MONTHYEARML20217N3171999-10-19019 October 1999 Rev 1,change 024-01-0 to OP-1903.011, Emergency Response Notifications ML20217J7641999-10-0505 October 1999 Rev 1 to Unit 1 Technical Requirement Manual, Replacing Index Page ML20216G0881999-09-19019 September 1999 Proposed Tech Specs Pages,Changing TS 4.18.5.a.9 & Associated Bases for One Cycle of Operation Through End of Cycle 16 for Suppl Use of OTSG Repair Roll Technology ML20212F5851999-09-17017 September 1999 Proposed Tech Specs Pages,Changing TS by Revising Curie Limits for Radioactive Gas Storage Tanks ML20216G0721999-09-17017 September 1999 Proposed Tech Specs,Revising Once Through SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Volumetric Integranular Attack ML20211P0061999-09-0707 September 1999 Proposed TS in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria ML20211B3291999-08-19019 August 1999 Proposed TS 4.18.3.a.4 Clarification Supporting Tube End Cracking Alternative Repair Criteria ML20211C4101999-08-18018 August 1999 Proposed Tech Specs Removing Requiremets for Tube Repair (Sleeving) & Clarifying Requirements for Preservice & ISI of Tubes to Facilitate Replacement of Original SGs ML20211C1701999-08-18018 August 1999 Proposed Tech Specs Revising ESAS Low RCS Pressure Setpoint to Ensure That TS Adequately Bounds Safety Analysis ML20210N5541999-08-0404 August 1999 Rev 28,Permanent Change 4 to OP-1903.061, Communication Equipment Test ML20210N5571999-08-0404 August 1999 Rev 23,Permanent Change 5 to OP-1903.011, Emergency Response/Notifications ML20210K5121999-07-29029 July 1999 Proposed Tech Specs,Revising Requirements Associated with Plant Station Batteries & DC Sources to 125 Vdc Switchyard Distribution Sys ML20210K3571999-07-29029 July 1999 Proposed Tech Specs Revising SRs Pertaining to ISI Requirements for SG Tube Circumferential Cracking at top-of-tubesheet During 2P99 Planned mid-cycle Outage ML20209H5811999-07-14014 July 1999 Proposed Tech Specs Revising RB Structural Integrity Requirements Re ISI Reporting for Containment Structures, Tendons & Anchorages ML20209H8701999-07-14014 July 1999 Proposed Tech Specs 6.2.2 & 6.2.2.h,replacing Functional Description of Operations Staff Middle Manager with Ref to Functional Description Assistant Operations Manager & Revising TS Table 6.2-1 Item 5 & TS 6.2.2.f ML20209H9721999-07-14014 July 1999 Proposed Tech Specs Changes for Elimination of Programmatic Requirements Associated with PASS & Regulatory Relief from PASS Requirements of NUREG-0737 & RG 1.97 ML20195D2371999-06-0101 June 1999 Proposed Tech Specs Re Surveillance Requirements & Applicable Bases Relevant to ISI Requirements for Portions of once-through SG (OTSG) Tubes Adjacent to Primary Cladding Region of tube-to Tubesheet Roll ML20206T2651999-05-14014 May 1999 Proposed Tech Specs Revising SG Tubing SRs ML20206Q1281999-05-10010 May 1999 Proposed Tech Specs Bases,Page B 2-2,discussing Guidance to Be Used When Applying Later Editions & Addendas of ASME Code to RCS Components ML20206J8021999-05-0404 May 1999 PC-03 to Procedure/Work Plan 1904-002, Offsite Dose Projections Rdacs Computer Method ML20205P6931999-04-0909 April 1999 Proposed Tech Specs Change,Adding Specification 3.0.6 & Associated Bases to ANO-2 ML20205P3731999-04-0909 