Interim Deficiency Rept Re Inadequate Svc Level 1 Coatings (Item S-5).Initially Reported on 820928.Removal & Replacement of Coating Necessary Except Where Inaccessible. Corrective Action Program Being Developed
ML20072J588
Person / Time
Site: Zimmer
Issue date: 06/23/1983
From: Williams J
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, LOZ-83-0070, LOZ-83-70, NUDOCS 8306300160
Download: ML20072J588 (2)


Text

J.

v

-= === W '

THE CINCINNATI GAS & ELECTRIC COMPANY C~

CINCINN ATI, OHIO 45201 June 23, 1983 LOZ-83-0070 J. WILLIAM S, J R SENION v#CE PRESIDENT NUCLEAR OPERATIONS Docket No. 50-358 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention:

Mr. J.G.

Keppler Regional Administrator Gentlemen:

RE:

WM. H.

ZIMMER NUCLEAR POWER STATION - UNIT 1 10CFR50.55(e), ITEM S-5, INADEQUATE SERVICE LEVEL I COATINGS W.O.

57300, JOB E-5590, FILE NO. 956C, S-5 This letter constitutes an interim report concerning the subject condition, initially reported to the Commission on September 28, 1982 as a potentially reportable deficiency under 10CFR50.55 (e).

On June 15, 1983, CG&E requested an extension for submittal of this interim report until June 24, 1983.

As outlined in our previous interim report, LOZ-83-0016, dated April 14, 1983, CG&E has evaluated reports submitted by KTA-Tator, Inc. and Sargent & Lundy Engineers on the adequacy of the service level I coatings and has concluded that removal and replacement of these coatings is necessary except for a small amount which is inaccessible.

CG&E is developing a corrective action program for the resolution of this deficiency.

We will keep you informed of our progress.

WiUN 27 h ;

8306300160 830623 JUN 27 T9dd __h gDRADDCK 05000 2 l

I

Mr. J.G. Keppler Regional Administrator June 23, 1983 LOZ-83-0070 Page 2 We trust the above will be found acceptable as an interim response under 10CFR50.55 (e).

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY

~

By

. WILLIAMS, JR.I ENIOR VICE PRES DENT DJS/PEB/sfr cc:

NRC Office of Inspection &_ Enforcement Washington, D.C.

20555 NRC Senior Resident Inspector ATTN:

W.F. Christianson NRC Zimmer Project Inspector, Region III ATTN:

E.

R. Schweibinz