ML20072P107

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DR-99 Re Category I Pipe Spool Supplied by Bf Shaw.Initially Reported on 830222.Pipe Spool Flange Thickness Less than Specified.Investigation in Progress.Interim or Final Rept Will Be Submitted by 830504
ML20072P107
Person / Time
Site: River Bend 
Issue date: 03/24/1983
From: Booker J
GULF STATES UTILITIES CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, DR-99, RGB-14-677, NUDOCS 8304040096
Download: ML20072P107 (1)


Text

e2 GULF STATES UTILITIES COMPANY P o S T o F F I C E D o x 2 9 51 DEAUMONT. TEXAS 77704 AREA CODE 713 838-6631 March 24, 1983 RBG-14,677 File Nos. G9.5, G9.25.1.1 Mr. John T. Collins, Regional Administrator U. S. Nuclear Regulatory Commission

[ff'/prg.

Region IV, Office of Inspection and Enforcement l

611 Ryan Plaza Drive, Suite 1000 f

j gg Arlington, Texas 76011

Dear Mr. Collins:

River Bend Station Unit 1 Docket No. 50-458 Interim Report /DR-99 On February 22, 1983, Gulf States Utilities Company (GSU) notified Region IV of a condition potentially reportable under 10CFR50.55(e) concerning a Category I pipe spool supplied to River Bend Station by B. F. Shaw. The pipe spool flange thickness is less than specified. GSU has not completed its investigation. An interim or final status report will be submitted by May 4, 1983.

Sincerely, d

' $s -

Y

[J.E. Booker Manager-Engineering, Nuclear Fuels & Licensing River Bend Nuclear Group ff0 JEB/PJD/kt cc: Director of Inspection & Enforcement U. S. Nuclear Regulatory Commission p

Washington, D. C. 20555 r

/

R. L. Brown (SRI) 8304040096 830324 PDR ADOCK 05000458 S

PDR

.-