Forwards Preliminary Results of in-plant Safety Relief Valve Demonstration Test at Facility Re Performance of Suppression Pool Temp Monitors.Existing Pool Water Temp Instrumentation Provides Bounding Indication of Temp
ML20072P469
Person / Time
Site: LaSalle  
Issue date: 03/30/1983
From: Schroeder C
COMMONWEALTH EDISON CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
6302N, NUDOCS 8304040267
Download: ML20072P469 (9)


Text

  1. h Commonwe:lth Edison

) Onts First Nitional Plaza. Chicago, Illinois

((Cj Chicago, Illinois 60690 7 Addr:ss R: ply to: Post Offica Box 767 March 30, 1983 Director of Nuclear Reactor Regulation Attention:

Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U. S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

LaSalle County Station Units 1 and 2 In-Plant SRV Test Results NRC Docket Nos. 50-373 and 50-374 References (a):

T.S. Table 3.3.7.5-1 " Accident Monitoring Instrumentation",

License NPF-ll.

(b):

T.S. 3.6.2 " Suppression Chamber Limiting Condition",

License NPF-11.

Dear Sir:

References (a) and (b) are germane to suppression chamber water temperature instrumentation and state in part:

" Final requirement to be determined after demonstration of correlation of pool bulk temperature as measured by each division to pool bulk temperature as measured by both divisions.

Results of demonstration and necessary changes to this specification shall be submitted to the commission within 90 days of demonstration."

This letter provides you with the preliminary or " quick look" results of the SRV demonstration test at LaSalle with respect to the performance of the suppression pool temperature monitors. ' This testing was completed on December 30, 1982.

The attached discussion concludes that the existing pool water temperature instrumentation provides a bounding (i.e. conservative) indication of bulk pool temperature.

This quick look information is depicted in Figures 7 and 8 where a conservative bias of between 5 to 15 degrees is evident.

The sensor channels powered from either electrical division demoristrated equivalent conservative indications of pool bulk temperature.

8304040267 830330 PDR ADOCK 05000373 P

PDR

Director of NRR March 30, 1983 Pending a detailed statistical treatment of these indications to remove the apparent temperature bias and to correlate them with localized vertical thermal profiles of the suppression pool, this early data'is being used to conservatively represent the bulk pool temperature.

The SRV discharge tests validated that thermal stratification of the pool is a dominant effect for short-duration (15 second) blowdown events, both before and after the event, with maximum temperatures evidenced near the pool surface.

That was the original reason for placement of the thermal monitors just below the surface of the pool.

The referenced Tech Spec table (a) above specifies that 7 operable thermal channels constitute the minimum monitoring capability for LaSalle, i.e. one electrical division can be inoperable.

This specification is still conservative for LaSalle and justification for changing to a lesser number of monitoring channels must await the data refinement discussed above.

At this time, no changes are necessary.

To the best of my knowledge and belief the stakements contained herein and in the enclosure are true and correct.

In some respects these statements are not based on my personal knowledge but upon information furnished by other Commonwealth Edison and contractor employees.

Such information has been reviewed in accordance with Company practice and I believe it to be reliable.

One (1) signed original and forty (40) copies of this letter and enclosure are enclosed for your use.

If there are any further questions in this matter, please contact this office.

Very truly yours, s/x)s3 I

C.

W.

Schroeder Nuclear Licensing Administrator 1m Enclosure cc:

NRC Resident Inspector - LSCS 6302N

Suppression Pool Temperature Monitoring System Suppression Pool Temperature Monitoring System Response The suppression pool temperature monitoring system (SPTMS)

. consists of two independent trains of sensors located at 14 different locations along the outer pool boundary and pedestal.

All sensors are located approximately one foot below the low water level.

Dual element sensors are employed at each locat.:n resulting in a total of 28 temperature readings.

Each sensor train monitors the temperature at seven locations.

Temperature readings were recorded on a pair of point recorders during each of the seven extended blowdown tests.

These readings were tabulated for selected times during the test.

The tabulated temperatures were plotted as a function of plant azimuth and compared with the corresponding bulk pool temperature for that time during the test run.

