ML20072F846

From kanterella
Jump to navigation Jump to search
Forwards 830615 Change Request for NPDES Permit TN0026450 Re 60-day Extension of Submittal of Thermal Plume Rept Required by Part Iii.E
ML20072F846
Person / Time
Site: Sequoyah  
Issue date: 06/22/1983
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Adensam E
Office of Nuclear Reactor Regulation
References
NUDOCS 8306280178
Download: ML20072F846 (2)


Text

,

/

4, p.-

' TENNESSEE VALLEY AbTHORITY CH ATTANOOGA, hENNESSEE 374ot 400 Chestnut Street Tower II June 22, 1983 Director of Nuclear Reactor Regulation ~

Attention: Ms. E. Adensam, Chief Licensing Branch No. 4

., Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555 a

Dear Ms. Adensam:

~

In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 InaccordancewithEnvironmentalTechnicalSpecificationSection5.5.2fEr the Sequoyah Nuclear Plant units 1 and 2, we are providing for your information the enclosed notification of a request dated June 15, 1983 to the Environmental Protection Agency for a change in the National Pollutant Discharge Elimination System (NPDES) Permit No. TN0026450.

The change requests a 60-day extension of submittal of the Thermal Plume Report required in Part III.E of the permit.

If you have any questions, please call Ken Parr at FTS 858-2685.

Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, nager Nuclear Licensing Sworn subsc bed before me this ay of L41) 1983 daddkM %)&

Notary Public g'c / "

4 My Commission Expires

/

Enclosure oc:

U.S. Nuclear Regulatory Commission (Enclosure)

Region II Attn:

Mr. James P. O'Reilly Administrator 101 Marietta Street, NW, Suite 2900 pp/

Atlanta, Georgia 30303 Ifj I

8306280178 830622 i

l PDR ADOCK 05000327 t

P PM An Equal Opportunity Employer

1 i

JUll 151983 1

Mr. Paul J. Traina, Director Division of Water Manager.ent U.S. Environmental Protection Agency, Region IV 345 Courtland Street, NE.

Atlanta; Georgia 30365

Dear Mr. Traina:

SEQUOYAH NUCLEAR PLANT - NPDES PERMIT NO. TN0026450

. In accordance with discussions between Doug Langford and Charlie Kaplan of you/ staff and Wally Carpenter of my staff on April 27, the Tennessee Valley Authority (TVA) requests a 60-day extension on submittal of the Thermal Plume Report required in Part III.E of the permit. The data for this report will be incorporated with information collected for TVA's demonstration of compliance with thermal limits using the " computed compHance method." Extension of the report. submittal date will allow us to document fully all of-our field data collected to date.

If you have any questions concerning our request, please contact Wally Carpenter at (615) 632-3937 or PTS 856-3937.

Sincerely, Original Signed By M. Paul Schmierbach t

Mohamed T. El-Ashry, Ph.D.

Director of Environmental

[N

Quality SWH:DW cc: Mr. Wayne Carfinkal U.S. Environmental Protection Agency. Region IV 345 Courtland Street, NE.

~~-----%_.

Atlanta, Georgia 30365 E.EC._'.., g n,-.,

Mr. Charles Kaplan

  • '~>

t U.S. Environmental Protection

, h,a,, _,,3 l

Agency, Region IV E;ijg,j j

~

345 Courtland Street, NE.

Atlanta, Georgia 30365 RECEIVED Continued on page.2 JUN 10 B83 UCENSING STAFF l

l

.m g.

y

-. -... u

2 Mr. Paul J. Traina 14r. Douglas Langford U.S. Environmental Protection Agency, Region IV 345 Courtland Street, NE.

Atlanta, Georgia 30365 Mr. Jack McCormick, Basin Chief Chattanooga Basin Office Division of Water Management 2501 Milne Street Chattanooga, Tennessee 37406 Tennessee Division of Water Management 150 Ninth Avenue, North TERRA Building Nashville, Tennessee 37203 NUC PR ARMS, 1520 CST 2-C B. W. Brown, Jr., 140 EB-K H. J. Green, 1750 CST 2-C M. W. Hines, 318 MPB-M C. L. Massey,125 IBM-C l

L. M. Mills, 400 CST 2-C H. S. Sanger, Jr., E11B33C K Z

i Principal'ly prepared by S. W. Hixson (NUC PR); with concurrence of J. L.

Taylor (SQN), W. R. Waldrop (A&WR) and R. L. Thomas (POWER).

l s m me

=,e=+

nemme 2 w mm a s s m e.,,

ye,

.o

--e a

,e s,

.ng.,

,m e,_

m_,.,

w,

_,g_