Amends 62 to License NPF-73,revising TS to Add New Footnote (1) Re 2RSS*P21A Pump Performance Requirements
ML20072J103
Person / Time
Site: Beaver Valley
Issue date: 08/22/1994
From: Chris Miller
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20072J110 List:
References
NUDOCS 9408260199
Download: ML20072J103 (4)


Text

-... -.

i Y "GUQ h

4 UNITED STATES j,

j NUCLEAR REGULATORY COMMISSION

'f WASHINGTON, D.C. 20555-0001 q

4 0

9 9

DUOVESNE LIGHT COMPANY OHIO EDISON COMPANY THE CLEVELAND ELECTRIC ILLVMINATING COMPANY THE TOLEDO EDIS0N COMPANY DOCKET N0. 50-412 BEAVER VALLEY POWER STATION. UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE r

Amendment No. 62 License No. NPF-73 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Duquesne Light Company, et al. (the licensee) dated August 17, 1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

1 9400260199 940822 PDR ADOCK 05000412 P

PDR

4 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-73 is hereby amended to read as follows:

(2) Itchnical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 62, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto are hereby incorporated in the license. DLC0 shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION p) o Charles L. Miller, Acting Assistant Director for Region I Reactors Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: August 22, 1994

ATTACHMENT TO LICENSE AMENDMENT N0. 62 FACILITY OPERATING LICENSE NO. NPF-73 p_0CKET NO. 50-412 Replace the following page of the Appendix A Technical Specifications with the enclosed page.

The revised page is identified by amendment number and contains vertical lines indicating the areas of change.

Remove Insert 3/4 6-13 3/4 6-13 i

)

NPF-73 CONTAItiMENT SYSTEMS SURVEILLANCE REQUIREMENTS (continued) d.

At least once per 18 months, during shutdown, by verifying, that on recirculation flow, each recirculation spray pump develops a differential pressure of 2 112 psid at a flow of 2 3500 gpm. '"

l e.

At least once per 18 months during shutdown, by:

1.

Cycling each power operated (excluding automatic) valve in the flow path not testable during plant operation, through at least one complete cycle of full travel.

2.

Verifying that each automatic valve in the flow path actuates to its correct position on a test signal.

l 3.

Initiating flow through each Service Water subsystem and its two associated recirculation spray heat exchangers, and verifying a flow rate of at least 11,000 gpm.

f.

At least once per 5 years by performing an air or smoke flow test through each spray header and verifying each spray nozzle is unobstructed.

(1)

Until the beginning of the fifth refueling outage (Mode 5) or until an outage of an expected duration of 30 days or greater, whichever occurs first, 2RSS-P21A recirculation spray pump is only required to develop a dif ferential pressure of > 110 psid at a flow of > 3275 gpm.

1 l

BEAVER VALLEY - UNIT 2 3/4 6-13 Amendment No.62