April 1999 Revised Proposed TS Page 5-1 Re Design Features Conversion ML20205P6431999-04-0909 April 1999 Revised Proposed Technical Requirement Manual Pages ML20205P4081999-04-0909 April 1999 Proposed Tech Specs Changes,Revising Reactor Bldg Structural Integrity Requirements ML20205P6291999-04-0909 April 1999 Proposed Tech Specs Changes,Revising Battery Requirements ML20207C0631999-02-25025 February 1999 Proposed Tech Specs Change Revising Action 2 Associated with Table 3.3-1, Reactor Protective Instrumentation. Change Adds Footnote to Action 2 Allowing Startup with Functional Units Associated with Channel D Excore Inoperable ML20207M7561999-02-24024 February 1999 Proposed Tech Specs,Allowing Startup & Continued Operation of Plant with Channel D Detector Until New Detector Is Installed During mid-cycle Outage Scheduled for Nov 1999 ML20198K1341998-12-17017 December 1998 Corrected Tech Specs Pages to 980629 Application for Amend to License NPF-6 ML20198A3661998-12-0808 December 1998 Proposed Tech Specs B3/4 6-3 & B3/4 6-4,deleting All Requirements Associated with Sodium H Addition Sys & Adding New Requirements for Trisodium Phosphate to Be Stored in Containers Located on Floor of Cb ML20196B4381998-11-24024 November 1998 Proposed Tech Specs Pages,Changing Administrative Controls Section to Implement Consolidated QA Plan Manual & Clarifying Responsibilities on STA Position on Shift ML20196C9761998-11-24024 November 1998 Rev 1 to Unit 2 Technical Requirements Manual ML20154D6681998-10-0101 October 1998 Rev 28 to Procedure/Work Plan 1904.002, Offsite Dose Projections Rdacs Computer Method ML20153D8491998-09-17017 September 1998 Proposed Tech Specs 2.2.1,3.3.1.1 & 3.3.2.1 Re Operating Bypass Setpoint ML20153H1651998-08-12012 August 1998 Rev 0 to ANO Units 1 & 2 Technical Requirements Manual ML20236Y5251998-08-0606 August 1998 Proposed Tech Specs Section 3.1.3.2,revising Action Requirements for CEA Position Indicator Channels ML20236Y5081998-08-0606 August 1998 Proposed Tech Specs Section 3.3.4.B Re Sodium Hydroxide Tank Limits ML20236Y5951998-08-0606 August 1998 Proposed Tech Specs,Revising Requirements Associated W/Units 1 & 2 Control Room Emergency Ventilation Sys ML20236Q2781998-07-13013 July 1998 Proposed Tech Specs Re Safety Limits & Limiting Safety Settings ML20236G6921998-06-29029 June 1998 Proposed Tech Specs,Revising TS 3.4.2 & TS 3.4.12 Re Reactor Coolant Sys Safety Valves & Low Temp Overpressure Protection ML20236G5421998-06-29029 June 1998 Proposed Tech Specs,Revising Surveillance Testing Requirements for Unit 2 Direct Current Electrical Distribution Sys ML20236G5631998-06-29029 June 1998 Proposed Tech Specs,Revising Table 3.3-4 to Provide Range of Acceptable Values for 4160 Volt Bus Loss of Voltage Values ML20236G4911998-06-29029 June 1998 Proposed Tech Specs Re MSSVs & Pressurizer Safety Valves ML20199F7211998-05-22022 May 1998 Rev 8 to Simulator Mod Control,Training Desk Guide 6.3 ML20217N6141998-04-30030 April 1998 Proposed Tech Specs 1.6.1,revising Definition of Quadrant Power Tilt ML20217M2621998-04-30030 April 1998 Proposed Tech Specs Re DG Load Rejection Testing ML20217M4871998-04-28028 April 1998 Proposed Tech Specs Changing Order of Channel Rotation During Outage for