Third Interim Rept on Significant Const Deficiency 70 Re GE 480-volt Trip Coil Failure to Drop Out After Tripping. Corrective Action Complete & Supporting Documentation Under Review.Final Rept Will Be Submitted by 830722
ML20072J429
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/22/1983
From: Drummond F
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3I83-0227, W3I83-227, NUDOCS 8306300099
Download: ML20072J429 (1)


Text

"*

I OUISIANA 242 oaAnONOe srnar POWER & LIGHT P O. BOX 6008

  • NEW ORLEANS. LOUISIANA 70174 . (504) 366-2345 UfuSN sysY$

June 22, 1983 W3183-0227 Q-3-A35.07.70 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission hihi)h j i n xa 01 l

2dN ti i

SUBJECT:

Waterford SES Unit No. 3

~

L Docket No. 50-382 L l

Significant Construction Deficiency No. 70 "GE 480-V Trip Coils Do Not Drop Out After Tripping" Third Interim Report

REFERENCE:

LP&L letter W3183-0160 dated May 11, 1983

Dear Mr. Collins,

The above rcEerenced letter indicated submittal of a Final Report to the USNRC no later than June 22, 1983.

At the present time, all corrective action is complete. Thu supporting document-ation is currently under review by LP&L and Ebasco.

A Final Report will therefore be submitted to the USNRC by July 22, 1983.

Very eruly yours, fwd F. J. Drummond f

Project Support Manager - Nuclear cc: 1) Director 3) Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

2) Director 4) Mr. W. M. Stevenson Office of Management  ;

Information and Program Control l U. S. Nuclear Regulatory Commission Washington, D. C. 20555

.G

' h}

8306300099 830622

/ ll0 PDR ADOCK 05000362 S PDR J