Supplemental Testimony of DC Bley Correcting Misstatement in 830112 Testimony.Flooding Event on 801017 Did Not Lead to Revised Tech Specs Re Leakage Detection Sys.W/Prof Qualifications & Certificate of Svc
ML20072P854
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/31/1983
From: Dennis Bley
CONSOLIDATED EDISON CO. OF NEW YORK, INC., PLG, INC. (FORMERLY PICKARD, LOWE & GARRICK, INC.), POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
References
ISSUANCES-SP, NUDOCS 8304040397
Download: ML20072P854 (13)


Text

i COCKETED U9iP C

'83 APR -1 P2 50 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges:

James P. Gleason, Chairman Frederick J.

Shon Dr. Oscar H.

Paris

)

In the Matter of

)

)

CONSOLIDATED EDISON COMPANY OF

)

Docket Nos.

NEW YORK, INC.

)

50-247 SP (Indian Point, Unit No. 2)

)

50-286 SP

)

POWER AUTHORITY OF THE STATE OF

)

NEW YORK

)

March 31, 1983 (Indian Point, Unit No. 3)

)

)

LICENSEES' SUPPLEMENTAL TESTIMONY OF DENNIS C.

BLEY ON CONTENTION 2.2(a)

ATTORNEYS FILING THIS DOCUMENT:

Brent L.

Brandenburg Charles Morgan, Jr.

Paul F.

Colarulli CONSOLIDATED EDISON COMPANY Joseph J.

Levin, Jr.

OF NEW YORK, INC.

4 Irving Place MORGAN ASSOCIATES, CHARTERED New York, New York 10003 1899 L Street, N.W.

(212) 460-4600 Washington, D.C.

20036 (202) 466-7000 8304040397 830331

. ib[)h -

PDR ADDCK 05000247 T

PDR

SUPPLEMENTAL TESTIMONY ON CONTENTION 2.2(a)

My name is Dennis C. Bley.

I am a consultant in relia-bility, risk, and decision analysis for electrical generat-ing plants at Pickard, Lowe and Garrick, Inc.

I was a prin-cipal investigator on the Indian Point Probabilistic Safety Study.

A statement of my professional qualifications is attached.

The purpose of this Supplemental Testimony is to cor-rect a misstatement in my testimony as filed on January 12, 1983, and in the Indian Point Probabilistic Safety Study (IPPSS), upon which my testimony was based.

The correction pertains to the statement that the flooding event at Unit 2 on October 17, 1980, led to numerous hardware and administrative changes for both units including for both units:

o Revised technical specifications regarding limiting conditions for operation of the various leakage detection systems and operating leakage limits.

Licensees' Testimony of Dennis C.

Bley on Contention 2.2(a) at 2 (Jan. 12, 1983); IPPSS { 7.4.2.2.5.

This statement is in error regarding Unit 3 because Unit 3's Technical Specifications in existence prior to the flooding event at Unit 2 already addressed the subject of fan cooler leakage.

See Amendment No. 31; Technical Specifications for Indian Point Unit No. 3 at 4.4-10.

The testimony of the Nuclear Regulatory Commission Staff on this subject is accurate:

" Technical specifications at Unit 3 already existed that required testing of the air cooler system that limited the leak rate to 0.36 gallons per minute, this leakage limit includes all valves, coils and pipes, not just the isolation valves."

NRC Staff Testimony of William T.

LeFave, Frank Rowsome and Bernard Turovlin on Contention 2.2.a at 14 (Jan. 12, 1983) (emphasis added).

'l e

a y

m, w

-e m

n

N A*4E DENNIS C. BLEY EDUCATION Ph.D., Nuclear Reactor Engineering, Massachusetts Institute of Technolo gy,1979.

Courses in nuclear engineering and computer science, Cornell University, 1972-1974.

U.S. Navy Nuclear Power School,1968.

University of Cincinnati, B.S.E.E.,1967.