Scheduling Flexibility,While Still Requiring Rotation Schedule to Be Established for Operating Cycle ML20217P8141998-04-0101 April 1998 Proposed Tech Specs Re Upper Tubesheet Volumetric Indications to Remain in Svc for Cycle 15 ML20216J7841998-03-17017 March 1998 Proposed Tech Specs Bases Change Concerning Plant Protection Sys Matrix Logic Testing ML20203D1061998-02-18018 February 1998 Proposed Tech Specs Revising Surveillance Testing Requirements for Emergency Feedwater Sys ML20202G9771998-02-0909 February 1998 Proposed Tech Specs Pages,Allowing Use of Repair Roll Technology (Reroll) for Upper Tubesheet Region of SGs 1999-09-07
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20217N3171999-10-19019 October 1999 Rev 1,change 024-01-0 to OP-1903.011, Emergency Response Notifications ML20217J7641999-10-0505 October 1999 Rev 1 to Unit 1 Technical Requirement Manual, Replacing Index Page ML20210N5571999-08-0404 August 1999 Rev 23,Permanent Change 5 to OP-1903.011, Emergency Response/Notifications ML20210N5541999-08-0404 August 1999 Rev 28,Permanent Change 4 to OP-1903.061, Communication Equipment Test ML20206J8021999-05-0404 May 1999 PC-03 to Procedure/Work Plan 1904-002, Offsite Dose Projections Rdacs Computer Method ML20205P6431999-04-0909 April 1999 Revised Proposed Technical Requirement Manual Pages ML20196C9761998-11-24024 November 1998 Rev 1 to Unit 2 Technical Requirements Manual ML20154D6681998-10-0101 October 1998 Rev 28 to Procedure/Work Plan 1904.002, Offsite Dose Projections Rdacs Computer Method ML20153H1651998-08-12012 August 1998 Rev 0 to ANO Units 1 & 2 Technical Requirements Manual ML20199F7211998-05-22022 May 1998 Rev 8 to Simulator Mod Control,Training Desk Guide 6.3 ML20202E1611997-12-0101 December 1997 IST Program Third Ten Yr Interval Submittal. W/32 Oversize Drawings ML20211Q1221997-10-14014 October 1997 Rev 22,change 2 to OP-1903.011, Emergency Response Notifications ML20198J8081997-10-14014 October 1997 Rev 28,Permanent Change 2 to Procedure/Work Plan 1903.061, Communications Equipment Tests ML20217K3001997-08-0808 August 1997 Change PC-03,Rev 21 to Work Plan 1903.030, Evacuation ML20151K2241997-07-29029 July 1997 Change PC-01,Rev 6 to OP-1903.035, Adm Potassium Iodide ML20148T0441997-07-0101 July 1997 Change PC-01 to Rev 12 to Procedures OP-1903.067, Emergency Response Facility - Emergency Operations Facility (Eof) ML20148T0221997-07-0101 July 1997 Change AP-06 to Rev 6 to Procedure OP-1903.035, Adm Potassium Iodide ML20148T0051997-07-0101 July 1997 Change PC-01 to Rev 32 to Procedure OP-1903.060, Emergency Supplies & Equipment ML20141C5421997-06-17017 June 1997 2 to Procedure Work Plan 1903.065, Emergency Response Facility Technical Support Center (Tsc) ML20148T5391997-06-0101 June 1997 Rev 0 to Third Ten-Year Interval ISI Plan for ANO Unit 1 ML20140C0951997-03-26026 March 1997 Rev 11,Change AP-11,to OP-1903.034, Emergency Operations Facility Evacuation ML20137D9271997-03-18018 March 1997 Rev 21-04-00,Change PC-04 to OP-1903.011, Emergency Response/Notifications ML20137W3621997-03-17017 March 1997 Rev 2 to Test Procedure TR-228, Three Hour Fire Test of One and Three Hour Versawrap Raceway Fire Barrier Sys for Conduits & Cable Trays ML20115D8901996-07-10010 July 1996 Permanent