ML20072R763

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Rev 4 to Emergency Plan Implementing Procedure 1903.42, Duties of Emergency Medical Team
ML20072R763
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 02/25/1983
From:
ARKANSAS POWER & LIGHT CO.
To:
NRC
Shared Package
ML20072R752 List:
References
NUDOCS 8304060314
Download: ML20072R763 (2)


Text

h'i a

s ARKANSAS POWER & LIGHT COMPANY

~

l-A'rkansas Nuclear One TITLE: TRANSMITTAL FonM No. 1013.02H REV. # 12 FC #

Arkansas Nuclear One

~

Russellville, Arkansas

, ~7 I 3 j

Date February 25, 1983 O

J MEMORANDUM TO:

/03. f()$ d FROM:

ANO DOCUMENT CONTROL

SUBJECT:

ANO MASTER PLANT MANUAL UPDATE PROCEDURE NUMBER 1903.50 REV. #

5 PC #

TC #

PROCEDURE TITLE EMERGENCY RESPONSE ORGANIZATION PROCEDURE NUMBER REV. #

PC #

TC #

PROCEDURE TITLE PROCEDURE NUMBER REV. #

PC #

TC #

PROCEDURE TITLE l

l PROCEDURE (S)'HAS BEEN PLACED IN YOUR SET OF THE PLANT MANUAL.

I PROCEDURE (S) SHOULD BE PLACED IN YOUR SET OF THE PLANT MANUAL.

NOTE:

PLEASE RETURN SIGNED TRANSMITTAL TO DOCUMENT CONTROL - 4TH FLOOR:

SIGNATURE DATE l

LPDATED jo 8304060314 830331 OM.5 kt

(.

PDR ADOCK 05000313 F

PDR u.

ARKANSAS POWER & LIGHT COMPANY g

Arkansas Nuclear One TITLE: TRANSMITTAL FORM NO. 1013.02H REV. # 12 FC #

Arkansas Nuclear One Russellville, Arkansas Date March 3, 1983 MEMORANDUM lOh'Ahk(y & &

To:

0 FROM:

ANO DOCUMENT CONTROL

SUBJECT:

AN0 MASTER PLANT MANUAL UPDATE PROCEDURE NUMBER 1903.42 REV. #

4 PC #

TC #

PROCEDURE TITLE DUTIES OF THE EMERGENCY MEDICAL TEAM PROCEDURE NUMBER REV. #

PC #

TC #

PROCEDURE TITLE PROCEDURE NUMBER REV. #

PC #

TC #

PROCEDURE TITLE l

The following pages of the indicated procedure (s) contains items which involve personal privacy or proprietary material. PLEASE REMOVE THE INDICATED MATERIAL PRIOR TO DISTRIBUTION TO PUBLIC DOCUMENT ROOMS, PROCEDURE (S)

PAGE (S) 1903.42 4

i l

l PROCEDURE (S) HAS BEEN PLACED IN YOUR SET OF THE PLANT MANUAL.

l PROCEDURE (S) SHOULD BE PLACED IN YOUR SET OF THE PLANT MANUAL.

NOTE: PLEASE RETURN SIGNED TRANSMITTAL TO DOCUMENT CONTROL - 4TH FLOOR:

SIGNATURE DATE UPDATED l

1 L

i m

ARKANSAS POWER & LIGHT COMPANY

{

g A

Arkansas Nuclear One OW NO, N 'E' CORD OF CHANGES AND REVISIONS 1000.06A R

EMERGENCYsPLAN PROCEDURE REV. #12 FC #,

Safety Related YES $f NO O

? V' DUTIES OF THE EMERGENCY MEDICAL 1:.Mi

'y REV.3eTIM'}

4

.t

  • h
.3 1903.42 I d < g; g,,e,.
*:.. m., ;,; ;

ig 77 4,g %

s-A. 4, t,-

am; a

t : Ps l Nb $Ed)

~O 4D Nt ' PAGE REV PC#

PAGE REV PC#

PAGE REV PC#

PAGE REV PC#

PAGE REV PC#

32/

1 4

2 4

3 2

4 4

O i

l l

l APPROVAL DATE l

APPROVED BY:

"ggg D:30\\f g/,/g.3 1

/._/,w t g..[ //

REQUIRED EFFECTIVE DATE:

v tr.au,

~,

(General Manager)

L/

s PLANT MANUAL SECTION:

PROCEDURE / WORK PLAN TITLE:

NO:

DUTIES OF THE EMERGENCY FMFRGFMEV PTAM MFDTEAT TFAM 1003.42 PAGE 1 of 4 ARKANSAS NUCLEAR ONE aEvisioN 4

DATE mom n(_,/

~

CHANGE DATE 1.0 PURPOSE The purpose of this procedure is to provide guidance on the responsibilities and duties of the Emergency Medical Team for emergency situations.

