Requests Withdrawal of 820921 Request for Approval of Tech Spec 177 Revising Active Fuel Length.Approval of Tech Spec 184 Eliminated Need for Approval.Refund of Class III Fees Requested
ML20072P187
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 03/30/1983
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8304040142
Download: ML20072P187 (2)


Text

n e

TENNESSEE VALLEY AUTHORITY CHATTANOOG A. TENNESSEE 374o1 400 Chestnut Street Tower II March 30, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Denton:

In the Matter of the

)

Docket No.

50-259 Tennessee Valley Authority )

By my letter to you dated September 21, 1982, we submitted a request to change the technical specifications of the Browns Ferry Nuclear Plant unit 1 (TVA BFNP TS 177). That request proposed revisions to the unit 1 cycle 5 MCPR values because of an error discovered by General Electric in the active fuel length used in the original cycle 5 analysis.

We have since received NRC approval of license amendment request TVA BFNP TVA 184, by letter from R. J. Clark to H. G. Parris dated March 14, 1983 Approval of TS 184 has eliminated the need for approval of TS 177. This is because the page submitted by TS 177 was included in TS 184, and the TS 184 changes were based on the correct fuel length.

Operating cycle No. 5 of unit 1 is presently scheduled to end April 15, 1983 Aside from the impact of TS 184 explained above, the need for approval of TS 177 would have expired at the end of cycle 5.

Since being informed by GE of the incorrect fuel length, plant operation has been administrative 1y controlled to conservative limits. However, TS 177 was submitted to reinstate the conservatism into the technical specifications. Therefore, as TS 177 is no longer needed, we request that it be withdrawn from NRC staff review.

Class III fees totalling $4,000 were forwarded with TS 177 amendment request. Because TS 177 is no longer needed and because we have no evidence that NRC staff review was initiated, we request that the $4,000 be refunded to TVA.

Very truly yours, 8304040142 830330 TENNESSEE VALLEY AUTHORITY PDR ADOCK 05000259 P

PDR L. M. Mills, Ma ger Nuclear Licensing Subscribe ~ and sworn to before Y day of 1983 me t is kdA

)

--d g

Notary Public My Commission Expires T

I#

cc: See page 2

/

An Equal Opportunity Employer fl

. Mr. Harold R. Denton March 30, 1983 cc:

Mr. Charles R. Christopher Chairman, Limestone County Commission P.O. Box 188 Athens, Alabama 35611 Dr. Ira L. Myers State Health Officer State Department of Public Health State Office Building Montgomery, Alabama 36104 Mr. R. J. Clark Browns Ferry Project Manager U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20814

.