Sample plots are given in Figures 7 and 8 for quencher G, Run 72.

Temperature readings indicated by the permanent temperature monitoring system were found to be always higher than the calculated bulk pool tem-perature for all sensors and for all test runs.

Table 3 lists the temperature difference between the minimum and the maximum of the SPTMS temperature readings and the calculated bulk pool temperature at different times for all the runs.

Discussion of Results The primary purpose of the suppression pool temperature monitoring system is to provide the operator with an indication of the bulk pool temperature.

Since all sensor readings were above the corresponding bulk pool temperatures, the system provides a conservative measure of bulk pool temperature.

k A

It was observed that an increase in pool temperature stratification occurred during the S/RV discharge.

This stratification would tend to support the above conclusion that the SPTMS sensors, which are mounte'd near the pool surface, read higher than the bulk pool temperature.

~

g A

[

TABLE 3 RANGE OF SPTMS SENSOR READINGS ABOVE BULK POOL TEMPERATURE (F)

Run 1

Quencher No.

t = 0 min t = 2 min t= 4 min t = 8 min t = tf Th,f G

69 6.4/10.9 3.7/13.4 5.9/14.2 5.4/14.2 5.7/12.9 78.4 72 5.1/9.3 3.0/12.2 4.1/13.2 5.3/11.5 3.6/12.5 96.9 C

70 6.7/11.1 5.6/13.3 5.5/15.1 5.3/15.4 6.3/15.1 82.5 71 6.8/10.6 5.0/11.4 4.1/12.7 5.0/15.0 4.8/14.4 66.0 73 5.2/8.7 2.5/9.7 2.2/13.0 4.0/13.0 4.3/13.4 88.0 74 5.3/9.1 2.7/10.8 3.4/13.3 3.1/12.6 2.6/12.8 86.7 75 8.4/12.2 5.8/11.3 4.4/14.0 3.5/12.9 3.2/13.0 93.9

1) t is 14, 15, 15, 14, 12,. 10, and 13 minutes for the runs listed.

g

2) Tb,f is the calculated bulk pool temperature at t = tg.

l

(

I "T43 T3o

'e.

f

/

TIS.779 4L Al. G7 '

I f 73'2, ff'#2'g,sf' T14 776 t

7+l i 67.R '

770 Q_

~4~

~

. ~~

2G6.G7'__

r Tl YI*

^

I-g g '_ _.-o 7% *.#lg 44 l g*3g. g # " f ;;, [ i s

s.

  • ~ D

~*h Ti&/,,

~

/f

/

Cctygg kc.

7

<A ', j,'f 4*

W

.g

. o.j cou-a, NM UNT

~

I WA %.

/ 4'.

re sY:'4 j

d 7,

A

.'f/

?o*,

A tho* '8#

I

~

Y

~ II#

b g$

Fir]. 2

,2,

-s s

l0 8l PLsg

-~.

FIGU RE *-

1 TEMPERATUng R LOCATIONS IN SUPPRESSION po PLAN VIgg

^

A

r-COLUMN

( CCNTN NMEtJT l

Fig. 1 I

I I

V j

V

-V 4

l.

ei.. c.e e'. n

  • I 699'11" c.v.is,q j a

=

=

T4 l

7 I

Zone 9 694'1"

  • gr.c.es'. i %'s l

T:6 E,l ! 6?o'- G i

Zone.8 688'10" et. Gs7' 4

, ~;. 2 2 4 c.c... s < - 14 e t. c, s r-'iig Zone 7 686'6" hh hhhii I

GL GOf <

i Zone 6 685'0" Jyn m a_.s i !

ea. voa - v

__ _ E l -

ei.a.i.o

* * * - * ' i> T 3.1 +

gl4 Zone 5 682'9" T:4 i-h #8~A' 6' ' 0 7 # ~ #, '(s-T +,T7.Ti o i

Zone 4 679'1" L _ ::;;33 EL L 7(o -80. ' TG.T7iss j M '*l d ' '" * ' "

Zone 3 677'1" g ' m qita,Tir Zone 2 675'1" r -

g e:3 i o

t.G, @ l'O.O C Zone 1 673'4" EL. ro?t. 4 '

Ti

.1%

'T4

,,gg.

ti,GWL

21. 2.1
  • L
26. o 'a.

