1

. , - g

' i L lJf/ / \

UNITED STATES OF AMERICA s

MN/

NUCLEAR REGULATORY COMMISSION g BEFORE THE ATOMIC SAFETY AND LICENSING APPEAL BOARD cel -

1 ' Tgg .

, 3

)

2f 8[7- 4[;,i In the Matter of ) ') q jd PACIFIC GAS AND ELECTRIC COMPANY ) Docket Nos. 50-275 0.L.

) 50-323 0.L.

(Diablo Canyon Nuclear Power )

Plant, Units 1 and 2) )

)

SECOND SET OF INTERROGATORIES PROPOUNDED TO THE INDEPENDENT DESIGN VERIFICATION PROGRAM CONTRACTORS BY GOVERNOR DEUKMEJI AN In accordance with the agreement of the parties concerning discovery directed to the Independent Design Verification Prog ram contrac tors, and to accommodate the special relationship between the applicant and its contractors conducting the IDVP, Governor George Deukmejian hereby propounds directly to said contractors this Second Set of In te r r oga tor ie s, to be answered under oath within fourteen days, pursuant to 10 C.F.R. sec tion 2.740b.

INSTRUCTIONS A. Where you have incomplete information that precludes your fully answering an interrogatory, give such information as you have and state what information you do not h ave . If you are unable to give the information in the form sought but have the information aggregated dif ferently, give the information in the form in which you have it and explain.

1.

8307150357 830700 PDR ADOCK 05000275 G PDR 3303

w.

B. When asked in the interrogatories below to identify or to give the identity of a person, please give the following information about him or her:

1. full name;
2. present job title and employer; C. When asked in the interrogatories below to identify or to give the identity of a document, please give the following inform'ation about the document:
l. Its title, if any;
2. its nature (e.g., letter, memorandum, chart, compu te r pr in tou t, ledge r) ;
3. the da te , if any, stated on the document;
4. the identity of each ' person who signed it;
5. the identity of each person to whom it is addressed.

D. As used herein, the singular form of a noun or pronoun shall be considered to include within its meaning the plural form of the noun or pronoun so used, and vice versa; similarly, the use of the masculine form of a pronoun shall be considered to include also within its meaning the feminine form of the pronoun so used, and vice versa; and in a similar fashion any tense of any verb used herein shall be considered also to include within its meaning all other tenses of the verb so used.

E. The use of the word "or" is the inclusive form of that conjunction, implicitly including within its meaning the word "and."

i 2.

l F. Should you have any questions regarding the meaning of any term or interpretation of any interrogatory, you are encouraged to consult with counsel regarding such questions.

DEFINITIONS (1) " ANSI" means American National S tandards Institute.

(2) " Appendix A" means Appendix A to part 50 of 10 C.F.R.

(3) " Appendix B" means Appendix B to part 50 of 10 C.F.R.

(4) "Bechtel" means the Bechtel Power Corporation.

(5) " Corrective Action Prog ram" (CAP) means the DCP Internal Technical Program.

(6) "Diablo Canyon" means units 1 and 2 of the Diablo Canyon Nuclear Power Plant, including all structures, sys tems, and components at the site.

(7) "Diablo Canyon Projec t" (DCP) means PG&E, Bechtel, all joint projects of PG&E and Bechtel concerning Diablo Canyon, and all contractors, subcontrac tor s, consultants, and agents of the foregoing, excluding the IDVP .

(8) " Document" means any and all things that constitute -

4

" writings" pursuant to rule 1001 of the Federal Rules of Evidence.

(9) "Important to safety" means SS&Cs that provide reasonable assurance that the facility can be operated without undue risk to the health and safety of the public.

(10) " Independent Design Verification Program" (IDVP) means the program established by the November 19, 1981, order of the Nuclear Regulatory Commission (NRC), the November 19, 1981, letter f rom Harold Denton to Malcolm Furbush, and implementing 3.

directives of the NRC staf f, as that program may have been modified since that date.

(11) " Person" includes natural persons, corporations, partnerships, other business entities, and public agencies.

