Interim Significant Deficiency Rept SD-33 Re Svc Water Pump Lubricating Water Strainer Clogging.Initially Reported on 830331.New Strainers of Increased Mesh Size Will Be Installed & Shaft Sleeves Replaced by Late Fall 1983
ML20072G163
Person / Time
Site: Millstone 
Issue date: 06/13/1983
From: Counsil W
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
10CFR-050.55E, 10CFR-50.55E, B10811, SD-33, NUDOCS 8306280346
Download: ML20072G163 (1)


Text

f

+

General Offices e Seldon Street, Berlin, Connecticut

'"C'"""'"'"**"""

5 P.O. BOX 270

.a ms mesa.c.ea ca e=

HARTFORD. CONNECTICUT 06141-0270 g

-=ew.s,vuvanu==ccw -

(203) 666-6911 sentwas, i.uasaa swaov cow-June 13,1983 Docket No. 50-423

\\

B10811 j Dr. Thomas E. Murley Region I Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406

Reference:

(1)

W. G. Counsit letter to R. C. Haynes, Millstone Nuclear Power Station, Unit No. 3, Reporting of Potential Significant Deficiencies in Design and Construction:

Service Water Pump Lubricating Water Strainer Clogging (SD-33), dated March 31,1983..

Dear Sir:

Millstone Nuclear Power Station, Unit No. 3 Reporting of Potential Significant Deficiencies in Design and Construction: Service Water Pump Lubricating Water Strainer Clogging (SD-33)

In Reference (1), Northeast Nuclear Energy Company (NNECO) reported a potential significant deficiency as required by 10CFR50.55(e). The deficiency involved clogging of the service water pump lubricating water strainers, which if left uncorrected could lead to failure of the pump bearings.

Following the recommendation outlined in Reference (1), NNECO will install new strainers of increased mesh size and replace the existing shaft sleeves with a harder sleeve material. These corrective actions are to be completed by late fall,1983.

NNECO considers these corrective actions sufficient to resolve this significant deficiency. Therefore, this letter constitutes our final report closing out all items related to SD-33. We trust the above information satisfactorily responds to your concerns.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY IM W. G. Counsil Senior Vice President kh 0 00 d