Courses in Mathematict and Physics, Centre College of Kentucky, 1961-1952.

PROFESSIONAL EXPERIENCE General Sur. mary

~

A consultant at Pickard, Lowe & Garrick, Inc.,1979-present. Technical - - '

analysis of power plant availability and risk. Cost-benefit analysis of peser plant system changes. Preparation of technical reports, expert testimony, and proposals.

Supervision of the technical quality of PLG reports and direction of some PLG projects.

Instructor at availability, risk, and decision analysis courses offered by PLG. Oyster Creek Probabilistic Risk Assessment (OPSA). Assisted in the completion and review of this complete risk assessment of an operating SWR performed for Jersey Central Power & Light. Work Order Scheduling System (WOSS).

Assisted in developing the San Onofre 2 and 3 plant model for a computer based work order prioritizing, scheduling, and record keeping system for Southern California Edision Company.

Steam Turbine Diagnostics Cost-Benefit Analysis. Developed and applied a procedure for evaluating diagnostic alternatives for EPRI. Reliacility Analysis of Diablo Canyon Auxiliary Feedwater System for Pacific Gas & Electric. Midland Pl ant Auxiliary Feeowater System Reliability Analysis for Consumers Pcwer.

Technical Review of the " Office of Emergency Services Recommended Emergency Planning Zone Considerations..." for Southern California Edison. Prioritization of NRC Action Plan for NSAC. Development of a methodology and participation in an AIF workshop to apply it for EPRI/NSAC.

Zion and Indian Point Probabilistic Safety Studies.

Metnods development, systems analysis, and plant modeling.

Other PRAs--LaSalle, Browns Ferry, Midland, Pilgrim 1, and Oconee.

On USS Enterprise, Reactor Training Assistant, 5 months,1971.

Responsible for technical training of approximately 400 nuclear trained officers and men prior to annual safeguards examination.

Propulsion Pl ant Station Officer, 9 months, 1970-1971.

Responsible for maintenance and operation of one propulsion plant (two reactors, eight steam generators, and associated ecuipment) during pcwer range testing of new reactors and during deployment. Approximately 50 enlisted personnel were assigned to the pl ant.

Shif t ?ropul sion Pl ant Watch Of ficer,15 months, 1959-1970.

Supervised a crew of aceut 20 navy enlisted ocerators and many shipyard workers on S-hour shift rotation conducting maintenance l

l l

l e

4 w

.ew, e--

W

i BLEY - 2

{

l and testing in one propulsion plant during refueling-overhaul. Shipboard qualifications:

Propulsion Outy Officer, responsible for all propulsion equipnent during absence of Reactor Officer and Engineer Officer.

Engineering Officer of the Watcn, operational watch in Central Control, responsible for all propulsion and engineering equipment and watch standers.

Propulsion Plant Watch Officer, operational watch in one propulsion plant, directed and responsible for all operations in the pl ant.

At Cincinnati Bell, Plant staff assistant, 4 months,1967. Worked in central office and transmission group supplying technical assistance to the line organization. Cooperative trainee, 3 years,1964-1967, work-study program with alternate three month periods at the University of Cincinnati.

Chronological Sunmary 1979-P resent Consultant, Pickard, Lowe and Garrick, Inc.

1974-1979 Massachusetts Institute of Technology.

Research assistant for Department of Energy LWR Assessment Project. Teaching assistant in engineering of nuclear reactors.

Summer 1976 Northecst Utilities.

Engineer: economy studies, plant startup, analysis of physics tests.

1967-1974 U.S. Naval Reserve, active duty.

Instructor of naval science, Cornell Universicy, 1971-1974; Reactor Department of USS Enterprise, deployment and refueling-overhaul, 1969-1971; Nuclear Power training program and Officer Candidate School, 1967-1969.

1964-1967 Cincinnati Bell.

Pl ant staff assistant and work-study program trainee.

