7 M_ -
stf TIIE CINCINNATI GAS & ELECTRIC COMPANY CIN CINN ATI. OHIO 4 52o1 March 23, 1983 LOZ-83-0002 E. A. BORGMANN stNaon vlCE PRESIDENT Docket No. 50-358 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention:
Mr. J.G. Keppler Regional Administrator Gentlemen:
RE:
WM. H. ZIMMER NUCLEAR POWER STATION - UNIT 1 10CFR50.55(e) - ITEM M RHR HEAT EXCHANGER VALVES W.O. 57300, JOB E-5590, FILE NO. 956C, M-19 This letter constitutes an interim report concerning the subject condition initially reported to the commission as 10CFR50.55(e) Item M-19.
As stated in our previous report, QA-2226, dated January 20, 1983, modifi-cations necessary to complete the corrective action were expected to be completed approximately three months after the NRC's " Order to Show Cause and l
Immediately Suspending Construction" is lifted for work in this area.
Part of the required material has been received with the remainder scheduled for delivery by April 25, 1983.
Installation and testing is still scheduled l
for completion approximately three months after the NRC's " Order to Show Cause and Immediately Suspending Construction" is lifted for work in this area. A follow-up report will be submitted by June 1, 1983.
We trust the above will be found acceptable as an interim report under 10CFR50.55(e).
Very truly yours.
THE CINCINNATI GAS & ELECTRIC COMPANY By
(
E.A. BORGMANN I
SENIOR VICE PRESIDENT FHS/bef l
cc: NRC Office of Inspection & Enforcement Washington, D.C.
20555 NRC Senior Resident Inspector Attni W.F. Christianson AIAll 311983 l
NRC Zimmer Project Inspector Region III 8304050471 830323 PDR ADOCK 05000358 M-2/