ML20072M735
| ML20072M735 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 08/23/1994 |
| From: | Wanczyk R VERMONT YANKEE NUCLEAR POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| BVY-#94-86, NUDOCS 9409020152 | |
| Download: ML20072M735 (1) | |
Text
SAFEGUADS
- V ERMONT Y
'EEE
\\, FO R V A-10 N,'
NUCLEhR M.OWER CORPORATION P.O. Box 157, Governor Hunt Road
- ^
[tg/
Vernon, Vermont 05354-0157
\\
I;'
(802) 257-7711
,V August 23, 1994
.)
BVY #94-86 United States Nuclear Regulatory Commission Attn Document Control Desk Washington, DC 20555
Subject:
Replacement of Protected Area Barrier
References:
Vermont Yankee Physical Security Plan - Chapter 4,
" Physical Barriers"; Chapter 6,
" Detection Aids"
Dear Sir:
As previously discussed with security Specialists of the Region I office this letter is to confirm that the Vermont Yankee Protected Area (PA) barrier project will affect site security operations and configuration as described herein.
These activities will commence on or after August 29, 1994 and conclude during late October or early November 1994.
At the conclusion and on finsi acceptance of the proje:t all permanent changes resulting from the construction will be submitted in a reviFlon to our Security Plan, in accordance with the provisions of 10CFR50.54 (p).
The construction phase of the project will require a temporary re-definition of the protected area boundary as well as allowing work activity in the isolation zones.
Appropriate security compensatory measures will be established prior to removal of the existing barrier and intrusion detection system. The construction area will be limited to smaller individual sections that will be moved as the old barrier is removed and the new barrier is installed. A temporary PA boundary will be established which will allow construction to occur outside the re-defined PA.
The PA boundary will be largely maintained intact either by the existing barrier or the new barrier.
This approach will provide a high assurance against undetected or unauthorized access to the PA.
A Safeguards Information enclosure provides a diagram of the Vermont Yankee PA boundary.
This diagram describes a typical project work zone, delineating the temporary re-definition of the PA boundary line and the compensatory measures that will be in place during the time each area is under construction.
We trust you will find the above information adequate, however should you have any questions, please do not hesitate to contact Gregory L. Morgan, Security Manager at (802) 257-7711 ext. 2121.
Sincerely VERMONT YANKEE NUCLEAR POWER CORPORATION l
LAW w s
Robe t J. Wanczyk P1 Manager enclosure cc:
(2) Region I (1) Harold Eichenholz - Senior NRC Resident Inspector, Vermont Yankee ATTACHMENT CONTAINS SAFEGUARDS INFORMATION.
f ON SEPARATION HANDLE THIS LETTER AS DECONTROLLED.
\\
INFORMATIO
(\\
t 94O9020152 940823 PDR ADOCK 05000271 F
png
(,