MIy.3ERSHIPS, LICENSES. AND HONORS The Society for Risk Assessment.

Institute of Electrical and Electronics Engineers.

American Nuclear Society.

American Association for the Advancement of Science.

The New York Acacemy of Sciences.

U.S. Naval Reserve, Commander.

Registered Nuclear Engineer, State cf California.

BLEY - 3 Sigma Xi (national science honors society),1976.

Sherman R. Knapp Fellowship (Northeast Utilities), 1975-1976.

Sl oan Research Traineeship,197a-1975.

Eta Xappa Nu (national electrical engineering honors society),1967.

REPORTS AND PUBLICATIONS "Seabrook Probabilistic Safety Assessment," Public Service Company of New Ha=pshire, to be published in 1983.

Pickard, Lowe and Garrick, Inc., " Midland Probabilistic Risk Assessment,"

Consumers Power Company, to be published in 1982.

Oconee Probabilistic Risk Assessment," a joint effort of the Nuclear Safety Analysis Center, Duke Power, and other participating utilities, to be published in 1982.

Tennessee Valley Authority and Pickard, Lowe and Garrick, Inc., " Browns Ferry Probabilistic Risk Assessment," to be published in 1982.

Apostolakis, G., M. Kazarians, and D. C. Sley, "A Methodology for Assessing the Risk from Caole Fires," accepted for publication in Nuclear Sa fety, 1982.

Kaplan, S., H. F. Perla, and D. C. Bl ey, "A Methodology for Seismic Safety Analysis of Nuclear Pcwer Plants," proposed presentation at the International Meeting on Thermal Nuclear Reactor Safety, Chicago, Illinois, August 29-September 2,1982.

Bl ey, D. C., S. Xaplan, and B. J. 2arrick, " Assembling and Deccaposing PRA Results:

A Matrix FormaTism," proposed presentation at tne International Meeting on Thermal Nuclear Reactor Safety, Chicago, Illinois, August 29-September 2,1982.

Garrick, B. J., S. Kaplan, and D. C. Bley, "Recent Advances in Probacilistic Risk Assessment," prepared for the MIL Nuclear Pcwer Reactor Safety Course, Cambridge, Massachusetts, July 19, 1982.

Fleming, K. N., S. Xaplan, and B. J. Garrick, "Seabrook Probabilistic Safety Assessnent Management Plan,"PLG-0239, June 1982.

Garrick, B. J., " Lessons Learned From First Generation Nuclear Plant Prebabilistic Risk Assessments," to be presented at the Workshop on Low-?rocability/High-Consequence Risk Analysis, Arlington, Virginia, June 15-17,1982.

(

h l

BLEY - 4 Garrick, B. J., S. Kaplan, D. C. Iden. E. B. Cleveland, H. F. Perla, D. C. Bley, D. W. Stillwell, H. V. Schneider, and G. Apostolakis, " Power Plant Availability Engineering: Methods of Analysis, Program Planning, and Applications," EPRI NP-2168, PLG-0165, May 1982.

Bley, D. C., and R. J. Mulvihill, " Comments on Evaluation of Availaoility Imorovement Options for Moss Landing Units 6 and 7," PLG-0226, March 1982.

Stillwell, D. W., G. Acostol akis, D. C. Bl ey, P. H. Raace, R. J. Mulvihill, S. Kaplan, and B. J. Garrick, "EEI Availability Handbook," PLG-0218, January 1982.

Bley, D. C., L. G. H. Sarmanian, and D. W. Stillwell, " Reliability Analysis of Safety Injection System Modification, San Onofre Nuclear Generating Station - Unit 1,".PLG-0206, October 1981.

" Zion Probabilistic Safety Study," Commonwealth Edison Company, September 1981.

Buttemer, D. R., " Analysis of Postulated Accidents During Low Power Testing at the San Onofre Nuclear Generating Station--Unit 2," PLG-0199, Septemaer 1981.