Change (Pc) PC-03 to Rev 11 to OP-1903.065, Emergency Response Facility Tsc ML20107G3981996-04-17017 April 1996 Rev 4 to Procedure 1903.053, Logistical Support, Combining Procedures 1903.054 & 1903.078 in W/Procedure 1903.053 & Deleting Procedures 1903.054 & 1903.078 Completely ML20107G4231996-04-17017 April 1996 Rev 4 to Procedure 1903.078, Emergency Response Support, Deleting Procedure.Info from Procedure Incorporated Into Procedure 1903.053, Logistical Support ML20107G4011996-04-17017 April 1996 Rev 6 to Procedure 1903.054, Addl Personnel, Deleting Procedure.Pertinent Info,Instructions & Requirements from Procedure Will Be Incorporated Into Procedure 1903.053, Logistical Support ML20101E3851996-03-13013 March 1996 Rev 15 to OP-1903.062, Communication Sys OP Procedure ML20101E3571996-03-13013 March 1996 Rev 28 to OP-1903.061, Communication Equipment Test ML20101E3771996-03-13013 March 1996 Rev 8 to OP-1903.066, Emergency Response Facility Osc ML20097B2221996-02-0606 February 1996 Change AP-33 to Rev 33 to OP-1903.010, EAL Classification ML20095F9611995-12-0707 December 1995 Permanent Change (Pc) PC-02 to Rev 27 to Procedure/Work Plan OP-1904.002, Offsite Dose Projection Rdacs Computer Method ML20091K8261995-08-28028 August 1995 Change PC-1 to Rev 9 to Procedure/Work Plan 1903.067, Emergency Response Facility - Eof ML20087B6431995-08-0808 August 1995 Rev 27 to Procedure/Work Plan 1904.002, Offsite Dose Projection Rdacs Computer Method ML20086B3901995-07-0505 July 1995 Rev 9 to Procedure/Work Plan 1903.067, Emergency Response Facility - Eof ML20084U7381995-06-13013 June 1995 Page 14 of Rev 20 to Procedure/Work Plan 1903.011, Emergency Response/Notifications ML20084L9881995-05-25025 May 1995 Rev 20 to Procedure/Work Plan 1903.011, Emergency Response/ Notifications ML20097B2201995-05-16016 May 1995 Change PC-2 to Rev 31 to OP-1903.060, Emergency Supply Equipment ML20083Q2961995-05-16016 May 1995 Rev 13 to Procedure/Work Plan 1905.002, Offsite Emergency Monitoring ML20083Q3071995-05-16016 May 1995 Rev 31 to Procedure/Work Plan 1903.060, Emergency Supplies & Equipment ML20083Q2891995-05-16016 May 1995 Rev 6 to Procedure/Work Plan 1903.064, Emergency Response Facility - Cr ML20083L6171995-05-0505 May 1995 Rev 9 to Procedure/Work Plan 1903.034, EOF Evacuation ML20083L6141995-05-0505 May 1995 Rev 4 to Procedure/Work Plan 1905.031, Airborne I-131 Determination Using RM-14.HP-210 ML20083L5941995-05-0505 May 1995 Rev 5 to Procedure/Work Plan 1905.004, EOF Radiological Controls ML20082E2211995-03-31031 March 1995 Rev 1 to Procedure/Work Plan 1903.068, Emergency Response Facility - Emergency News Center ML20081K0331995-03-16016 March 1995 Rev 27 to Procedure/Work Plan 1903.061, Communications Equipment Tests ML20078R0771995-02-0909 February 1995 Rev 21 to Procedure/Work Plan 1903.030, Evacuation ML20078G8921995-01-26026 January 1995 Rev 30 to Procedure/Work Plan 1903.060, Emergency Supplies & Equipment ML20078J1101995-01-13013 January 1995 Public Version of Rev 14 to Operating Procedure 1903.062, Communication Sys Operating Procedure ML20095J6271995-01-0303 January 1995 Permanent Change (Pc) PC-01 to Rev 11 to Procedure/Work Plan OP-1903.065, Emergency Response Facility Tsc 1999-08-04
[Table view] |
Text
.
