Notifies of Completion of All Plant Mods Associated W/Ie Bulletins 79-02 & 79-14.Proposed Mods 2,3 & 4 Completed in May 1983.Proposed Mod 1 Not Implemented
ML20072J925
Person / Time
Site: Pilgrim
Issue date: 06/16/1983
From: Harrington W
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
REF-SSINS-6820, REF-SSINS-SSINS-6 83-154, IEB-79-02, IEB-79-14, IEB-79-2, NUDOCS 8307010082
Download: ML20072J925 (2)


Text

'

n.

EDETON EDISDN COMPANY B00 BOYLsTON STREET 80sTON. MASSACHUSETTS 02199 WILLIAM D. HAM!PINGTON sensam vees posesosav ND[LsAS June 16, 1983 BECo Letter No.83-154 Regioral Administrator U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 License No. DPR-35 Docket No. 50-293

Subject:

Status of Four Remaining Modifications for IE Bulletins 79-02 and 79-14

Reference:

Boston Edison Company Letter (A.V. tiorisi) to NRC (R.C. Haynes),

dated July 19, 1982 (BECo Letter #2.82.195) l

Dear Sir:

This letter is intended to serve as notification of the completion of all plant modifications associated with IE Bulletins 79-02 and 79-14.

In the above Reference, Boston Edison Company identified the following four minor modifications as not being complete when we submitted the final report on IE Bulle-tins 79-02 and 79-14.

(1) H-29-1-9SG (79-02 Fix) Salt Service Water System Fix: Addition of washers to correct oversized bolt holes in base plate (2) H-30-1-286 (79-14 Fix) RBCCW System Fix:

Addition of bracing member with base plate (3) H-30-1-92 (79-14 Fix) RBCCW and TBCCW Systems Fix:

Increase weld sizes and add a bracing member (4) H-30-1-376 (79-14 Fix) RBCCW System l

Fix:

Increase weld sizes These modifications were minor in nature and neither system operability nor l

plant safety was affected.

Proposed modifications (2), (3) and (4), as listed above, were completed in May, l

1983. Proposed modification (1) was not implemented.

A structural reanalysis i

performed in April,1983, justified the structural acceptability of this support

. in its present condition.

\\

M gFia881t*J889J -

t go

d~

g COOTON EDIXON COMPANY Mr. Tom Murley, Regional Administrator Page 2 These modifications and the one reanalysis were performed in conformance with the requirements of NRC IE Bulletins 79-02 and 79-14. As such, Boston Edison's FINAL REPORT to IE Bulletins 79-02 and 79-14 is now inclusive of all seismic Category 1 supports at Pilgrim Station.

Should you require further information on this

issue, please contact us.

Very truly yours, h

l

_ _ - _ - _ - _ _ _