Sl ey, D. C., D. W. Stillwell, and R. R. Fray, " Reliability Analysis of Diablo Canyon Auxiliary Feedwater System," presented at the Tenth Biennial Topical Conference on Reactor Operating Experience, Cleveland, Ohio, Aucust 17-19, 1981.

Garrick, B. J., and D. C. Bley, " Lessons Learned from Current PRAs,"

presented to the ACRS Subcommittee on Reliability and Probabilistic Risk Assessment, Los Angeles, California, July 28, 1981.

Xaplan, S., G. Apostolakis, B. J. Garrick, D. C. Bley, and K. Woodard,

" Methodology for Probabilistic Risk Assessment of Nuclear Power Plants,"

draf t version of a book in preparation, PLG-0209, June 1981.

Perla, H. F., "Proj ect Pl an:

Probabilistic Risk Assessment, Midland Nuclear Power Plant," ?LG-0150, May 1981.

Bl ey, D. C., C. L. Cate, D. W. Stillwell, and B. J. Garrick, "Midl and Plant Auxiliary Feedwater System Reliability Analysis Synopsis,"

PLG-0166, March 1981.

Pickard, Lowe and Garrick, Inc., "A Methodology to Quantify Uncertainty of Cost of Electricity for Alternate Designs of (Combustion) Turcine Combined Cycle Pl ants," PLG-0162, March 1981.

ELEY - 5 Garrick, B.. J., S. Ahmed, and D. C. Bley, "A Methodology for Evaluating the Costs and Benefits of Power Plant Diagnostic Techniques," submitted for presentation at the Ninth Turbomachinery Symposium, Houston, Texas, December 9-11, 1980.

Pickard, Lowe and Garrick, Inc., " Seminar:

Probabilistic Risk Assessment of Nuclear Power Plants," PLG-0154, November 1980.

Pickard, Lowe and Garrick, Inc., " Project Pl an:

Probabilistic Risk Assessment, Browns Ferry Nuclear Plant Unit 1," PLG-0149, October 1930.

Garrick, S. J., S. Kaplan, D. C. Iden, E. B. Cl eveland, H. F. Peria, D. C. Bley, and D. W. Stillwell, " Power Plant Availability Engineering, Methods of Analysis - Program Planning - Applications," 2 Vols.,

PLG-0148. October 1980.

Bley, D. C., C. L. Cate, D. W' Stillwell, and B. J. Garrick, " Midland Plant Auxiliary Feeddater System Reliability Analysis," PLG-0147, October 1980.

Bl ey, D. C., D. M. Wheeler, C. L. Cate, D. W. Stillwell, and B. J. Garr*:ck, " Reliability Analysis of Diablo Canyon Auxiliary Feedwater Sy stem," PLG-0140, September 1980.

Garrick, B. J., et al, " Project Plan: Oconee Probabilistic Risk Assessment," PLG-0138, August 1980.

Garrick, B. J., D. M. Wheeler, E. B. Clevel and, D. C. Bley, L. H. Reichers, and C. B. Morrison, " Operating Experience of Large U.S. Steam Turbine-Generators; Volume 1 - Data, Volume 2 - Utility Di rectory," PLG-0134, June 1980.

Garrick, B. J., S. Kaplan, and D. C. Bley, " Seminar:

Power Plant Probabilistic Risk Assessment and Reliability," PLG-0127, May 1980.

Garrick, B. J., and S. Kaplan, "0yster Creek Probabilistic Safety Anal-ysis (CPSA)," presented at the ANS-ENS Topical Meeting on Thermal Reactor Safety, Knoxville, Tennessee, April 8-11, 1980.

Garrick, B. J., S. Xaplan, G. E. Apostolakis, D. C. Siey, and T. E. Potter, " Seminar: Probabilistic Risk Assessment as Applied to Nuclear Power Plants," PLG-0124, March 1980.

