ML20072K019
| ML20072K019 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 06/28/1983 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | Varga S Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20072K023 | List: |
| References | |
| NUDOCS 8307010182 | |
| Download: ML20072K019 (1) | |
Text
r Melung Addra6e Alabama Power Company 600 North 18th Street Post Offica Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.
%%;'C:T,7"'
AlabamaPbwer the southem electnc sntem Docket Nos. 50-348 50-364 June 28, 1983 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention:
Mr. S. A. Varga Joseph M. Farley Nuclear Plant Post Trip Review Procedures Gentlemen:
By letter dated May 24, 1983, Alabama Power Company committed to modify the Farley iluclear Plant procedures associated with post trip review.
Enclosed for your review is the modified portion of the Conduct of Operations - Operations Group procedure which totally addresses post trip review. This procedure, which was approved by temporary changes on June 16 and June 28, 1983, documents present practices and addresses the following items:
1.
information available for post trip review 2.
criteria against which post trip results are reviewed 3.
identification of review persons / groups and timeliness of review 4
identification of significant aspects of trip conditions prior to return to criticality.
These temporary procedure changes are currently being incorporated into a permanent procedure revision.
It is expected that the permanent revision will be approved within 60 days.
If you have any questions, please advise.
Yours very truly, O!oo
.C F. L. Clayton, Jr.
FLCJr/JLO:lsh-D30 Enclosure cc:.Mr. R. A. Thomas Mr. G. F. Trowbridge
\\
Mr. J. P. O'Reilly Mr. E. A. Reeves 00 Mr. W. H. Bradford l
\\
_-