ML20072J522
| ML20072J522 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 08/19/1994 |
| From: | Stetz J CENTERIOR ENERGY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9408290081 | |
| Download: ML20072J522 (5) | |
Text
,
~.
o CENTERIOR ENERGY 0200 Ook 1ree Bouieco Mo! Accress Independente OH PO Ba 94661 216 447 3100 C eve'ona DH 441014061 Docket Number 50-346 License Number NPF-3 Serial Number 2244 August 19, 1994 United States Nuclear Regulatory Commission Document Control Desk Vashington, D. C.
20555 Subj ect:
Semiannual Fitness-For-Duty Report January - June, 1994 Gentlemen:
Pursuant to 10 CFR 26.71(d) " Record Keeping Requirements", Toledo Edison submits its Semiannual Fitness-For-Duty (FFD) report for the period of January - June 1994 for Davis-Besse Nuclear Power Station, Unit 1. provides Toledo Edison's FFD Program Performance Data.
Attachment 2 provides a summary of management actions taken by Toledo Edison based on positive FFD testing results, presumptive positives, and a list of FFD event reports submitted by Toledo Edison.
Should you have any questions or require additional information, please contact.
Mr. Villiam T. O'Connor, Manager - Regulatory Affairs, at (419) 249-2366.
V - truly yours J in P.
z Vice President - Nuclear Davis-Besse Nuclear Power Station GAB / eld 9408290001 940819 PDR ADOCK 05000346 PDR Attachments F
cc:
L. L. Gundrum, NRC Project Manager J. B. Martin, Regional Administrator, NRC Region III S. Stasek, DB-1 NRC Senior Resident Inspector Utility Radiological Safety Board cp q...,
... L d C i /d
}'l e
Operating Companies i
Cleveiord Ilectoc muminating Toledo Ed: son
..m
Docket Number 50-346 License Number NPF-3 Serial Number 2244 Toledo Edison's Fitness-For-Duty Report January - June 1994
Docket Number 50-346 Licenpe Number NPF-3 Serial Number 2244 Page 1 of 2 Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 i
June 30 1994 Toledo rdinon cm a unnes Em Davis-Besse toanson W. T. O'Connnr._
(419) 249-2366 contaa Nem Phone (mouse stes cone)
Manager - Regulatory Affairs Cutoff s: Screen / Confirmation (ng/ml)
Q Appendix A to 10CFR 26 Marijuana 50 / 15 Amphetamines 1000
/ 500
/
/
Cocaine 300 /150 Phencyclidine 25
/ 25
/
Opiates 300 /300 Alcohol (% BAC) 0.04 Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number witt Unescorted Access 980 96
~
Categories Tested Positive Tested Positive Tested Positive Pre-Access 50 0
53 0
k Post accident
]1 0
0 0
h Observed behavior i
)
1 0
Random 409 0
16 0
Follow-up 18 0
1 0
Other 0
0 0
0 Total 489 1
73 0
REV.1/92
i
- ?C8 xnmon
' Breakdown of Confirmed Positive Tests for Specific Substances ag;gg
" if ",8 "
Amphe-Phency-Refusal S S E 2: E Manjuana Cocame Opiales tamenes ekhne Alcohol to Test 1
2 3
4 5
w " E 5 $-
~?EO Ucensee Employees 0
1 0
0 0
0 0
"5g
&1 1 Lon0. Term Contractors
- 7$
ue Stat-Term Contractors 0
0 0
0 0
0 0
A Total 0
1 0
0 0
0 0
1 e
b 6
4 e
6
Docket Number 50-346 License Number NPF-3 Serial Number 2244 TOLEDO EDISON'S MANAGEMENT ACTIONS RELATING TO FITNESS-FOR-DUTY Toledo Edison Contractor Personnel Personnel Referred to EAP 1
0 Management Sanctions 1
0 Toledo Edison does not perform onsite initial drug screening tests; therefore, there are no unconfirmed presumptive positive results on which to base management actions.
TOLEDO EDISON'S FITNESS-FOR-DUTY REPORTS There were no Fitness-For-Duty reports submitted during this reporting period (January - June 1994).
i