Garrick, B. J., S. Ahmed, and D. C. Bley, "A Methodology for Evaluating the Costs and Benefits of Pcwer Plant Diagnostic Techniques," PLG-0118, January 1980.

~

SLEY - 5 Kapl an, S., S. J. Garrick, and D'. C. Sl ey, " Notes on Ri sk, Probacili ty, and Decision," PLG-0113, November 1979.

Sl ey, D. C., C. L. Cate, D. C. Iden, S. J. Garrick, and J. M. Hudson,

" Seismic Safety Margins Research Program (Phase I), Project VII - Systems Analysis," PLG-Olgp, Septemoer 1979.

Cate, C. L., and S. J. Garrick, "W-501 Combustion Turbine Starting Reliability Analy sis," PLG-0103, June 1979.

Pickard, Lowe and Garrick, Inc., " Plant Availability Program Specifica-tion, San Onofre Nuclear Generating Station," March 1979.

Pickard, Lowe and Garrick, Inc., " Work Order Scheduling System, Design Specification," March 1979.

A e

l N

  • UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges:

James P. Gleason, Chairman Frederick J.

Shon Dr. Oscar H.

Paris

)

In the Matter of

)

)

CONSOLIDATED EDISON COMPANY OF

)

Docket Nos.

NEW YORK, INC.

)

50-247 SP (Indian Point, Unit No. 2)

)

50-286 SP

)

POWER AUTHORITY OF THE STATE OF

)

March 31, 1983 NDi YORK

)

(Indian Point, Unit No. 3)

)

)

CERTIFICATE OF SERVICE I hereby certify that on the 31st day of March, 1983, I caused a copy of Licensees' Supplemental Testimony of Dennis C.

Bley on Contention 2.2(a) to be served by first class mail, postage prepaid on all parties:

---w eww

-e-.

.-.w t

-t w.

.m y

-e o

vpe,

---7w r

e

n James P. Gleason, Chairman Charles M. Pratt, Esq.

Administrative Judge Stephen L.

Baum, Esq.

Atomic Safety and Licensing Board Power Authority of the 513 Gilmoure Drive State of New York Silver Spring, Ma ryland 20901 10 Columbus Circle New York, New York 10019 Mr. Frederick J.

Shon Administrative Judge Janice Moore, Esq.

Atomic Safety and Licensing Board Counsel for NRC Staff U.S. Nuclear Regulatory Office of the Executive Commission Legal Director Washington, D.C.

20555 U.S.

Nuclear Regulatory Commission Washington, D.C.

20555 Dr. Oscar H.

Paris Administrative Judge Brent L.

Brandenburg, Esq.

Atomic Safety and Licensing Board Assistant General Counsel U.S. Nuclear Regulatory Consolidated Edison Company Commission of New York, Inc.

Washington, D.C. 20555 4 Irving Place New York, New York 10003 Docketing and Service Branch Office of the Secretary Ellyn R.

Weiss, Esq.

U.S.

Nuclear Regulatory Commission William S.

Jordan, III, Esq.

Washington, D.C.

20555 Harmon and Weiss 1725 I Street, N.W.,

Suite 506 Joan Holt, Project Director Washington, D.C. 20006 Indian Point Project New York Public Interest Research Charles A.

Scheiner, Co-Chairperson Group Westchester People's Action 9 Murray Street Coalition, Inc.

New York, New York 10007 P.O.

Box 488 White Plains, New York 10602 Jeffrey M. Blum, Esq.

New York University Law School Alan Latman, Esq.

423 Vanderbilt Hall 44 Sunset Drive 40 Washington Square South Croton-On-Hudson, New York 10520 New York, New York 10012 Ezra I.

Bialik, Es q.

Charles J.

Maikish, Esq.

Steve Leipzig, Esq.

Litigation Division Environmental Protection Bureau The Port Authority of New York New York State Attorney and New Jersey General's Office One World Trade Center Two World Trade Center New York, New York 10048 New York, New York 10047 Andrew P.

