ML20072H556
| ML20072H556 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 03/08/1983 |
| From: | Howard J BOSTON EDISON CO. |
| To: | Haynes R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20072H560 | List: |
| References | |
| 83-68, NUDOCS 8303290476 | |
| Download: ML20072H556 (1) | |
Text
_
g BOSTON EDISON COMPANY 7
800 BovLETON STREET BOSTON, MASSACHUSETTE D2199 WILLIAM D. HARRINGTON etween veen passessm?
N3ELEAn March 8, 1983 BEco. Ltr. #83-68 Mr. Ronald C. Haynes Office of Inspection and Enforcement Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 License No. DPR-35 Docket No. 50-293 Radioactive Effluent and Waste Disposal Report Including Radiological Impact on Humans -
July 1 through December 31, 1982
Dear Sir:
In accordance with 10 CFR 50.36a(a)(2) and Pilgrim Nuclear Power Station Technical Specification 6.9.C.1, Boston Edison Company hereby submits the Pilgrim Nuclear Power Station Radioactive Effluent and Waste Disposal Report Including Radiological Impact on Humans. The reporting period is from July 1, 1982 through December 31, 1982.
The report format and content are in accordance with NRC Regulatory Guide 1.21, Revision 1, Measuring, Evaluating, and Reporting Radioactivity in Liquid and Gaseous Effluents from Light-Water Cooled Nuclear Power Plants, Tables 1A, 1B,1C, 2A, 2B, 3, 4A-1, 4A-2, and Supplemental Information.
Very truly yours, Enclosure cc: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D. C.
20555 Mr. Robert Hallisey, Director Radiation Control Unit Massachusetts Department of Public Health Room 770 660 Washington Street Boston, MA 02111 f
8303290476 830300
((
PDR ADOCK 05000293 R
_ - - _ - - - _ -