7 1[
consumers Power
(' P ~ -
company 0",",u L,,o,,,,g.,.,-.,
and Construction General offices: 1945 West Parnali Road, Jackson, MI 49201 + (517) 788-0453 March 25,, 1983 Director of Office of Inspection and Enforcement Att Mr Richard C DeYoung US Nuclear Regulatory Commission
]
Washington, DC 20555 MIDLAND UUCLEAR C0 GENERATION PLANT ALAB-106 MONTHLY REPORT FOR FEBRUARY 1983 DOCKET NOS 50-329 AND 50-330 FILE:
0.4.6 SERIAL
20738 In accordance with Condition of Memorandum and Order ALAB-106, dated March 23, 1973, and Amendment No 1 of the Midland Plant Construction Permit, enclosed are ten copies of the following documents written or closed during the month: Bechtel Nonconformance Reports; sheets from the Bechtei Noncon-formance Report Log; Bechtel FSO Nonconformance Reports; sheets fron the Bechtel FSO Nonconformance Report Log; Bechtel Quality Action Requests; Bechtel Management Corrective Action Reports; Bechtel Quality Assurance Findings; Bechtel FLAGS Quality Action Reports; Babcock & Wilcox Reports of Nonconformity; Babcock & Wilcox In-Service Inspection Nonconformance Reports; Consumers Power Company Nonconformance Reports; Audit Finding Reports; Quality Action Requests; Corrective Action Reports; and Manageaent Corrective Action Reports.
&m hje M JWC/WRB/lj r CC JGKeppler, USNRC Region III (w/ enc)
RJCook, NRC Resident Inspector, Midland Site (w/ enc) 70d v
S 8304050031 830325 PDR ADDCK 05000329
/
h R
PDR OC0383-0029A-MP01
4 BECHTEL Reopened NCR's a/d3 J