O'Rourke Westchester County Executive 148 Martine Avenue White Plains, New York 10601 Andrew S.

Roffe, Esq.

New York State Assembly Albany, New York 12248 er

Marc L.

Parris, Esq.

Atomic Safety-and Licensing Eric Thorsen, Esq.

Board Panel l

County Attorney U.S. Nuclear Regulatory Commission County of Rockland.

Washington, D.C.

20555 11 New Hempstead Road New City, New York 10956 Atomic Safety and Licensing Appeal Board Panel Phyllis Rodriguez, Spokesperson U.S. Nuclear Regulatory Commission Parents Concerned About Indian Washington, D.C.

20555 Point 4

P.O.

Box 125 Honorable. Richard L.

Brodsky Croton-on-Hudson, New York 10520 Member of the County Legislature Westchester County Renee Schwartz, Esq.

County Office Building Paul Chessin, Esq.

White Plains, New York 10601 Laurens R.

Schwartz,-Esq.

Margaret Oppal, Esq.

Zipporah S.

Fleisher Botein, Hays, Sklar and Hertzberg West Branch Conservation 200 Park Avenue Association i

New York, New York 10166 443 Buena Vista Road New City, New York 10956 Honorable Ruth W. Messinger Member of the Council of the Mayor George V. Begany j

City of New York Village of Buchanan District #4 235 Tate Avenue City Hall Buchanan, New York 10511 3

New York, New York 10007 Judith Kessler, Coordinator Greater New York Council Rockland Citizens for Safe Energy on Energy 300 New Hemstead Road i

c/o Dean R. Corren, Director New City, New York 10956

- New York University 26 Stuyvesant Street David H.

Pikus, Esq.

New York, New York 10003 Richard F.

Czaja, Esq.

i Shea & Gould I

Joan Miles 330 Madison Avenue Indian Point Coordinator New York, New York 10017 i

New York City Audubon Society 71 West 23rd Street, Suite 1828 Amanda Potterfield, Esq.

New York, New York 10010 New York Public Interest Research Group, Inc.

Richard M. Hartzman, Esq.

9 Murray Street, 3rd Floor Lorna Salzman New York, New York 10007 l

Mid-Atlantic Representative Friends of the Earth, Inc.

David R.

Lewis, Esq.

208 West 13th Street Atomic Safety and New York, New York 10011.

Licensing Board Panel U.S.

Nuclear Regulatory Stanley B. Klimberg, Esq.

Commission General Counsel Washington, D.C.

20555 New York State Energy Office 2 Rockefeller State Plaza Albany, New York 12223 e

i 4

--,,-4,w, e

,,,,----n

~-e,.-....----.m--

,c,,

.--.--.c.

,-m.

,,,,-,_..~.ne,----w-.,--

,-w n----rn

Mr. Donald Davidoff Director, Radiological Emergency Preparedness Group Empire State Plaza Tower Building, Rm. 1750 Albany, New York 12237 Craig Kaplan, Esq.

National Emergency Civil Liberties Committee 175 Fifth Avenue, Suite 712 New York, New York 10010 Michael D.

Diederich, Jr.,

Esq.

Fitgerald, Lynch & Diederich 24 Central Drive Stony Point, New York 10980 Steven C.

Sholly Union of Concerned Scientists 1346 Connecticut Avenue, N.W.

Suite 1101 Washington, D.C.

20036 Spence W. Perry Office of General Counsel Federal Emergency Management Agency 500 C Street, S.W.

W'shington, D.C.

20472 a

Stesart M. Glass Regional Counsel

' Room 1349 Federal Emergency Management Agency 26 Federal Plaza New York, New York 10278 Melvin Goldberg Staff Attorney New York Public Interest Research Group 9 Murray Street New York, New York 10007 Jonathan L. Levine, Esq.

P. O.

Box 280 New City, New York 10958

- Paul F.

Colarulli t