. ARKANSAS POWER & LIGHT COMPANY t- Arkansas Nuclear One
\ -" RECORD OF CRANGES AND REVISIONS FOW NO. 1000.06A ESTERdET)CY PLAN PROCEDURE REV. # 12_ PC #
7(* V l Safety Related YES d NO O C0!DIUNICATIONS EQUIPMENT TESTS "th .
1903.61 REV. 2 -,
l ,, f, -
- -[\.] ,ll *
- yh ,.
.'sTUQ?,'_i iii*s p : jf{Jil.-f;}
" -i'.a1.1;.- -
e
.w . i .
.I ,1 ' , :{..
} 5,
-~
,4
'" PkGE REV PC# PAGE REV PC# PAGE REV PC# PAGE REV PC# PAGE REV PC#
J l 2 2 2 3 2 4 1 5 2 6 2 7 2 8 1 l
APPROVED BY: APPROVAL DATE
&/n 3,y/k Qgg REQUIRED EFFECTIVE DATE:
h / (General Manager) 8303300633 830325 PDR ADOCK 05000313 F PDR
PLANT MANUAL SECTION: PROCEDURElWORK PLAN TITLE: NO:
EMERGENCY PLAN Poorenttpr copMitMTrATTOMs egitTourMT Tr9TS 1003.61 PAGE 1 of 8 aavision ARKANSAS NUCLEAR ONE CHANGE 2 o*Te DATE
,1<20 a2 1.0 PURPOSE The purpose of this procedure is to provide the requirements for testing the emergency communications equipment and to identify the necessary. roster /
call lists that must be verified reriodically.
2.0 SCOPE This procedure applies to communications systems and roster / call lists that would be used during an emergency situation at ANO.
3.0 REFERENCES
3.1 References Used in Procedure Preparation 3.1.1 Arkansas Nuclear One Emergency Plan 3.2 References Used in Conjunction with this Procedure 3.2.1 None 3.3 Related ANO Procedures 3.3.1 None 4.0 DEFINITIONS None 5.0 RESPONSIBILITIES .
l 5.1 The Emergency Planning Coordinator is responsible for coordinating ANO emergency communications equipment tests as required by this procedure.
6.0 DESCRIPTION
6.1 The following communications equipment / systems are available for use -
during an emergency:
6.1.1 Continental Telephone system 6.1.2 ANO plant phone system 6.1.3 Gai-tronics paging system 6.1.4 ANO radio system 6.1.5 NRC ENS (Hotline) phone 6.1.6 NRC HPN phone 6.1.7 AP&L Microwave 7 - --. g. . w _
PROCEDURE / WORK PLAN TiiLE: NO:
PLANT MANUAL SECTION:
EMERGENCY PLAN conernitor ( nimf MT F3TTo'fc ronte'fe'P Tectc 1onS A1 PAGE 9 n cn n >o'a, ARKANSAS NUCLEAR ONE aavimoa CHANGE 2 o*T=
DATE 6.2 The following roster / call lists are maintained in each Control Room for use during an emergency:
6.2.1 Duty Emergency Coordinator Roster .
6.2.2 Staff Augmentation Group Roster / Call List 6.2.3 Beeper Assignment List 7.0 INSTRUCTIONS 7.1 The following items shall be accomplished on a monthly basis by the Emergency Planning Coordinator or'a designee:
