Responds to NRC Re Violations Noted in IE Insp Repts 50-317/83-11 & 50-318/83-11.Corrective Actions:Logs Will Be Required to Name Individual Receiving Grab Sample Info & Air Filter Test Performed on Affected Filters
ML20072M848
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 06/13/1983
From: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20072M820 List:
References
NUDOCS 8307150110
Download: ML20072M848 (2)


Text

m BALTIM O R E GAS AND ELECTRIC CHARLES CENTER P.O. BOX 1475 BALTIMORE, MARYLAND 21203 ARTHUP EL LUNDVALL, JR.

VICE PRESIDENT June 13,1983 U. S. Nuclear Regulatory Commission Docket Nos.

50-317 Region I 50-318 631 Park Avenue King of Prussia, PA 19406 License Nos.

DPR-53 DPR-69 ATTENTION:

Richard W. Starostecki, Director Division of Project and Resident Programs Gentlemen:

This refers to your Inspection Report 50-317/83-11; 50-318/83-11, which transmitted two items of apparent non-compliance with NRC requirements. Enclosure (1) to this letter is a written statement in reply to those items noted in your letter of May 16,1983.

Should you have further questions regarding this reply, we will be pleased to discuss them with you.

Very truly yours,

} f

/

r

'( < f, _

v4f -

Vice President-Supply AEL/ LOW /sjb Enclosure cc:

J. A. Biddison, Esquire G. F. Trowbridge, Esquire D. H. Jaffe, NRC R. E. Architzel, NRC 8307150110 830711 PDR ADOCK 05000317 o

PDR

~

t t

l l

ENCLOSUREl REPLY TO APPENDIX A OF NRC INSPECTION REPORT NO. 50-317/83-11; 50-318/83-11 ITEM A.1 Grab samples were not initiated while the Main Vent Particulate Monitor was inoperable due to a communications problem.

In the future when the Main Vent Particulate Monitors are inoperable, the operator who relays that information to the Chemistry group will be required to log the name of the individual receiving the information. When the Chemistry group is notified of Radiation Monitor System detector inoperability, they will obtain appropriate grab samples.

ITEM A.2 1

The Spent Fuel Pool Ventilation System High Efficiency Particulate Air Filter Test has I

been performed on the affected filters. To preclude the possiblity of missed surveillance during post fire recovery actions, a change is being incorporated into the Emergency Response Plan Implementing Procedures to ensure appropriate follow-up actions, (i.e.,

surveillance testing is performed.) This change to the procedures will be completed by no later than August 1,1983.