. _... _O o. ' t w,

%.99'L

@TE

  • ALL S5MSC':M CPJ d **
  • M,C TO 94D 505 m Ir%cn Sn:s F16. 1 N !a6(WZ-ELEVATio.4 TEMPERATURE SENSOR LOCATION AND ZONE MAP FOR SUPPRESSION POOL - ELEVATION VIEW FIGURE 2 j

r ESS DIV 1 Ess DIV 2 120..

ITR-CNO37 T=0 MIN ITR-CNO38 T-:0 NIN 120.

u_

1 10. --

u.

110.-

e o

100.i 100.i

a to x

90.-

e 90.-

a m

O 8

b O

E 8e 8@

e

~3 e

e 0

80.i 80.I z

e ta to a.

N c_

N Bulk 5

70.;

6 70.;

Bulk r

s

60. ~..................................e 60.'.....

-180. -120

-60.

O.

60.

120.

180

-180. -120.

-60.

O.

60 120.

180 DISTRNCE FROM QUENCHER (DEGREES)

DISTRNCE FROM QUENCHER (DEGREES) 120.

120.

[

ITR-CNO37 T=4 NIN

[

ITR-CNO38 T=4 NIN

[

110.i C

110.i e

o 100.i 100.i 2

e 88 5

e 8e 8

to to 3

90. 7 e

m 90.3 x

e a

g 2

m e

0 w

E 8 0. --

N~

80.--

N a

Bulk to 2.

Bulk n.

3 70.i 5

70.l 60.

60.

.................i.....i..........

.....i.....i...............i.,...

-180. -120.

-60.

O.

60.

120.

180.

-180

-120.

-60.

O.

60.

120.

180 DISTAN.CE FRON QUENCHER (DEGREES)

DISTANCE FRON QUENCHER (DEGREES) 1 FIGURE 7: POOL TEMPERATURE MONITORING' SYSTEM I RUN 72 9-

o o

C3 CO

.*-a m

~

m E

o e r
a e m

e fi N

x e

3 d

d N

m e

D Il CQ g

Il CQ g

s g

g s

w o

g o

w w

/

-g M

/

-g x Np e

e W

w

=

m x

u ee u

2 2

.. O D

. m

.oa

.oo o

o i

r r

o e

o e

c0 m

_ (D e r

L L

y w

w F--

8 e

se 8

.a o a

e

.N 2

g

.N e

g

. 'I*v D

. 'i' W

u

~

u e

e i

g

.-e e

g O

H

  • O p

.o 2

.o g

g

. c0

. o.

....g..m..g...

g....g....g....g M

m e

y

....g....g....g....g..

.g....

g O

o o

o o

o o

o o

o o

o o

o o

F--

o C1 CD N

(D N

e o

C)

CD CD N.

.-e e-.

.-e 7

O (3 030) 3801883dW31 (J 030) 3801883dW31 W

g

.o o

CD CD

.e I--

2 2

C E

O

~.-

O m'

~

~

~.oO u

E E

oO W

y N

0-N N

M ID.

D E

CD D

[

[

G o

W O

w m

s

.o w

-.o w

e

-g

/

-g M a

Q M

W ta.J O

I I

u o

O_

2 z

  • W g

. o' W O

a

.oa o

o O

=

n g

o

.o o

.o%

go E O

75 L O

[ toI L D

0 e

w e

w N

N o

u m

to

.o2 to

.o2 C

.N g

o,

.N g

b

-7 a 5

-T s g

O E

"a M

g)

.. O p

p

.o

.o

. (D

. CD

...ig..

.g..

.g

..g....g,i..,

y in...g....g.

3....g

...g..... y o

o o

o o

o o

o o

o o

o a

o o

01 CD (D

O' e

o U)

CD CD N.

e-e-

.-e e

e