(12) "PG&E" means the Pacific Gas and Electric Company and its agents, employees, contractors, subcontractors, af filia tes, departments, divis ions, units, subunits, and attorneys, excluding the IDVP.

(13) " Procured components" are components that were purchased by PG&E, rather than designed by employees of PG&E or PG&E design contrac tor s.

(14) " Quality assurance" means all those planned and systematic actions necessary to provide adequate confidence that a structure, system, or component will perform satisfactorily in service. Quality assurance includes quality control.

(15) " Quality control" means those quality assurance actions related to the physical character istics of a material, str uc tu re , component, or system, which provide a means to control the quality of the material, structure, component, or system to predetermined requirements. .

(16) " Reg. Guide" means a Regulatory Guide of the Nuclear Regulatory Commission.

(17) " Safety-related" means those SS&Cs necessary to assure: (1) the integrity of the reactor coolant pressure boundary; (2) the capability to shut down the reactor and maintain it in a safe shutdown condition; or (3) the capability 4.

to prevent or mitigate the consequences of accidents which could result in potential off-site exposures comparable to the guideline exposu res of 10 C.F.R. part 100.

(18) "SS&C' means structures, systems , and components.

(19) " WASH-1283" means the document issued by the Atomic Energy Commission on or about May 24, 1974, entitled " Guidance on Quality Assurance Requirements During Design and Procurement Phase of Nuclear Power Plants -- Revision 1. "

(20) "You" and "your" refer to Teledyne Engineering Services and, accord ing to context, to its subcontractors.

INTERROGATORIES

1. Have you determined whether PG&E complied with each and every criterion of Appendix B in the seismic design of safety-related SS&Cs at Diablo Canyon performed before institution of the CAP?
2. If you made such a determination, for each criterion what was that determination?
3. Have you determined whether PG&E complied with each and every criterion of Appendix B in the seismic design of safety-related SS&Cs at Diablo Canyon performed since institution of the CAP?
4. If you made such a determination, for each criterion what was that determination?
5. Have you determined whether PG&E complied with each and every criterion of Appendix B in the nonseismic design of safety-related SS&Cs at Diablo Canyon before institution of the CAP?

5.

l

6. If you made such a determination, for each criterion what was that determination?
7. Have you determined whether PG&E complied with each and every criterion of Appendix B in the nonseismic design of safety-related SS&Cs at Diablo Canyon since institution of the CAP?
8. If you made such a determination, for each criterion what was that determination?
9. Have you determined whether PG&E complied with each and every quality assurance requirement of Appendix A in the design of safety-related Diablo Canyon SS&Cs performed before institution of the CAP?
10. If you made such a determination, for each quality assurance requirement what was that determination?
11. Have you determined whether PG&E complied with each and every quality assurance requirement of Appendix A in the design of safety-related Diablo Canyon SS&Cs performed since institution of the CAP?
12. If you made such a determination, for each quality assurance requirement what was that determination?
13. Have you determined whether PG&E complied with each and every quality assurance requirement of Appendix A in the i design of important to safety but not safety-related Diablo l

Canyon SS&Cs designed before institution of the CAP?

l 14. If you made such a determination, for each quality l

I assurance requirement what was that determination?

l 6.

1 i

,- - - , - - , , - ,. ...n , . , . - - - , .~ . , .-.

15. Have you determined whether PG&E complied with each and every quality assurance requirement of Appendix A in the design of important to safety but not safety-related Diablo Canyon SS&Cs designed since institution of the CAP?

16 . If you made such a determination, for each quality assurance requirement what was that determination?

17 . Have you determined whether PG&E complied with WASH-1283 in the design of Diablo Canyon?

18 . If you made such a determination, what was that determination?

19. With respect to each of the ANSI standards specified below in items A through G, state separately:

(a) Have you determined whether PG&E complied with the standard in the seismic design of Diablo Canyon performed before institution of the CAP?

(b) If you made such a determination, what was that de te rmination? Your answer should ind icate :

(i) against which revision of each standard J

compliance was tested; (ii) the periods during which compliance was found to exist; and (iii) for which design groups in the design chain compliance was found to exist.

