ML20072S306
| ML20072S306 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 02/22/1983 |
| From: | Hudspeth J ALABAMA POWER CO. |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20072S298 | List: |
| References | |
| NUDOCS 8304070075 | |
| Download: ML20072S306 (1) | |
Text
,
r e
i m
Alabama Power the Southerrt electrC SySitn1 February 22, 1983 N
Director NRR Nuclear Reactor Regulations 2b i
USNRC Phillips Building 7920 Porfolk Avenue Bethe
'a, MD 20014
Dear Sir:
In accordance with Alabama Power Company Administrative Procedure FNP-0-AP-4, Control of Plant Documents and Records, attached are revisions to Emergency Plan Implementing Procedures.
Please verify that you have the procedures with the corres-ponding copy numbers listed on the Document Transmittal Form.
Please sign and return the Transmittal Forms. as soon as possible to the following address:
Alabama Power Company Farley Nuclear Plant Box 470 Ashford, AL 36312 ATTN:
Document Control Supervisor If you should have any questions, please call me at (205) 899-5156 Ext. 422.
Sincerely, 0.lb4
{ogy Bf HUdspeth w' D&ument Cont ol Supervisor JBH:hrc cc:
Larry W.
Enfinger File i 10 8304070075 830331 PDR ADOCK 05000348 F