7.1.1 Verify the operability of the direct Continental Telephone lines to each Control Room.
7.1.2 Verify the operability of the radios located in at least one of the following areas:
A. Unit One Control Room B. Unit Two Control Room C. Technical Support Center D. Emergency Control Center E. Site Vehicles (except Security vehicles)
F. Communications Equipment Locker G. AP&L Local Office
(
7.1.3 Verify the operability of the NRC-HPN phones in each one of the following locations:
A. Unit One Control Room .
l
- B. Technical Support Center C. Emergency Control Center s
e
PLANT MANUAL SECTION: PROCEDUREiWORK PLAN TITLE: NO:
EMERGENCY PLAN eencentme cometmir a, Tmts vnmouruT tests 1903.61 PAGE 3 of 8 ARKANSAS NUCLEAR ONE aavisma CHANGE 2 oars DATE tu29e82 7.1.4 Verify the telephone numbers for the following groups:
A. Nuclear Regulatory Commission B. Arkansas Department of Health
.C . Little Rock Control Center D. Four - County Sheriffs E. National Weather Service 7.1.5 Verify the placement and correctness of the roster / call lists maintained in the following locations:
A. Unit One Control Fcom B. Unit Two Control Room 7.1.6 The following communications equipment / systems do not re-quire additional testing due to the indicated reasons:
A. NRC-ENS (Hotline) phone located in each Control Room (used daily by the Shift Supervisors).
B. ANO plant phone system, AP&L microwave system and the Gai-tronics paging system (used as a part of normal plant operation).
C. Early Warning System (tested by the State of Arkansas).
7.2 Form 1903.61A, " Monthly Communications Testing Record", should be com- ~
pleted to document the performance of the monthly test.
7.3 Communications links between the plant, federal, state and local emergency operation centers and field assessment teams shall be tested annually (this may be done as a part of the plant's annual exercise). Form 1903.61B should be completed to document this test. .
8.0 ACCEPTANCE CRITERIA 8.1 Tests shall be carried to a conclusion such that the test is adequate to verify equipment operability.
8.2 Upon discovery of inoperable emergency' communications equipment, ac-tion shall be taken to initiate repair of the equipment.
NOTE: If loss of radio communication with offsite agencies occurs then an Unusual Event Emergency Action Level must be declared per procedure 1903.10, " Emergency Action Level Response".
~
L _ _ --nam.
k PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE; NO:
c EMERGENCY PLAN dl Poot-enURt' COMMUNICATIOMO FOUIPF MT TESTS 1903.61 Al ! PAGE 5 of 8
' M ARKANSAS NUCLEAR ONE aEvi: ion 2 DATE 11/29/82 CHANGE DATE r
ATTACHMENT 1 l l l 4 l l l 6 ,I i i .l l l t ! ! 1 l 1 I I x1 di l l l gl I Conusunication Links Available l l l l l l l l 8l gl l l w[ { l p-Between the Emergency Response l l l l l l l l gl al $1 l l Ul l l Centers l l l l 1 g) gl 31 m l l l l l 1 .1 l l 51 I El cl Cl l 1 glC15 li l i ,l E l 2 l e l ~.11 Il ! lM i l I
I el l =l l
gl dj 01 : I I ;;l a l l IImgin i I i
I l di 5i $l di o I wl dl 31 l 1 81* 1,o I l il .lgd8J i t v I ul al i l 21 ~l di l l 2 D1 di el 2 l l el 21 51#1ElgdEM I 01 Sl ogud i i s2i "l :1 E I I=l*l i 1=l 31 il 8 l "l'.d 8 9 3 51I al il *ni ! llIdl*@Izlgl31 l El of il El I *IM .d si ml mlLIEld5=9 I
al i gl cl g l "5I l t gi 5 d 8l S I 81 o f o l "EI 8ltpo!