The standards to which this interrogatory refers are:

(A) ANSI N45.2 (B ) ANSI N45.2.9 (C) ANSI N45.2.10 7.

i i

(D) ANSI N45.2.ll (E) ANSI N45.2.12 (F) ANSI N45.2.13 (G) ANSI N45.2.23.

20. With respect to each of the ANSI standards specified below in items A through G, state separately:

(a) Have you determined whether PG&E complied with the standard in the seismic design of Diablo Canyon performed since institution of the CAP?

( b) If you made such a determination, what was that de te rmina tion? Your answer should indicate:

(i) against which revision of each standard compliance was tested; (ii) the periods during which compliance was found to exist; and (iii) for which design groups in the design chain compliance was found to exist.

The standards to which this interrogatory refers are:

(A) ANSI N45.2 i

(B ) ANSI N45.2.9 (C) ANSI N45.2.10 (D) ANSI N45.2.ll (E) ANSI N45.2.12 (F) ANSI N45.2.13 (G) ANSI N45.2.23.

8.

f. .
21. With respect to each of the ANSI standards specified below in items A through G, state separately:

(a) Have you determined whether PG&E complied with the standard in the nonseismic design of safety-related Diablo Canyon SS&Cs designed before institution of the CAP?

(b) If you made such a determination, what was that de termination? Your answer should indicate:

(i) against which revision of each standard compliance was tested; (ii) the periods during which compliance was found to exist; and (iii) for which design groups in the design chain compliance was found to exist.

The standards to which ttis interrogatory refers are:

(A) ANSI N45.2 (B ) ANSI N45.2.9 (C) ANSI N45.2.10 (D) ANSI N45.2.ll (E) ANSI N45.2.12 (F) ANSI N45.2.13 (G) ANSI N45.2.23.

22. With respect to each of the ANSI standards specified below in items A through G, state separately:

(a) Have you determined whether PG&E complied with the standard in the nonseismic design of safety-related Diablo Canyon SS&Cs designed since institution of the CAP?

9.

l.

l

l. - - . . _ . _ . _ . . _ .-. - _ _ . _ _ . . . _ _ _ , _ , . . _ . - _ _ - _ - _ _ _ _ _
r. .

(b) If you made such a determination, what was that de te rmina tion? Your answer should ind icate :

(i) against which revision of each standard compliance was tested; (ii) the periods during which compliance was found to exist; and (iii) for which design groups in the design chain compliance was found to exist.

The standards to which this interrogatory refers are:

(A) ANSI N45.2 (B) ANSI N45.2.9 (C) ANSI N45.2.10 (D) ANSI N45.2.ll (E) ANSI N45.2.12 (F) ANSI N45.2.13 (G) ANSI N45.2.23.

23. With respect to each of the Reg. Guides specified below in items A through G, state separately:

(a) Have you determined whether PG&E complied with the Reg. Guide in the seismic design of Diablo Canyon performed before institution of the CAP?

(b) If you made such a determination, what was that de te rmina tion? Your answer should indicate:

(i) against which revision of each Reg. Guide complia1ce was tested; (ii) the periods during which compliance was found to exist; and 10.

1

, (iii) for which design groups in the design chain 1

compliance was found to exist.

i l The Reg. Guides to which this interrogatory refers are:

i i (A) 1.28 i

j (B) 1.88 i

(C) 1.74 (D) 1.64 f (E) 1.144 1

i i

(F) 1.123 (G) 1.146 4 24. With respect to each of the Reg. Guides specified i

below in items A through G, state separately:

) (a) Have you determined whether PG&E complied with i'

the Reg. Guide in the seismic design of Diablo Canyon performed since institution of the CAP?

4 i (b) If you made such a determination, what was that de te rmina tion? Your answer should indicate:

(i) against which revision of each Reg. Guide

compliance was tested; i

l (ii) the periods during which compliance was found to exist; and (iii) for which design groups in the design chain i compliance was found to exist.

j The Reg. Guides to which this interrogatory refers are:

{ (A) 1.28 (B ) 1.88 (C) 1.74 l

11.

