Monthly Operating Rept for Mar 1991 for Farley Nuclear Plant Unit 1
ML20072S566
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 03/31/1991
From: Dennis Morey, Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9104160349
Download: ML20072S566 (5)


Text

...

AJabama Power Company g.,

--.40 inverness center Parkway :

Post 0%ce Boi 1295 -

Dirming'wn. A!atama 35201

  • Teiephone 205 BCS 5086 -

J. D. Woodard

--Alabama Power i

Vce Presdent-Nociear

']

Fariey Proact.

April 11, 1991-guounddd esnrern i

i Docket No. 50-348 U. S. Nuclear Regulatory Commission ATTN:- Document Control Desk Washington, D. C.

20555 Joseph.ML Farl'ey Nuclear Planti Unit 1 Monthlv Operatina Data Report-Attached is the March 1991 Monthly Operating Report for-Joseph' M. Farley Nuclear Plant Unit 1, as required by Section 6.9.1.10 of the Technical-Specifications.

If you have any questions, please advise.

Respactfully submitted,

?!

%\\h J,

. Woodard AEJ:edb3014

- Attachments cc: Mr. S. D. Ebneter Mr. S. T. Hoffman Mr. G.-F. Maxwell 8

em y

\\

. JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS March', 1991' The unit was shutdown at 2338 on llarch 8 for the' cycle 10-11 re' fueling outage.

There were no other-unit shutdowns or significant power reductions during the month of March.

The following major safety-related maintenance was' performed during the month of March:

1 1.

The reactor was defueled. Visual inspection and ultrasonic inspection of the fuel was completed. Two leakingLfuel' rods were detected in a fuel assembly that was scheduled for reload.

This1 fuel assembly will not be reloaded.

2.

The control rods were inspected for wear and all were found to be acceptable for reuse.

3.

Miscellaneous corrective and preventive-maintenance'was! performed on'the-diesel generators.

4.

One leaking tube was plugged in IB -spent fuel pool heat ' exchanger.

5.

Various safety related check-valves andLmotor operated valves were inspected.

6.

"A" residual heat removal pump motor was disassembled -and the: lower bearing housing cap was resecled.

7.

A leak was repaired in the "A" train control room air-conditioning.

1

- }:

(

5

'I L_

OPERATING DATA REPORT-DOCKET No. 50-348 DATE April 3, 1991 COMPLETED BY D N. Morey TELEPHONE - ( 205)B99-5156 OPERATING STATUS

~ K6tes

1. Unic Name:

Joseph H. Farley - Unit 1

1) Cumulative cata since

~

2. Reporting Period:

March, 1991 12-1-77, date of

3. Licensed Thermal Fover (HVt):

2,652

-commercial operation.=

4. Nameplate Rating (Gross HVe):

860-

5. Design Electrical Rating-(Net MVe):

829

6. Maximum Dependable Capacity (Gross MVe):

856.4

7. Maximum Dependable Capacity (Net.HVe):

814.0

, 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A

9. Power Level To Which Restricted, If Any (Net HVe) -

N/A 4

10. Reasons For Restrictions, If Any:

N/A i

This Month Yr-to-Date Cumulative-

11. Hours In Reporting Period 744 2160 116,856
12. Number Of Hours Reactor Vas Critical 191.9 1607.9 90,562.2
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
14. Hours Generator On-Line 191.6 1607.6 88,999.3
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (HVH) 488,986 4,239,243 227,873,224
17. Gross Electrical Energy Generated (HVH) 158,290 1,379,648

-73,429,986

18. Net Electrical Energy Generated (HVH) 144,730 1,305,586 69,309,118
19. Unit Service Factor 25.8 74.4 76.2
20. Unit Availability Factor 25.8

~7373-76.2

21. Unit Capacity Factor (Using HDC Net) 23.9 74.3 73.4
22. Unit Capacity Factor (Using DER Net) 23.5 72T7-71.6
23. Unit Forced Outage Rate 0.0 0.0 7.3
24. Shutdowns Scheduled Over Next 6 Honths (Type, bate, and Duration of Each):
25. If Shut Down At End:0f' Report Period, Estimated Date of Startup:

Hay 18, 1991-

26. Units I6 Test Status (Prior to Commercial Operation):

Forecast Achieved l-INITIAL CRITICALITY 08/06/77 08/09/77 INITIAL ELECTRICITY

-08/20/77 08/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77 l

l Form 2/34

l i

DOCKET NO.

50-348 UNIT 1

DATE Aprli 3, 1991 COMPLETED BY D. N. Morey TELEP!10NE (205)899-5156 MONTH Harch DAY AVERAGE DAILY POVER LEVEL DAY AVERAGE DAILY POVER LEVEL (MVe-Net)

(HVe-Net) 1 817 17 0

2 811 18 0

3 818 19 0

4 813 20 0

5 803 21.

0 6

788 22 0

7 788 23-0 8

617 24 0-9 0

25 0

10 0

26 0

11 0

27 0

(

12 0

28 0

13 0

29 0

14 0

30 0

1 1~

15 0' 0 16 0

i -

INSTRUCTIONS l

On this format, list the average daily unit power level-in HWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

Form 13/21

tE7IT SPUTDOWts A C POWER REZ3ITIGts DCITIT No.

50-349 (NIT E:AME J. M. FRPlEY - tNIT 1 E2rt April 3, 1991 CITtPLETED BT D. N. MDPIT PIPCRT MONTH MARG TEIEFHONE (2051899-5156 I

I I

I I

i MErno or i1:ceNsEE I I

I cmsE a _mm I

t, * -

1, I,

i i

1 i DuRATroN 1 I smnrzm i Everr i srsTm.

Acrrom m

,,,s

,,,,,cy,,,,,

l n.

IrarE I TrrE I ocuRs)

I nEAsm2 ; y,,,,c,o,3,,,,,,,,,,,

2 l001 l 910308 l

S l

552.4 l

C l

1 l

N/A l N/A l

N/A l Unit was taken off line for the Cycle 10-11 l

l l

1 I

I I

I I

I Irecu.un,outase.

I I

I I

I I

I I

i l

I i

i i

l I

I i

i I

i i

I I

I I

I I

I I

I I

I I

l l

l 1

1 I

I I

I I

I I

I I

l i

I I

I I

I I

I I

I I

I i

i i

I I

I I

I l

l 1

I i

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I i

i i

i i

i i

l i

l l

I l

l l

1 1

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

i 1

1 I

I I

-l i

I I

I I

I I

I I

i i

l I

i i

l i

i i

i l

i I

I i

l I

i l

i i

i I

i I

i i

i i

i i

I i

i l

l I

I I

I I

I I

I i

l i

i I

i i

I I

i I

i I

I i

i F: Forced Reason:

Method:

Exhibit G-Instnactions S: Scheduled A-Equipen.t Failure (Explain) 1-Marmal -

for Preparation of Data S-Main'enance or Test 2-4tanual scram.

Entry sheets for Licenseo C-Refueling 3-Automatic Scram.

Event Report (1ZR) File (NOREn-D-Regulatory Restriction 4-other (Exp1 min) 0161)

E-Operator Training & License Examination F-Adm nistrative Exhibit I -Same Source G-Operational Error (Explairl S-Other (Explain)

._...,__.m,.

m