ll #1 21 E l M al el 5 i g g a Il "Ikl gl
- li a'lai;l t
l ,igga tigl'lud=S m
I Si ol - ! of mi s I zi <lml mi 23ang 9
i i 11 11,5 li,e i il i i 11 e i 11 11 e 1 l CCNTROL ROOM l 13 l3,6 13,8 11 l 11 11 l l1,5'11 l6 16 11 l l 1- 14 14.8 (5 !6 16 17 12 18 18 I f8 18 I I I 11 i i i i l I i i 6 1 i i i l l ONSITE OPERATIONAL SUPPORT CENTER!3 l l3 13 11 l1 l1 l1 11 [1 l1 11 l1 l1 l l I4 1 - 14 I I I i 12 I I I f I I l 61,5 1 1 11,6 i i e il 1 i i i i i l CNSITE TECHNICAL SUPPORT CENTER 13,6 l3 l 13,8 11 11 11 12 11 11,8 11 11 l1 11 1 14,8 I4 1- 15 16 16 f7 1 15* 1 f6.Sf6,81 l l 11,6 l 11,6 l l 11 81 il - !8 il l 41 11 11 il l l EMERGENCY CONTROL CENTER l3.8 13 13,8 1 11 l l7 12 l l1,8 l l6,816,31 l l 15 i is !- 16 6 I i 18 15* ! ! l t l l 1 4 i i l i i i i e i i 1 l l RUSSELLVILLE FIRE CEPARTMENT l1 l1 11 11 l 1 11 11 l1 l1 l1 l1 l1 l1 l
! l 16 1 i f - [6 I i i6 16 i !6 16 I I l 11 i il il i i i i il i 11 11 i l i POPE COWTY SHERIFF OFFICE l 1 1 1 6 l 11 l1 l1 l6 11 l6 l6 l1 l l 16 I I I- 1 I I I I I I I I il I il 6 i i i i e i i l l NRC REGICN IV 0FFICE AND BETHESDAl7 l l l7 i l 11 i - 11 11 1 11 l1 l1 11 l l l !! 11.7 I I l l ! I l l l l l 4 i i i ,
i i i i i a e i l l AP&L CORPORATE OFFICES 11 l1 l1 l1 l1 11 'l 1 - l1 11 l1 l1 l1 11 l l LITTLE ROCK 12 12 (2 2 l l l l l l l l l 1 I il i i I i i 1 i il i 11 la l l STATE OF ARKANSAS l 11 11,8 , 1,8 [1 11 l1 l1 l-1 11 l6 l6 1 l l OFFICE OF EMERGENCT SERVTCES 8 l l (6 16 I I i [8 l 18 (8 l l l 1,*54 i*5.8 a5,811 11 6 i 11 i i il 11 i i i l DEPARTMENT OF HEALTH 8 l l l l l l1 11 l l- l1 l l 11 l
[1 11 !! l I I I le I i 18 18 I l l l l 1 e i i e i i i e i i i l i
l ST. MARY'S HOSPITAL 11 11 l1 11 11 11 11 11 11'l1 l - 11 l1 11 l l I I I I I I I l i I I I I I I l l 11 l l l l 1 1 1 61 it i i 11 6 l l POPE COWTY l6 lI l1,6 11 11 l1 11 Il 16 l6 11 l - 16 11 l l l EMERGENCY OPERATIONS CENTERS (8 1 18 16.8 16 16 l t 18 18 I i 18 I l .
l il 4 i 1 i i a i 11 11 i 11 i i !
l LOGAN, TELL*, AND JOHNSCN COWTT 16 11 l1,6 l1 l1 11 Il 11 16 l6 11 16 l - l1 l l EMERGENCY CPERATIONS CENTERS 18 ! (8 !6,8 16 16 I i 18 18 I (8 l l l l U.S. CEPARTMENT OF ENERGY j i i j i i i i l i i i i i l l OAK RIDGE RADIOLOGICAL l1 11 11 11 11 11 11 11 11 l1 11 11 11 1-I gg i COCRDINATING CFFICE I I I I l ! I l l l l i I l l CCMMWICATION LIKKSr 1 - Continental Telephone 2 - AP&L Microwave Telephone 3 - Plant Phone System 4 - Gai-Ironics Paging System 5 - AN0 Radio Frequency 4_
6 - Pope County Sheriff's Radio / Frequency 7 - Hot Line 8 - CES RadioiFrequency 7 Number 8 not applicable.