=~w- '-

  • d IP' j '""' 9't-e-9 =T--"-*
f. -

(D) 1.64 (E) 1.144 (F) 1.123 (G) 1.146

25. With respect to each of the Reg. Guides specified below in items A through~ G, state separately:

(a) Have you determined whether PG&E complied with the Reg. Guide in the nonseismic design of safety-related SS&Cs at Diablo Canyon designed before institution of the CAP?

(b) If you made such a determination, what was that de termination? Your answer should indicate:

(i) against which revision of each Reg. Guide compliance was te s ted ;

(ii) the periods during which compliance was found to exist; and (iii) for which design groups in the design chain compliance was found to exist.

The Reg. Guides to which this interrogatory refers are:

(A) 1.28 (B) 1.88 (C) 1.74 (D) 1.64 (E) 1.144 (F) 1.123 (G) 1.146 12.

ri .

l

26. With respect to each of the Reg. Guides specified l below in items A through G, state separately:

(a) Have you determined whether PG&E complied with the Reg. Guide in the nonseismic design of safety-related SS&Cs at Diablo Canyon designed since instit'ution of the CAP?

(b) If you made such a determination, what was that determination? Your answer should indicate:

(i) against which revision of each Reg. Guide compliance was tested; (ii) the periods during which compliance was found to exist; and (iii) for which design groups in the design chain compliance was found to ex ist.

The Reg. Guides to which this interrogatory refers are:

(A) 1.28 (B) 1.88 (C) 1.74 (D) 1.64 (E) 1.144 (F) 1.123 (G) 1.146

27. Has the seismic design work of each and every design group in the design chain for each and every safety-related SS&C designed before institution of the CAP been reviewed by the IDVP?

13.

1

O *

28. If your answer to the preceding interrogatory is other than an unqualified "yes," for all safety-related SS&Cs that have not been so reviewed state:

(a) the identity and locations of the SS&Cs, and the identity of the design groups whose work was not reviewed; (b) the reason for their exclusion from review; (c) the identity of the person responsible for the decision to exclude them; (d) whether you have formed an opinion as to whether the SS&C meets PG&E's licensing commitments and the regulatory requirements; (e) if you have formed such an opinion, what your opinion is and the basis of your opinion.

29. Has the seismic design work of each and every design group in the design chain for each and every safety-related SS&C designed since institution of the CAP been reviewed by the IDVP?
30. If your answer to the preceding interrogatory is other than an unqualified "yes," for all safety-related SS&Cs that have not been so reviewed state:

(a) the identity and locations of the SS&Cs, and the identity of the design groups whose work was not reviewed; (b) the reason for their exclusion from review; (c) the identity of the person responsible for the decision to exclude them;

~

14.

r. .

(d) whether you have formed an opinion as to whether the SS&C meets PG&E's licensing commitments and the regulatory requirements; (e) if you have formed such an opinion, what your opinion is and the basis of your opinion.

31. Has the seismic qualification of all procured components used in safety-related SS&Cs been reviewed by the IDVP?
32. If your answer to the preceding interrogatory is other than an unqualified "yes," for all such procured components

. that have not been so reviewed state:

(a) their identity and locations; (b) the vendor or vendors; (c) the reason for their exclusion from review; (d) the identity of the person responsible for the decision to exclude them; (e) whether you have formed an opinion as to whether use of the procured components meets PG&E's licensing commitments and the regulatory requirements;

( f) if you have formed such an opinion, what your opinion is and the basis of your opinion.

33. Has the seismic design work of each and every design group in the design chain for each and every safety-related SS&C that was reviewed by the IDVP been reviewed for the DE, DDE, and Hosgri earthquake?
34. If your answer to the preceding interrogatory is other than an unqualified "yes," for all safety-related SS&C that was not reviewed for all three earthquakes state:

15.

l L

(a) the identity and locations of the SS&Cs, and the identity of the design groups whose work was not reviewed; (b) for which of the three earthquakes they were not reviewed; (c) the reason for their exclusion from review for that earthquake; (d) the identity of the person responsible for the decision to exclude them; (e) whether you have formed an opinion as to whether the SS&C meet PG&E's licensing commitments and the regulatory requirements with respect to the earthquakes for which they we re not reviewed; (f) if you have formed such an opinion, what your opinion is and the basis of your opinion.

