Forwards Page 6-16 to Rev 2 to Emergency Plan,Inadvertently Not Reproduced When Amended.Emergency Plan Will Be Corrected W/Next Amend.Related Correspondence
ML20072L260
Person / Time
Site: Limerick  
Issue date: 07/08/1983
From: Wetterhahn M
CONNER & WETTERHAHN, PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Brenner L, Cole R, Morris P
Atomic Safety and Licensing Board Panel
References
NUDOCS 8307130232
Download: ML20072L260 (2)


Text

._

\\.s',* b 4.u trco cor.nESPn\\~nrvar C

r.Aw orricEs GONNER 6e WETTERHAHN. P.G'Y S ~

~$

a--

1747 PENNSYLVANIA AVENUE. N. W.

f

'h

!,Ed, 4

g,

\\

  • / ins al w7dl"uI"n's w^s trtNoro N. n. c. aoooe ROB E S Y M. B A D 9. R as***g Q

e ** $ "g g

  • swonT w.otsow 4

' Y U*~

awcE woo AE. Ja

  • y Ro 8ERT H. P t' R L s
  • L*ICO......

July 8, 1983 f*""

RESS: ATOM LAW Judge Lawrence Brenner Judge Richard F. Cole Atomic Safety and Atomic Safety and Licensing Board Licensing Board

/

U.S. Nuclear Regulatory

.U.S.

Nuclear Regulatory Commission Commission Washington, D.C.

20555 Washington, D.C.

20555 Judge Peter A. Morris Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C.

20555 In the Matter of Philadelphia Electric Company (Limerick Ge6erating Station, Units 1 and 2)

Docket Nos. 50-352%nd 50-353 Gentlemen:

It has come to my attention that page 6-16 of the Limerick Generating Station Emergency Plan was inadvertently not reproduced when the plan was amended.

I am enclosing a copy of page 6-16 for the convenience of the Board and parties.

This matter will be corrected when the emergency plan is next amended.

Sincerely, V

e Mark J. Wetterhahn Counsel for the Applicant MJW/dlf Enclosure cc:

Service List O

l-0 2

PDR eso3 j

I

/N jU!. O S 19

-i, C

%D LGS EP

%J

~

6.4.2 USE OF ON-SITE PROTECTIVE EQUIPMENT AND SUPPLIES Various equipment used for radiological purposes is readily available at the station.

This equipment includes protective clo thing, respiratory equipment, and radioprotectiv.e drug for thyroids.

Routine use of the clothing and respirators is part of the applied radiation protection program.

Additional equipment is available in the # station storeroom and In emergency kits at specific locations.

Under emergency conditions, the number of persons requiring protective equipment would be limited by measures such as protective cover or evacuation and should consist primarily of emergency team

members, i

6.4.2.1 INDIVIDUAL RESPIRATORY PROTECTION Respiratory protective devices are issued to make.it possible to significantly reduce the internal exposure to radionuclides.

Self-contained breathing apparatus (SCBA) or airline respirators shall be used in emergencies involving oxygen deficient atmospheres, areas of suspected or known high airborne radioactivity, or unknown condition's.s Implementing procedures y,

detail criteria for respirator use based upon atmospheric content.

Respiratory equipment is maintained at' storage areas in t

the plant, as well as at the various emergency control centers.

Self-contained breathing apparatus are available for' Control Room i

personnel.

6.4.2.2 PROTECTIVE CLOTHING Supplies of this apparel include coveralls, rubber gloves, shoe covers and boots, caps and hoods, and plastic suits.

Inventories are maint'ained for normal plant use by the health physics and maintenance personnel.

Emergency supplies shall be kept at the Control Room area and emergency control centers.

This clothing g shall be. issued to. emergency teams and other personnel required to enter known or suspect areas of radioactive contamination, and to personnel required to work in or occupy contaminated areas.

For other than etergency workers, normal street clothing is considered to be adequate protective apparel for the process of departing the plant.

6~.'4. 2. 37SE DF RADIOPh0TECTIVE DRUGS For virtually every significant postulated accident at a nuclear power station, the release of radiciodines with the associated risk of thyroid exposure would present the greatest demand for

{l 6-16 Rev.