult.tions and all applicable requirements have been satisfied.
ADOCK0500034['
94o9140200 94o90s DR
. 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-66 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.182, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance, to be implemented within 60 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Walter R. Butler, Director Project Directorate I-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
September 8, 1994
e
-(TACHMENT TO LICENSE AMENDMENT N0.182 FACILITY OPERATING LICENSE NO. DPR-66 DOCKET NO. 50-334 Replace the following pages of Appendix A Technical Specifications, with the enclosed pages as indicated.
The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.
Remove Insert 3/4 8-4 3/4 8-4
a DPR-66
' ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 5.
Verifying the diesel generator operates for 2 60 minutes while loaded to 2 2750 kw.
6.
Verifying that the auto-connected loads to each diesel generator do not exceed the 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> rating of 2850 kw.
7.
Verifying that the automatic load sequence timer is OPERABLE with each load sequence time within 10% of its required value.
c.
Check for and remove accumulated water:
1.
From the day tank, at least once per 31 days and after each operation of the diesel where the period of operation was greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and P
2.
From the fuel oil storage tank, at least once per 92 days.
d.
By sampling new fuel oil in accordance with ASTM D4057-81 prior to addition to the storage tanks and:
1.
By verifying in accordance with the tests specified in ASTM D975-81 prior to addition to the storage tanks that the sample has:
a)
An API Gravity of within 0.3 degrees at 60'F or a specific gravity of within 0.0016 at 60/60*F, when compared to the supplier's certificate or an absolute specific gravity at 60/60*F.of greater than'or equal to 0.83 but less than or equal to i
0.89 or an API gravity at 60'F of greater than or equal to 27 degrees but less than or equal-to 39
- degrees, b)
A kinematic viscosity at 40*C of greater than or equal to 1.9 centistokes, but less than or equal to 4.1 centistokes, if gravity was not determined
-l by comparison with the supplier's certification, i
c)
A flash point equal to or greater than 125'F, d)
-A water and sediment content of less than or i
equal to 0.05% when tested in accordance with ASTM D1796-83, and e)
A total particulate contamination level of less than 10 mg/ liter when tested in accordance with ASTM D2276-78, Method A.
BEAVER VALLEY - UNIT 1 3/4 8-4 Amendment No.182
,\\
[ht
- "'0%g g
l*,
UNITED STATES g
,g NUCLEAR REGULATORY COMMISSION
's WASHINGTON, D.C. 20555-0001 DV0VESNE LIGHT COMPANY OHIO EDISON COMPANY THE CLEVELAND ELECTRIC ILLVMINATING COMPANY THE TOLEDO EDISON COMPANY DOCKET N0. 50-412 BEAVER VALLEY POWER STATION. UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 63 License No. NPF-73 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Duquesne Light Company, et al. (the licensee) dated June 9, 1994, complies with the standards and
]
requirements of the Atomic Energy Act of 1954, as amended (the Act) i and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
I
d
. t 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-73 is hereby amended to read as follows:
(2) Technical Soecifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 63, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto are hereby incorporated in the license.
DLC0 shall operate the. facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of its issuance, to be implemented within 60 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION 1
Walter R. Butler, Director Project Directorate I-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: September 8, 1994
}
d ATTACHMENT TO LICENSE AMENDMENT NO. 63 FACILITY OPERATING LICENSE NO. NPF-73 DOCKET NO. 50-412 Replace the following pages of Appendix A, Technical Specifications, with the enclosed pages as indicated. The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.
Remove Insert 3/4 8-4 3/4 8-4 3/4 8-5 3/4 8-5
NPF-73 ELECTRfCAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 5.
Verifying the diesel generator operates for at least 60 minutes while loaded to 2 4,238 kw.
6.
Verifying that the auto-connected loads to each diesel generator do not exceed the 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> rating of 4,535 kw.
7.
Verifying that the automatic load sequence timer is OPERABLE with each load sequence time within 10% of its required value.
c.
Check for and remove accumulated water:
1.
From the day tank, at least once per 31 days and after each operation of the diesel where the period of operation was greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and 2.
From the fuel oil storage tank, at least once per 92 days.
d.
By sampling new fuel oil in accordance with ASTM D4057-81 prior to addition to the storage tanks and:
1.
By verifying in accordance with the test specified in ASTM D975-81 prior to addition to the storage tanks that the sample has:
a)
An API Gravity of within 0.3 degrees at 60*F or a specific gravity of within 0.0016 at 60/60"F, when compared to the supplier's certificate or an absolute specific gravity at 60/60*F of greater than or equal to 0.83 but less than or equal to 0.89 or an API gravity at 60*F of greater than or equal to 27 degrees but less than or equal to 39
- degrees, b)
A kinematic viscosity at 40*C of greater than or equal to 1.9 centistokes, but less than or equal to 4.1 centistokes, if gravity was not determined by comparison with the supplier's certification, c)
A flash point equal to or greater than 125"F, d)
A water and sediment content of less than or equal to 0.05% when tested in accordance with ASTM D1796-83, and BEAVER VALLEY - UNIT 2 3/4 8-4 Amendment No. 63
NPF-73 ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) e)
A total particulate contamination level of less than 10 mg/ liter when tested in accordance with ASTM D2276-78, Method A.
2.
By verifying within 31 days of obtaining the sample that the other properties specified in Table 1 of ASTM D975-81 are met when tested in accordance with ASTM D975-81 except that the analysis for sulfur may be performed in accordance with ASTM D1552-79 or ASTM D2622-82.
e)
At least once every 31 days by obtaining a sample of fuel oil from the storage tanks and day tanks in accordance with ASTM D2276-78, and verifying that total particulate contamination is less than 10 mg/ liter when checked in accordance with. ASTM D2276-78, Method A.
f)
At least once per 10 years or after any modifications which could affect diesel generator interdependence by starting **
both diesel generators simultaneously, during shutdown, and verifying that both diesel generators accelerate to at least 514 rpm in less than or equal to 10 seconds.
g)
At least once per 10 years by:
1)
Draining each main fuel oil storage tank, removing the accumulated sediment, and cleaning the tank using a sodium hypochlorite solution or other appropriate cleaning solution, and 2)
Performing a pressure test, of those portions of the diesel fuel oil system designed to Section
- III, subsection ND of the ASME Code, at a test pressure equal to 110% of the system design pressure.
This test shall be conducted in accordance with the manufacturer's recommendations regarding engine prelube and warmup procedures, and as applicable regarding loading recommendations.
BEAVER VALLEY - UNIT 2 3/4 8-5 Amendment No.63 l