- In order for the Cept. of Health to communicate via the ANO radio frequency, the ANO radio **
a scranoler off" position.
must te tn the
- . 4 E
PLANT MANUAL SECTION: PROCEDURE / WORK PLAN title: NO:
EMERGENCY PLAN concenf te r c0?m?"fTr2TTO?fc rOf tTourMT Tt'STS 1003.61 PAGE 6 of 8
^
ARKANSAS NUCLEAR ONE aE - N CHANGE 2 DaTE DATE 11,29,82 y . ARKANSAS POWER & LIGHT COMPANY L Arkansas Nuclear One mte ..-.- - - . ~ , , . . - . . . - . . - . . . . . . - - - _ l a ao. , -
REV. # y PC i Page 1 of 2 1.0 COF21UNICATIONS EQUIPMENT OPERABILITY TEST Date 1.1 Direct Continental felephone Line I i l l Location i Results l l AS0-l l l l ANO-2 I l 1.2 ANO Radios I l l l l Location l Channels Tested l Results l 1.2.1 l ANO-l/ANO-2/ l 1,2,3,4,5,6,7,8 i I l TSC/ECC l 1,2,3,4,5,6 l l 1.2.2 l ANO Van l 1,2,3 l l 1.2.3 l AN0 Packup l 1,2,3 l l 1.2.4 l GM Car l 1,2,3 l I 1.2.5 l 4bD Vehnete l 1,2,3 l l 1.2.6 (Portable Radtos:l l l 1,2,3 l Unit l l l 1,2,3 l Unit l l l 1,2,3 l Unit l l l 1,2,3 l Unit l l l 1,2,3 l Unit l l l 1,2,3 l Unit l l l 1,2,3 l Unit l l l 1,2,3 l Unit l l l 1,2,3 l Unit l l l 1,2,3 l Unit l l l 1,2,3 -
l Unit l l l 1,2,3 l Unit l l l 1.2.7 i SCBA Bone i l !
l Phones l l l l (4 Total) l NA I i 1.3 NRC-HPN Phones C:
l l l l Location l Results l l ASU-l'ANu-2/ISC/ECC l l W E %m b .4
G PLANT M ANUAL SECTION: PROCEDURE / WORK PLAN TITLE.; NO:
EMERGENCY PLAN DQncentfor COMMitMTcATTOM9 enftTpupIT trSTS 1901.r1 PAGE 7 of g
~
ARKANSAS NUCLEAR ONE armia CHANGE
> o*Te DATE
=9m y ARKANSAS POWER & LIGHT COMPANY L Arkansas Nuclear One l
N .......,. --,,,,. ..-,..-,.- . ,,..,.- -----, I F0" ""
~
~
REV. # i FC s ',
Page 2 of 2 1.4 Key Button Pbnes j Locatton l Lines Tested i Results . l I I I i 1.4.1 }l l l lANO-1(Sta.
l l I l
1.4.2 lANO-2(Sta. }l l l 1 1 1 1 1.4.3 (Sta. )l l l lTSC 1 I i 1
1.4.4 (Sta. )l l l lECC 2.0 TELEPHONE NLHEER VERIFICATION I I I Agency l Phone No. l 2.1 l_C l NR l l 2.2 i Department of Health l i 2.3 l Little Rock Control Center l l 2.4 l Nattonal Weather Service l l 2.5 l Pope County Sheriff l l 2.6 l Yell County Sherif f l l 2.7 l Johnson County Sheriff I l 2.8 l Logan County Sheriff I l 2.9 i Pope Co. AM ulance Service l I 2.10 l Russellville Fire Department ! l 2.11 i St. Marv's Hospital l l 2.12 1 Millard Henry Clinic l l
! I 2.13 l Babcock & Wilcox 2.14 l Combustton Engineering i i 3.0 ROSTER / CALL LIST VERIFICATION I I 1- 1 l List l ANO-1 l ANC L i 3.1 l Duty Emergency Coordinator l l l g i Staff Augmentation Group I l l 3.2 i Engineertng (T.S.) l l l l Health Physics l l l l l 3.3 i Beeper Asstenment List l 4.0 CORRECTIVE ACTION REQUIRED (IF ANY):
'=
I I
l l
l 1
Performed By
" m ;
[