Interim Deficiency Rept Re Masking of Radiography by Inadequate Surface Preparation.Intially Reported on 820520. Approx 600 Weld Radiographs Unreviewed.Completion Scheduled by 830419.Final Rept Expected by 830430
ML20072S646
Person / Time
Site: Zimmer
Issue date: 03/28/1983
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, LOZ-83-0011, LOZ-83-11, NUDOCS 8304070274
Download: ML20072S646 (2)


Text

e fo A

4 2

~

'S s

if eh m

THE CINCINNATI GAS &. ELECTRIC COMPANY sak CINCINN ATi, OHIO 452Of March 28, 1983 LOZ-83-0011 E. A. BORG M AN N SENCR VICE PRESIDENT Soc <et f.o.

50-358 U.S. Nuclear Regulatory Commission c egion III 779 Coosevelt Road Glen Ellyn, IL 60137 Attention:

Mr.

J.G. Keppl e r Regional Administrator Gen tl emen:

RE:

WM.

H.

ZIMMER NUCLEAR POWER STATION - UNIT 1 10CFR50.55(e) - ITEM M MASKING OF RADIOGRAPHY SY INADEQUATE SURFACE PREPARATION w 92_513991_J9a_E:55291_EILE_Ng3_256Cy_tj-50 z

.This letter constitutes an interim report concerning the subject condition initiall y reported to the Commission on May 20, 1982 as a reportable deficiency under the requirements of 10CFR50.55(e).

Since our previ ous report, QA-2160, dated December 20, 1982, considerable progress has been made.

To date, 2495 weld radiographs have been reviewed and Nonconformance Reports initiated for resolution of those welds with identified problems.

I j

Review of the remaining weld radiographs, approximately 600, is continuing, but has been delayed due to the manpower furnished t

to support the NRC Joint Evaluation Team and the National Board of Loiler Inspectors.

The review is now schedul ed for completion by April 19, 1983, and a f oll ow-up report will be submitted by April 30, 1983.

A Construction Work Authorization Request (CWAR) is being L

prepared to obtain approval to bl end grind and reradiograph.those welds with inadequate surface preparation.

Completion of this activity and implementation of any further corrective action is contingent upon the NRC's approval of the CWAR or release of the NRC November'12, 1982 " Order to Show Cause and Order Immediately Suspending Construction".

830407027d 830328 PDR ADOCK 05000358

~

9 S

PDR

/

APR 41993

.r o 3

6 r.1J.G. K,e ppl e r w

Regional Administrator March 28, 1983 LOZ-83-0011' Doge 2 We' trust th'e 'above will be. found acceptable as an interim report under 10CFR50 55(e).

Very trul y yours, THE CINCINNATI GAS E ELECTRIC COFPANY By e,c E.A.

BORGMANN SENIOR VICE PRESIDENT l