2.0 SCOPE This procedure is applicable to personnel emergency situations involving Unit One and/or Unit Two.

3.0 REFERENCES

3.1 References Used in Procedure Preparation:

3.1.1 Arkansas Nuclear One Emergency Plan 3.2 References Used in Conjunction with this Procedure.

3.2.1 1903.10, " Emergency Action Level Response" 3.2.2 1903.23, " Personnel Emergency" 3.2.3 1903.72, "St. Mary's Hospital" 7-g

\\

)

3.2.4 1903.73, "Millard-Henry Clinic" 3.2.5 1903.74, " Pope County Ambulance Service" 3.3 Related ANO Procedures:

3.3.1 1903.22, " Fire and Explosion" 3.3.2 1903.60, " Emergency Supplies and Equipment" l

3.4 Regulatory correspondence containing NRC commitments which are imple-mented in this procedure include:

3.4.1 Letter 0CAN108213, Appendix A, Item 1 A.

Section 5.5 4.0 DEFINITIONS 4.1 Operational Support Center (OSC) - The ANO Administration Building the Emergency Medical Team assembly area should be the First Aid Room (Admin. Bldg. - 2nd floor) and the 2nd floor breakroom.

l 4.2 Medical Kits - A compilation of first aid supplies located in the four following places:

(1) First Aid Room, (2) Fire Locker (Unit 1 Turbine f

(,g

/

Building, Elev. 354', South end), (3) Fire Locker (Unit 2 Turbine Building, Elev. 354', North End), and (4) Fire Locker (Unit 1/2 Tur-bine Building, Elev. 386', Near the Control Rooms).

l I

PLANT MANUAL SECTION:

PROCEDURE / WORK PLAN TITLE:

NO:

DUTIES OF THE EMERGENCY ruvnnevev prAv urnTc31 Tr39 tono 69 PAGE o nr a aE=N 4 oATE ARKANSAS NUCLEAR ONE mnm n)

CHANGE DATE (v

5.0 RESPONSIBILITIEE 5.1 The Emergency Medical Team Leader is responsible for coordinating emergency medical response efforts, as necessary, once he arrives on site and for responding to Emergency Action Levels as described in this procedure.

5.2 The Emergency Medical Alternate Team Leader is responsible for assisting in coordinating emergency medical response efforts.

If the designated Team Leader is not available then an Alternate Team Leader should assume the responsibilities of the Team Leader 5.3 The Emergency Medical Team is responsible for performing the following functions under the direction of the Emergency Medical Team Leader and for responding to Emergency Action Levels as described in this procedure:

5.3.1 Providing emergency first aid and decontamination of injured persons.

5.3.2 Performing, in conjunction with the Er ergency Radiation Team, onsite rescue operations.

5.4 The Medical Team Leader is responsible for the initial and continued accountability of team personnel.

5.5 The Shift Maintenance Medical Team shall assume the responsibilities f' s) of the Emergency Medical Team during non-routine work hours. They will not respond to medical emergencies during routine work hours unless specifically requested to do so.

6.0 NOTIFICATIONS 6.1 During routiae work hours, the Emergency Medical Team personnel on-site should be contacted by the most expedient means available.

6.2 After routine work hours, the Shift Maintenance Medical Team may be contacted by the most expedient means available, i.e. ext. 3142/3411 and plant paging system.

In the event that additional support is needed by the Shift Maintenance Medical Team, the Emergency Medical Team may be contacted as follows:

6.2.1 Refer to the roster / call list contained in Attachment 4, 1903.10, " Emergency Action Level Response".

6.2.2 Contact a Team Leader / Alternate Team Leader.

6.2.3 Provide the individual contacted with appropriate information and request them to ensure that contact is attempted with the remaining team personnel, as needed.

6.3 The following information should be provided to the notified Emergency Medical Team personnel as indicated:

(/

\\_,

6.3.1 If team personnel are to respond to a medical emergency that does not involve an Emergency Action Level, they should be provided with the location and type of the medical emergency, as known.

~

PLANT M ANUAL SECTION:

PROCEDURFJWORK PLAN TITLC NO:

DUTIES OF THE EMERGENCY ruptcrerv ni tu urnTest Trau

  • r no

'M

~

PAGE f.

,g h

aevision

({

ARKANSAS NUCLEAR ONE

. o*TE

,,,m,n CHANGE DATE 8.2 Alert If the emergency situation does not involve a medical emergency, the Emergency Medical Team personnel shall be placed on a " standby status" as long as the Alert EAL is in effect.

8.2.1 Notifications should be made in accordance with Section 6.0 of this procedure.

8.2.2 When on-site, the team leader should report to the Duty Emergency Coordinator to obtain further instructions, as necessary.

8.3 Site Emergency / General Emergency NOTE:

The transition from an Alert to a Site / General Emergency activates the long-term Emergency Response Organization.

Upon arrival on-site and an appropriate turnover from the Duty Emergency Coordinator, the Emergency Services Coordinator will coo'rdinate the actions of the on-site medical response personnel.

If the emergency situation does not involve a medical emergency, the Emergency Medical Team personnel shall report to the First Aid Room /

Break Room Area (2nd floor - Admin. Bldg.) unless otherwise directed.

The Team Leader shall expeditiously account for the team members and report the results to the Technical Support Center *,

_)

  • giving the names and badge numbers of all accounted for team members.

The team shall then await further instructions.

9.0 ATTACIDIENTS AND FORMS None The informat ion c ontained within t he symbols (*) is proprietary or private infor-mation.

s.