Responds to NRC Re Violations Noted in IE Insp Rept 50-255/83-01.Corrective Actions:Tech Spec Revs Re QA Program Description Identified & Inserted Into Manual
ML20072P619
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/18/1983
From: Vandewalle D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20072P617 List:
References
NUDOCS 8304040327
Download: ML20072P619 (2)


Text

_

y Consumets Power Company General offices: 212 West Michigan Avenue, Jackson, MI 48201 + (617) 708-0660

'Harch 18, 1983 James G Keppler, Administrator Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 j

DOCKET 50-255 - LICENSE DPR !

PALISADES PLANT - RESPONSE TO IE INSPECTION REPORT 83-01 IE Inspection Report No. 50-255/83-01 dated February 22, 1983 reported the results of a routine safety inspection conducted January 4-7, 1983. Addressed in the report was one item of noncompliance dated February 17, 1983 to which a response is required. The item of noncompliance and response thereto are given below:

Item:

Appendix B, 10CFR50, Criterion VI, requires that measures be established to control the issuance of documents such as instructions, procedures and drawings, including changes thereto, which prescribe all activities affecting quality. Consumers Power Company CPC-2A, " Quality Assurance Program Description for Operating Nuclear Power Plants", Section'6.2.2, Rev 1, requires that controls be established for approval, issue and change of documents, including the Plant Technical Specifications.

Contrary to the above, Controlled Copy No. 28 of the Plant Technical Specifications, which is located in the Plant training center, was determined not to be in accurate revision status, in that, three parts of Section 6 of the manual were missing.

Response

Corrective Action Taken and Results Achieved A review of Control Copy #28, Plant Technical Specifications was conducted subsequent to identification by the inspector. Correct revisions are now in place.

'M "M B 2 1 1 8 3 OC0383-0018A-NLO2 o

8304040327 830328 PDR ADOCK 05000255 0

PDR

r JGKeppler, Administrator 2

Palisades Plant RESPONSE TO IEIR 83-01 March 18, 1983 Corrective Action to be Taken to Avoid Further Noncompliance Training Department individuals responsible for updating controlled Plant documents have been instructed in the significance of maintaining proper document revisions. Documents received by the Plant training center will be reviewed for completeness prior to insertion into the controlled manuals.

Date When Full Compliance Will be Achieved Full compliance has been achieved.

DJk David J andeWalle Nuclear Licensing Administrator CC Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector - Palisades OC0383-0018A-NLO2