Interim Deficiency Rept,Item E-35 Re Nonconforming Electrical Panel Foundation Welding.Initially Reported on 830104.Paint Removal & Insp Will Be Completed by 830830. Next Rept Will Be Submitted by 831010
ML20072K487
Person / Time
Site: Zimmer
Issue date: 06/28/1983
From: Williams J
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, LOZ-83-0063, LOZ-83-63, NUDOCS 8307060297
Download: ML20072K487 (2)


Text

..

es

-==mw~

THE CINCINNATI GAS & ELECTRIC COMPANY CINCINN ATI, OHIO 4520t June 28, 1983 LOZ-83-0063 J. WILLIAMS, JR So"17,%Z7/r',ol~[

Docket No. 50-358 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 i

Attention:

Mr. J.G. Keppler Regional Administrator Gentlemen:

RE:

WM.~H.

ZIMMER NUCLEAR ~ POWER STATION - UNIT 1 10CFR50.55(e), ITEM E-35, ELECTRICAL EQUIPMENT FOUNDATION WELDING W.O.

57300, JOB E-5590, FILE NO. 956C, E-35 This letter constitutes an interim report concerning the subject condition initially reported to the Commission on January 4, 1983 as a potentially reportable deficiency under the requirements of 10CFR50.55 (e).

As stated in our previous letter, LOZ-83-0010, dated March 25, 1983, evaluation of the conditions found during a surveillance of electrical panels by Henry J. Kaiser Company (HJK) and The Cincinnati Gas & Electric Company indicated the need to reinspect all essential panel installations for compliance with' design document requirements.

HJK has developed and approved two Construction Inspection Plans (CIP's) for the surveillance of paint removal and the i

inspection of the electrical panel mounting welds.

HJK has identified 91 panels that require reinspection utilizing these CIP's.

Foothill Electric Company (FEC) has generated 19 work packages to remove paint.

The paint renoval and inspection effort is expected to be completed tur August 30,-1983.

A follow-up report will be submitted by October 10, 1983.

'JUN 3 0 ES3 l 0-r307060297 830628 PDR ADOCK 05000358 O

PDR

-JN

4 Mr. J.G.

Keppler Regional Administrator June 28, 1983 LOZ-83-0063 Page 2 We trust the above will be found acceptable as an interim report under 10CFR50.55(e).

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By

[A_ h tm

. T,ILLIAMS, JR.

/

SENIOR VICE PRESIDEN DJS/CFK/sfr cc: