THE CINCINNATI GAS & ELECTRIC COhfPANY c21 ~
CIN CIN N ATI. OHIO 4 5201 March 24, 1983 LOZ-83-0007 E. A. BORG M AN N SENIOR VICE PRE $rDENT Docket No. 50-358 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Attention:
Mr. J.G. Keppler Regional Administrator Gentlemen:
RE:
WM. H, ZDIMER NUCLEAR POWER STATION - UNIT 1 10CFR50.55(e) - ITEM M INADEQUATE QUALIFICATION OF HYDRAULIC CONTROL UNITS (HCU'S)
W.O. 57300, JOB E-5550, FILE NO. 956C, M-54 This letter constitutes a follou-up to our interim report, QA-2100, dated November 8, 1982, concerning the subject condition initially reported to the Commission on July 21, 1982 under the requirements of 10CFR50.55(e).
A detailed review of the Sargent & Lundy " Dynamic Qualification Report for Hydraulic Control Units" has identified specific areas requiring resolution.
The dynamic qualification test program, originally scheduled for completion by March 31, 1983, has been delayed pending resolution of those areas in the qualification report.
A follow-up report will be submitted by June 30, 1983.
We trust the above will be found acceptable as an interim report under 10CFR50.55(e).
Very truly yours, THE CINCINNATI CAS & ELECTRIC COMPANY By E.A. BORGMANN SENIOR VICE PRESIDENT RNT/DJF/bef 8304050403 830324 PDR ADOCK 05000359 S
Mr. J.G. Keppler 2
March 24, 1983 Regional Administrator LOZ-83-0007 cc: NRC Office of Inspection & Enforcement Washington, D.C.
20555 NRC Senior Resident Inspector Attn:
W.F. Christianson NRC Zimmer Project Inspector Region III t