35. Has the seismic qualification of all procured components used in safety-related SS&Cs that were reviewed by the IDVP been reviewed for the DE, DDE, and Hosgri earthquake?
36. If your answer to the preceding interrogatory is other than an unqualified "yes," for all such procured components that have not been so reviewed state:

(a) their identity and locations; (b) the vendor or vendors; (c) for which of the three earthquakes they were not reviewed; (d) the reason for their exclusion from review for that earthquake; 16.

(e) the identity of the person responsible for the decis ion to exclude it;

( f) whether you have formed an opinion as to whether use of the co,mponent meets PG&E's licensing commitments and the regulatory requirements with respect to the earthquakes for which it was not reviewed; (g) if you have formed such an opinion, what your opinion is and the basis of your opinion.

37. Has the nonseismic design work of each and every design group in the design chain for each and every 1

safety-related SS&C been reviewed by the IDVP?

38. If your answer to the preceding interrogatory is other than an unqualified "yes," for all safety-related SS&Cs that have not been so reviewed state:

(a) the identity and locations of the SS&Cs, and the ident'ty i of the design groups whose work was not reviewed; (b) the reason for their exclusion from review; (c) the identity of the person responsible for the decision to exclude them; (d) whether you have formed an opinion as to whether the SS&C meets PG&E's licensing commitments and the regulatory requirements; '

(e) if you have formed such an opinion, what your opinion is and the basis of your opinion.

39. For each and every EOI, with the exception of those relating solely to construction quality assurance, state the following:

17 .

(a) when the event giving rise to the EOI occurred; (b) what quality assurance program or implementation deficiency allowed the event to occu r ;

(c) what quality assurance program or implementation deficiency allowed the event to remain undetected; (d) what quality assurance program or procedures should have discovered the event; (e) what other quality assurance program or procedu res was or were in tended to detect the event through redundant review;

( f) your opinion as to whether the event had generic implications and the basis for your opinion; (g) your opinion as to whether the failure to detect the event had generic implications and the basis for your opinion; (h) what you did to determine that corrective action was properly taken to close out the EOI .

(i) if the EOI is listed in your Final Report as incomplete in any way, state:

1) each and every task remaining to be completed before the EOI will be closed;
2) the date by which the EOI is expected, as of the date of your answer, to be closed.

If any action is required by PG&E before the EOI can be closed, state what action by PG&E is required and the date by which you expect PG&E to complete it.

18.

40. For all activities, evaluations, and items other than EOIs stated in the IDVP Final Report as incomplete, identify:

(a) each and every task remaining to be completed before the activity, evaluation, or item will be completed; (b) the date by which the activity, evaluation, or item is expected, as of the date of your answer, to be completed. If any action is required by PG&E before the activity, evaluation, or item can be completed, state what l action by PG&E is required and the date by which you expect l PG&E to complete it.

l l 41. If your answer to any of the preceding interrogatories 1

applies dif ferently to unit 1 and unit 2 of Diablo Canyon, identify the interrogatory and explain how the answer differs for unit 1 and unit 2. I j

j 42. For each of the preceding in te rrogator ies, state separately for each interrogatory:

(a) the identity of each and every person who participated in its answer; 19.

. = ~

i (b) the identity of each and every document relied upon in preparing the answer.

DATED: July 8, 1983 JOHN K. VAN DE KAMP, Attorney General of the State of California ANDREA SHERIDAN ORDIN, Chief Assistant Attorney General MICHAEL J. STRUMWASSER, Special Counsel to the Attorney General SUSAN L. DURBIN, PETER H. KAUFMAN, Deputy Attorneys General By 'I 4 O N 4L - '_ 6 "

SUSAN L. DURBIN Attorneys for Governor George Deukmejian 3580 Wilshire Boulevard Suite 800 Los Angeles, California 90010 (213) 736-2105 a

4 20.

i

--, , - - -